May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 1.

Slides:



Advertisements
Similar presentations
Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Advertisements

SCHOOL OF CIVIL ENGINEERING Presented by: Jonathon Simons Sanjo Adeyemo Taiwo Oshodi An Investigation into the Geological Faults and Subsequent Construction.
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
Rectangular framed structures
Chapter 19 Floors.
FFD 201 – SITE PLAN SITE PLAN.
Presented and arranged by: Jason Vila and Sergio Castillo.
Medieval Architecture Ms. Catsos Western Civilization.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
My Work Plan Carla Dickof.  I have reviewed the literature review done within our group  I am currently reviewing further case studies as well as research.
ASSIGNMENT Begin on page 197 “The Foundation”.
BDS Design Studies John Amann ILC Mechanical Engineering 10/24/06.
BCT 102 Residential Print Reading. Working Drawing Set & symbols template.
Under The Earth. Introduction Why Underground? Reserve is deep, uneconomical to remove the overburden Underground: All kinds of design you can imagine.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
Inspiration from creative structures / spanning space.
Lamp design inspired by architecture. Some examples…hanging from the ceiling.
Framing the House. Platform Framing Platform framing.
Competency: Draw exterior elevations
The ILC IR John Amann ILC Mechanical Engineering 09/12/06.
Unit 6/P6 – Timber Frame Construction Name ________________
ILD solenoid magnet construction in Kitakami-site 17. December Tokusui Workshop KEK : Y.Makida, T.Okamura, Y. Sugimoto Toshiba : Nakamoto 、 Orikasa.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
Strategy of detector solenoid construction Yasuhiro Sugimoto KEK 1.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
Hall C Users Meeting SHMS Structure Installation A pictorial review Mike Fowler Hall C Engineering 21 Feb 2014 M. Fowler Hall C Users Group, 2014.
TYPE OF STAIRS STRAIGHT-RUN STAIRSQUARTER-TURN STAIR HALF-TURN STAIR SPIRAL STAIRS WINDING STAIR CIRCULAR STAIR Building construction illustraded 4 th.
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Slide 23/ CH-NGO DRR Standard Shelter: Technical Requirements: Typhoon Resistance Resistance250 km/h sustained wind speed.
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
A ventilation curtain was hung from the roof bolt plates and extended across the last open crosscut. The ventilation curtain was rolled up by the victim.
1 May 22, Y.Sugimoto Update of detector hall in mountain region.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
Premises Renting/Leasing to locate the TSU School of Innovation, Economics and Management.
FACTORS EFFECTING COST OF BUILDING ELEMENTS
IRC 2009 OVERALL. SITE PLAN PROPERTY LINES LOCATION OF BUILDING GRADES STREETS.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Experimental Hall in Mountain Regions
SiD Collaboration Meeting SLAC, December 2011
2016/9/30 Yasuhiro Infra/CFS mini-ws
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
Detector Utility/Service Cavern
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Experimental hall design in Japanese site
Introduction Used for covering spaces in the form of roof or floor
Detector Service Cavern for ILC
Summary Some Issues of Future Consideration
Detector hall in mountain regions
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
When the building is at first floor level it is time for the joiners to fix the ceiling joists as the brick layers are ready to start building the second.
Objective 6.02 part 1: Recognize components of construction
Competency: Draw exterior elevations
Framing the House                                                                                                                   
Project Design & Construction
Detector hall in mountain regions
The Framers Gallery FRONT CENTER KITCHEN ENTRANCE BACK WC
C.2.10 Sample Questions.
C.2.8 Sample Questions.
C.2.8 Sample Questions.
Couple Roof ridge wall plate.
Presentation transcript:

May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 1

May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 2

Hall roof span is a simple span –Rock bolts provide the structural support –Drip Ceiling provides a dry and clean space. Walls and floor use rock bolts for structural support, concrete lined. May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 3

Simple rock massing Uninterrupted roof spans and wall supports. May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 4

May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 5

May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 6

May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 7

May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 8

9 Japan - Sample site Exp-hall Access tunnel

10 Japan - Sample site Enough space for detector solenoids

May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 11