Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.

Slides:



Advertisements
Similar presentations
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.
Advertisements

LS1 Status Report – 116 th LHCC Frédérick Bordry 4 th December 2013.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Leak Testing QC of Cold Vacuum Systems the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
CRYOGENICS AND POWERING
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
LS1 Injectors K. Foraz on behalf of N. Gilbert, S. Mataguez, D. Hay & D. McFarlane LSC 24 th May /05/2013LSC – EN-MEF-OSS1.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
4 December 2007Sylvain Weisz - LEMIC1 Status of LHC installation.
Injectors & LHC report K. Foraz on behalf of OSS members 01/11/13LSC - EN-MEF-OSS1.
Jean-Philippe Tock (TE-MSC) On behalf of the SMACC project.
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
Injectors & LHC report K. Foraz on behalf of OSS members 01/08/2013LSC - K. Foraz1.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 30/08/2013LSC - S. Baird, M. Bernardini1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
ACS news RF cabling campaign: DONE Final tests cavity tuning motor (ctrl): in progress recabling software upgrade Water cooling: ADT static pressure test:
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
LHC Commissioning Status Gianluigi Arduini CERN – AB Department For… 23/10/20081LHC Commissioning Status - G. Arduini.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
Update on the PSB Cooling and Ventilation Systems
EN-CV activities for LHC during LS2
K. Foraz on behalf of OSS members
TE-MSC activities in SPS during LS2
SMACC Tenth report [15 min] 13/09/2013
EYETS David Hay EN-OSS.
ELENA installation and commissioning status
BA6 – crab cavity activities in EYETS
LHC-RF activities in LHC PT 4 TS2 YETS LS2
K. Foraz on behalf of OSS members
AD consolidation activities in LS2
on behalf of the RF group
Update of cryogenic activities
The LHC - Status Is COLD Is almost fully commissioned
Preparation of the activities for the LHC Long Shutdown 2
TE-ABT Activities for LS2
EN-HE SPS works during EYETS
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS EN-CV Planning LS (initial draft)
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS activities during LS2 TE-EPC (Power Converter Group)
Short LHC-TS week 38 Confirmed by LMC on 16th August
EN-CV interventions during EYETS for PS and PSB
TE-MSC activities in SPS during YETS
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
K. Foraz on behalf of OSS members
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
ACS news Circulator TCU: control tests in progress All cavity racks
Experimental Areas – LS2 planning
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 20/02/2019.
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1

AD Done: – Renewal stoch. cooling power supply – Cryogenic pump maintenance – Pickup tank sUHM3107 & Tank UVM3207 back in place Circulation of demin water now stopped in AD-ring In progress: – Girder line 7000 : chamber specifications under approval – BHN06: visit to Novosibirsk – Electrical reconnexion work - new junctions – Loop tests in parallel on all magnet interlocks Discussions in progress with EN/CV for water availibility 14/06/2013LSC - K. Foraz2 Pickup tanks logistics

LEIR Done – Buffer zone In progress – Organization of future bake-out (sectors 1,2 & 5) Forecast – Access point installation from next week 14/06/2013LSC - K. Foraz3

PSB & PS PSB In progress – Cable continuity and Burndy connector tests for the Multipole power converters progressing well. – On site preparations for the beam dump replacement project – Replacement of the PSB lift AS-45. – Installation of the underground cables – CV maintenance – Kicker consolidation and maintenance Forecast Forecast – Vacuum and Beam instrumentation maintenance & upgrade programs under preparation. – Replacement of the BI.SMH under preparation. 14/06/2013LSC - K. Foraz4 PS In Progress – Renewal of ventilation system progressing well – Tuner of the PSC40-78MHz cavity removed - investigation on progress – Refurbishment of the piping of the chilled water circuit just started – Access System Installation Forecast – Dismantling of cranes PR06 & PR20 from next week – ALARA done – Installation of shielding wall in front of septa 16 & 42

SPS Done – TT10 : CV pipes removal – 8 magnets exchanged In progress – EL cable campaigns….. last minute: cable drums have been stolen in BA, BA4 and BA5…. Impact to be evaluated – 7 magnets will be exchange next week – Preparation for LSS1+ decabling campaign Forecast – TT10 : civil engineering – Drain of the SPS primary water ring from next week -> exchange of isolating valves 14/06/2013LSC - K. Foraz5 SPS magnet exchange TT10 – pipes removed

LHC – sector readiness for consolidation Sector readiness: – Released: 45, 56, 67, 78, 81, 12, 23 – To be released: 34  waiting for QRL leak test – S12 short circuits – investigation completed Diode – solved Lyra – repair to be done Leak test of cryomagnets lines – 20 internal helium leaks identified in arc subsectors after warm-up 14 identified to component.  for 6 leaks not identified to component, further tests to be performed in ɸ2. – Triplet 5L – helium leak in FF (inside DFBX) stable since 2009 – propose ‘use-as-is’. RF ball tests *ball initially stopped, dummy PIMS in place, 2 nd ball test successful **ball stopped, no collapses PIM, 2 nd test successful 14/06/2013LSC - K. Foraz6 Status for LHC arcsS5-6S4-5S6-7S7-8S1-2S8-1S3-4S2-3 RF ball test – PIM collapses000**01* to do0

Status of leak tests 14/06/2013LSC - K. Foraz7 QRL internal leak test status – S56 - Leak tests in progress (in parallel with SMACC) – S34 - Leak localization tests on-going, – S67 - Coordinated with SMACC – scheduled next week – S78 - Line C leak confirmed – deformed compensator (H) confirmed, – S81 - Line C leak confirmed, deformed compensator at C29R8 – QRL opening from end of next week – S45 - Opening and observation on going.

LHC - SMACC W opening just finished in sector 67 Interconnection train in sectors 56 & 67 DFBA consolidation in sectors 56, 67, 81 DN200 in progress in sector 78 (not started in sector 81) Magnets: – s78 - connections in progress – s12: magnets wil be replaced from next week 14/06/2013LSC - K. Foraz8

QRL opening in sector 45 – Vacuum vessel sleeve cut, MLI and shield removed – Tests on line C compensator - leak concerned – Measurement in situ of the position of the lines – Cut and extract compensator for analysis QRL service module – Walkways installed on 1/8 – Service modules upgraded 1/8 LHC “other” consolidation & upgrades 14/06/2013LSC - K. Foraz9 QRL opening sec. 45 Walkway QRL service module

LHC - R2E Point 1 – Power converters removal in progress – Installation of canalys and AC cables in UL – Water cooled cables removal from next wk Point 5 – Drilling will start next week – Displacement of cable trays in UL from next week – Piping installation almost finished – Water cooled cables removed Point 7 – Power converters disconnection and cable removal in progress – TZ76 – demolition wall in progress 14/06/2013LSC - K. Foraz10 WCC UL55 doors removed Wall demolition in TZ76

LHC - LSS & service areas In (good) progress – Cabling campaigns (p1, p2, p4) – Maintenance of Kickers system – Maintenance of RF system – ACS exchanged canceled spare is leaky (degradation during storage) – Maintenance and upgrade of access system – Survey – Vacuum and vacuum Meeting programmed next week 14/06/2013LSC - K. Foraz11 RF logisitcs RF module Cabling at point 2

LHC - Infrastructures Demineralised water production stopped Electrical maintenance and consolidation of 400kV inprogress UPS replacement – SR1 in progress – Point 6 underground CV maintenance at points 18, 2 6 and 8 – In order to lower down temperature in REs ( 48kV systems are suffering from hot temperature), it has been proposed to replace the door by grid door New cooling towers installation at Point 8 (pt 6 completed) Optical point 1 Removal of racks 14/06/2013LSC - K. Foraz12 DYPBlogisitcs

LHC overall progress Good overall progress in LHC IC train ahead of schedule...but some issues being studied Infrastructure progressing well – Temperature in REs to be followed Some potential issues to be followed – LSS – components readiness to be followed – Lyra issue – QRL leaks and repair – Busbar insulation boxes 14/06/2013LSC - K. Foraz13