BP Experiences -- Guided Wave Radar Level Instruments Rick Stanley API SOICS April 2008.

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

Factory Objectives Value of Asset Management Strategies.
Configuration management
Software change management
Configuration management
Printer Maintenance Proper printer maintenance can prevent many problems and lessen the effects of others. Routine printer maintenance procedures vary.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
EECE499 Computers and Nuclear Energy Electrical and Computer Eng Howard University Dr. Charles Kim Fall 2013 Webpage:
MUST HAVE SHOULD HAVE COULD HAVE Module # 150. Dealing with Process Upsets Objectives –Will be able to recognize an Upset –Will be able to analyze an.
Test-Driven Development and Refactoring CPSC 315 – Programming Studio.
Lecture 3: Take-off Performance
Guided Wave Radar Pros and Cons
Hemoglobin Testing Using the HemoCue. Instrument calibration At the beginning of each survey day, check the instrument accuracy using the calibrator cuvette.
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
Global Design Effort Compact Water Cooled Dump Resistor IRENG07 Wes Craddock September 19, 2007.
Business Statistics for Managerial Decision
Vibration Sensors for Cooling Towers Challenges Cooling towers offer the vibration analyst many challenges in sensor selection, mounting and environmental.
The Comparison of the Software Cost Estimating Methods
RIT Software Engineering
SE 450 Software Processes & Product Metrics 1 Defect Removal.
EE694v-Verification-Lect5-1- Lecture 5 - Verification Tools Automation improves the efficiency and reliability of the verification process Some tools,
ACADs (08-006) Covered Keywords Calibrate, direct, inferred, transmitter calibration, gravity correction, density correction, hydrostatic head detector,
NorCal Tech 2005 Technical Conference
Statistical Process Control
Submitted by Waris jamal Praveen kumar gautam Shiv pratap singh Ramashwar kumar singh Under the guidence of Prof.safiulla khan.
Software Testing Verification and validation planning Software inspections Software Inspection vs. Testing Automated static analysis Cleanroom software.
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
Water Level loggers Vented vs Absolute. Definitions Absolute: Measures total pressure (weight) above the sensor. Atmospheric pressure must be removed.
By the end of this lesson you will be able to explain: 1. What is the BOOT process 2. A Cold Boot 3. A Warm Boot.
HVAC523 Circulator Pumps.
Smart transmitters.
Problem Determination Your mind is your most important tool!
Maintaining the Flow ! Testing of Nuclear Feedpumps (and other important pumps)
EGRE 427 Advanced Digital Design Figures from Application-Specific Integrated Circuits, Michael John Sebastian Smith, Addison Wesley, 1997 Chapter 4 Programmable.
Fundamentals of Data Analysis Lecture 9 Management of data sets and improving the precision of measurement.
Power Control System for a Concrete Durability Test Cabinet – Phase 2 Jacob Jameson Madhav Kothapalli Thomas Persinger Andrew Versluys.
Configuration Management (CM)
TPO Lap Splicing Lap Splicing Lap splicing on a TPO system is defined as joining two separate sheets, by way of heat welding, into one monolithic sheet.
Testing Basics of Testing Presented by: Vijay.C.G – Glister Tech.
Testing -- Part II. Testing The role of testing is to: w Locate errors that can then be fixed to produce a more reliable product w Design tests that systematically.
Sphere Standards and Standard Spheres Dr. Richard Young Optronic Laboratories, Inc.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 22 Slide 1 Software Verification, Validation and Testing.
A Use Case Primer 1. The Benefits of Use Cases  Compared to traditional methods, use cases are easy to write and to read.  Use cases force the developers.
Sylnovie Merchant, Ph.D. MIS 161 Spring 2005 MIS 161 Systems Development Life Cycle II Lecture 5: Testing User Documentation.
Chapter 8 Lecture 1 Software Testing. Program testing Testing is intended to show that a program does what it is intended to do and to discover program.
CUE – Make Any Pump an E-Pump
Ircon ® ScanIR ® 3 Linescanner How to deal with sectors/zones? Rev. A 07/2013.
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
Karlstad University Computer Science Design Contracts and Error Management External and internal errors and their contracts.
Network management Network management refers to the activities, methods, procedures, and tools that pertain to the operation, administration, maintenance,
Ex. 6 - Straight-and-Level Flight Ex. 6 – Straight-and-Level Flight.
InnoSys Park Brake Tool Master Control Panel Screens Revision A, 12Dec /12/20071.
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
Smart Board Troubleshooting.  The User Guide contains useful information such as installing, connecting, maintaining, and troubleshooting your Smart.
ABOUT INSTRUMENTATION Instrumentation is used in almost every industrial process and system, where consistent and reliable operations are required. Instrumentation.
Advance startup options Shift Restart. Restart options.
SAL COLLEGE OF ENGINEERING AHMEDABAD LIQUID LEVEL MEASUREMENT
Programming Logic and Design Fourth Edition, Comprehensive Chapter 10 Using Menus and Validating Input.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Paul van Mulbregt Sheera Knecht Jon Yamron Dragon Systems Detection at Dragon Systems.
Stats Methods at IC Lecture 3: Regression.
Alpha – Project steps & common errors
Tool removed during cycle Fault #2
Control System Instrumentation
Control System Instrumentation
CS 1111 Introduction to Programming Fall 2018
Model Output Current Battery Life BATPSU VDC 2A 1.2Ah BATPSU VDC 2.3Ah
Instruments & Electrical Measurements Lecture 4
Presentation transcript:

BP Experiences -- Guided Wave Radar Level Instruments Rick Stanley API SOICS April 2008

2 Overview BP Inventory Overall Experience Design and Operation Issues −Configuration −Off Normal Behavior −Physical Design Wish List and Path Forward

3 BP Inventory Guided Wave Levels used at all 5 BP US Refineries −Whiting – 75 −Texas City – 50+ −Cherry Point – 40+ −Carson Services −Propane storage bullets −Cooling towers −Process levels −Interfaces Overall experience is good, but there are problem applications −Configuration issues −Post startup adjustments −Consistency and reliability of measurements

4 Understanding Configuration Many Choices – difficult to make the right ones Manufacturer guidelines haven’t been that effective −Contractors incompletely specify configuration −Deeper understanding of application requirements Understanding of what the choices mean and how they interact is experience that we are only now getting Some areas of difficulty −Null zone and hold off −Dielectric selection −Thresholds −Out of range behavior −Fault behavior

5 Some Real Examples Carson 2008 Turnaround – Installed about 40 Guided Wave Levels Shop testing – water fill Manufacturer tech support on site multiple times Some installation difficulties Several head swaps prior to startup Despite a lot of effort, we were adjusting things prior to and during startup Post TAR – Almost all GWR are reading OK and are stable – but it took a lot of work to get there We seem to have more difficulties than TxC and Whiting have had, but distance has a way of dulling experiences. Everyone has successes and problem applications

6 Hold Off, Blocking Distance and Null Zone Several heads had to be remote mounted due to clearance Extension of cable from probe to head lead to mis-interpretation of parameter adjustments required Initial operation resulted in end of probe not detected faults Faults forced output to 100% even at zero level Consultation with factory resulted in correction of parameters Problem was fixed, but at cost of operations confidence 3 Services with dual GWR – pulled one and replaced with DP

7 Dielectric Instruments require careful dielectric selection – process design basis may not be right Example -- DEA contactor −Instrument set for high dielectric (water based) −During startup hydrocarbon overfill into DEA contactor −Magnetic float indicated 4”, DP indicated 30” and guided wave indicated 0. −Guided wave had been indicating up until hydrocarbon carry over −Corrected dielectric for hydrocarbon – revealed actual level of about 50” −Left at hydrocarbon dielectric and seems to be working since Similar issues to be expected in flare KO drums and similar places why water and hydrocarbon may exist

8 Trend of Hydrocarbon onto DEA

9 Threshold Appropriate thresholds for detection of level surface aren’t always constant Auto-sense functions can lead to erroneous levels Hydrocarbon level in flash drum −Guided wave and through the air radar tracked very well −Guided wave went to 100% - Investigation found that threshold had been lost. Reset to manual threshold and they have been tracking since Empty Drum −Threshold set to automatic – result was spikes in level even though drum was empty −Set to fixed threshold, but still having issues with empty drum −Had to adjust thresholds differently on parallel services

10 Hydrocarbon – GWR vs. Through Air Radar

11 Out of Range Behavior Experiencing problems with instruments when level is outside probe range Want signal to stay at 0% when level falls below probe or configured range and 100% when level increases beyond probe or configured range Having difficulty getting reliable behavior in empty vessels Instruments appear to be going into fault, which drives the signal to its configured fault output – this means a low level can indicate as a high level Need reliable and predictable out of range performance.

12 Installation External Chambers −GRW manufacturers were generally not planning on getting into the chamber business. −Users view has been to buy these like displacers – complete assemblies with chambers Attempts at response have been mixed. Design development and fabrication quality −Materials −Basic design −Welding quality Recent projects have resorted to piping fabricators or local fabrication

13 Installation Guided wave installations often don’t have platforms View of heads is limited or not possible – operations hasn’t been happy about that Need a means of relocating display to grade without affecting radar path Long rods are subject to being bent when being removed or re-installed.

14 Documentation Guided wave specific specification form Baseline configuration for common applications −Hydrocarbon level −Mixed service level −Interface −Water −Dry vessel Configuration data storage −Manufacturer’s programs −AMS or similar systems

15 We Know What These GWR’s areDoing :-)

16 Wish List – Path Forward Use of GWR has generally been quite successful and well accepted Some services still need work and have impacted the attitudes of those who own them Effectiveness of manufacturer support is still spotty −On site support is needed for commissioning of any quantity −Even with on site support we have still had performance issues Successful implementation requires careful attention to device applications and post startup review and adjustment. Not particularly tolerant of error. Right now the commissioning labor per installation is high Steep learning curve, but we think we are over most of it. Still concern over some services, especially dry vessels or widely varying process conditions.

17 Conclusions Guided Wave Radars are not simple but they do work (eventually) They aren’t always predictable when first commissioned They take more work than Specific Gravity based devices We will be developing much more defined practices −Specification and configuration requirements −Checkout and commissioning procedures We will continue to use the technology, but will run into resistance if we try to eliminate traditional SG based devices −Operations doesn’t always understand SG devices will be inaccurate −But….. It does give them a signal even if its wrong. It will take time to develop comfort that people have with the old technologies