Review of SiLC activities LPNHE/ IN2P3 / CNRS / U. Paris VI & VII: J.E.Augustin, G.Badet, A.Charpy, C.Ciobanu, J.David, M.Dhellot, W.da Silva, G.Daubard,

Slides:



Advertisements
Similar presentations
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel.
Advertisements

CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
GEM Detectors for AnDY Nilanga Liyanage University of Virginia 1 Outline GEM chamber concept Large area GEM chamber projects Proposed GEM configuration.
Stephan Haensel - 7th SiLC Meeting - CERN Combined test beam with LCTPC - an update on present status and schedule S. Haensel 1, T. Bergauer 1, M. Dragicevic.
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.
SiTRA brief status report to the EUDET S.C., August 31 st 2009 Members: Helsinki University and VTT(Helsinki), LPHNE-UPMC/CNRS-IN2P3 (Paris), Charles University.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Calibration, simulation and test-beam characterisation of Timepix hybrid-pixel readout assemblies with ultra-thin sensors International Workshop on Future.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
1 Pixel readout for a TPC LCWS 2010 – Tracking TPC R&D session 27 March 2010 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay groups.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
1 SiLC sensors for the LP-TPC Thomas Bergauer Institute for High Energy Physics (HEPHY) Austrian Academy of Sciences, Vienna for the SiLC Collaboration.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Data Acquisition for EUDET Example: JRA1 DAQ Daniel Haas DPNC Genève LCWS Hamburg Outline EUDET JRA1.
Silicon Tracking Systems in Mokka Framework Valeri Saveliev, Obninsk State University.
Integrating Silicon tracking in ILC detector concepts: solutions & challenges Aurore Savoy-Navarro, LPNHE-Universite Pierre et Marie Curie/IN2P3-CNRS The.
WP9.4 baseline deliverable summary 10 December 2014 Thomas Bergauer (HEPHY Vienna)
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Beam Tests of 3D Vertically Interconnected Prototypes Matthew Jones (Purdue University) Grzegorz Deptuch, Scott Holm, Ryan Rivera, Lorenzo Uplegger (FNAL)
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Si Tracking Software ILD Software Meeting, 27 January 2010 Ecole Polytechnique, Palaiseau, France Winfried A. Mitaroff HEPHY Vienna, Austria Si Tracking.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
1 JRA2-SITRA status report Z. Doležal, A. Savoy-Navarro for JRA2-SITRA partners (LPNHE Paris, Ch.U. Prague, Helsinki, Santander) and associates (CNM Barcelona,
1 The Silicon TPC System EUDET Extended SC meeting 31 August 2010 Jan Timmermans NIKHEF/DESY.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
BASIC SKETCH OF ACTIVITIES FOR THE CERN LHCB-RICH TEAM (2012 – 2017) Team composition Present activities and consolidation plans RICH – CERN R&D and Upgrade.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
EUDET FP7 brainstorm EUDET-JRA2 Jan Timmermans. My personal opinion…. I would be in favour of waiting till next call Because “grand” particle physics.
Aurore Savoy-Navarro 1), Albert Comerma 2), E. Deumens 3), Thanh Hung Pham 1), Rachid Sefri 1) 1) LPNHE-Université Pierre et Marie Curie/IN2P3-CNRS, Fr.
F Fermilab Vertex Effort From a Fermilab Detector R&D Perspective Marcel Demarteau For the Fermilab ILC Detector & Physics R&D Group ALCPG Vertex Detector.
Silicon Tracking for CLIC experiments Aurore Savoy-Navarro, LPNHE Université Pierre et Marie Curie/CNRS-IN2P3 CLIC08 WORKSHOP, October 2008, CERN.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
G. Ruggiero / TOTEM 1 Si Edgeless Detectors in the RPs Edgeless detector (on the old “AP25 module”) active edges (“planar/3D”) planar tech. with CTS (Current.
A novel two-dimensional microstrip sensor for charge division readout D. Bassignana, M. Lozano, G. Pellegrini CNM-IMB (CSIC) M. Fernández, R. Jaramillo,
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Latest from the SiLC R&D Aurore Savoy-Navarro, LPNHE-Paris/IN2P3-CNRS On behalf of the SiLC collaboration: U. of Michigan, UCSC-Santa Cruz, IMB-CNM/CSIC,
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
4-5 January 2006Jan Timmermans - Introduction1 EUDET JRA2 Brainstorming meeting 4-5 January 2006 Jan Timmermans NIKHEF.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
SVT – SuperB Workshop – Annecy March 2010
Final CALICE OsC meeting: Status and summary of project
Detector building Notes of our discussion
P. Morettini Towards Pixel TDR PM - ITk Italia - Introduction 8/2/2017.
Atlas: Upgrade Phase I Massimo Della Pietra.
SiTRA multipurpose and standalone test infrastructure
TileCal upgrade EVO meeting Demonstrator tesks
TK Upgrade report.
HL-LHC upgrade at IPHC news
SVT – SuperB Workshop – Frascati Sept. 2010
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

Review of SiLC activities LPNHE/ IN2P3 / CNRS / U. Paris VI & VII: J.E.Augustin, G.Badet, A.Charpy, C.Ciobanu, J.David, M.Dhellot, W.da Silva, G.Daubard, C.Evrard, J.F.Genat*, P.Ghislain, T.H. Hung, J.F.Huppert, D.Imbault, F.Kapusta, P.Repain, A.Savoy-Navarro, R.Sefri SOCLE December 08, LAPP Annecy-le-Vieux * On leave at U. Chicago

Outline R&D on Sensors R&D on Mechanics R&D on Electronics Test beam activities Simulation: tool developments and studies Detector Integration Letters of Intent preparation Perspectives Outlined in this presentation the contributions of LPNHE in these various topics

SiLC is using the experience of HEPHY Vienna and IEKP Karlsruhe gained in CMS - use of structures to study the detailed characteristics of new sensors (see next slides). The LPNHE team is developing this expertise as well and will pursue developing it in the next years acquiring/building also the needed set up and tools. Concerning pixels: LPNHE intends to work on the 3D pixels as part of the global world- Wide 3D effort for pixels and for 3D vertical interconnect (Note the ILC-LPNHE is part of the 3D project IN2P3-FNAL and in ANR Vitesse)

The LPNHE intends to further develop the Lab test facilities to perform detailed electrical characterization of new sensors. This is underway.

5 Spatial resolution vs. strip geometry 0 intermediate strip 1 intermediate strip 2 intermediate strips 50 m r/o pitch strip Interesting result: 9μm resolution if no intermediate strip 5 or 6μm resolution if 1 or 2 intermediate strip Important results on HPK test structures from sensors we bought together with HEPHY and IFCA. LPNHE will also participate to the new dedicated test beams at CERN in 2009

6 NEXT: –New HPK sensors performance characterization with the new SiTR_ chips, first at the Lab test bench, and with the VA1’ reference chips. –Alignment system (M.Fernandez-Garcia, I.Vila and other IFCA team members)‏ studies at a new Lab test bench using Laser IR system and the test set-up developed for the test beam at CERN (see Jacques’ presentation). This Lab test set-up will be mounted at LPNHE next year. HPK sensors treated for alignment

Mechanics R&D The LPNHE is involved in 3 main mechanics R&D aspects: New Silicon modules: basic element to build large area Si tracking architectures Developing the mechanical setup needed for test beam and lab test bench Integration studies: study of mechanical support structures and alignment issues Mandatory: the development of the Lab infrastructure => great progress made this last year by our team despite real difficulties in terms of people and funding

Mechanics infrastructure for Silicon detectors at LPNHE Mechanical room SiLC testing room (upstairs)

9 2) Si Module: mechanical design&construction 2 HPK 6’ sensors FE chip 130nm hybrid, is being soon replaced by direct connection of the FE chip onto the strips (collab with HPK) LPNHE has further developed this last year the expertise and the tools to build the new modules (still using an hybrid board for the FEE)

10 Mechanical development Module conception (LPNHE team)‏ Modules with two sensors Different FEE (chip development)‏ Bonding constraints (I.McGill) Faraday cage integration Alignment study Easy and secure handle Study for global structure Schematic view PAFEEVA

11 Mechanical development Tools conception for “automated” manufacturing Precise alignment of the different parts of the module::  silicon strips  pitch adapter connectivity  FEE Perfect integration on the carbon fiber support during the gluing Analogical video camera Suction system with micro metric screw System tolerance

12 Mechanical development Tools conception for “automated” manufacturing Keep alignment during the gluing process Perfect integration on the carbon fiber support during the gluing Gluing tool Suction transfer tool

13 Mechanical development Definition of the procedure and the critical point during the assembly Installation of the cleanroom and the first module is done Work environment

14 Mechanical development Definition of the procedure and the critical point during the assembly Modules ready for the CERN November 2008 testbeam Work environment

15 Mechanical development Definition of the procedure and the critical point during the assembly Modules ready for the CERN November 2008 testbeam Work environment

16 Mechanical development Definition of the procedure and the critical point during the assembly Modules ready for the CERN November 2008 testbeam Work environment

17 NEXT: 1) Developing an environment for modules manufacturing (G.Badet, A.Charpy, G.Daubard, J. David, C.Evrard, P.Ghislain, D.Imbault, P.Repain)‏ ; also pursuing fruitful collaboration with CERN bonding Laboratory (A. Honma and I. McGill) –parameters of HPK sensors: dimension, pitch, transparency –Development of toolbox –Clean room installation –Developing expertise for working with these types of (special and delicate) detector and the needed environment for all the members of the ILC-LPNHE team. 2) New direct connectivity of FEE with strip detectors in collaboration with industry (presently HPK, LPNHE and a few other SiLC institutes) (see electronics section) 3) Developing further expertise in collaboration with other Labs in SiLC (Liverpool, IFIC…), and 4) Pursuing R&D towards the new elementary Si module responding to all the requirements of next generation Si trackers (synergy with LHC upgrades)

18 2) Mechanical development for test beam and lab test bench Ex: Faraday cage new configuration Developed with V. Saveliev and DESY; Next version will be made of composite material (developed in the framework of PiCS with Russia), see next slide Two reference modules equipped with HPK sensors read out by the VA1' chip (serving also as beam telescopes if needed) Present configuration: 3 Test modules (are exchangeable) equipped with new sensors and/or with new readout system Collimator for alignment study Possibility to do a “standalone” tracking + EUDET tracking

19 system prototype of the module box (OSU): This structure has the half cylindrical shape as needed in real-life for cylindrical layers of Si detectors (ex: innermost part of the Si components in ILD design) No cooling foreseen, because low power dissipation of the FEE.

3) Integration mechanical studies: The LPNHE team is starting to be involved in the design and studies of the integration studies for the Silicon tracking systems in the various ILC detectors (see later). The LPNHE mechanical team has a large expertise and is interested in contributing but lack of manpower to fully contribute. The LPNHE team also participates to the studies and discussion on the alignment methods and issues (crucial for the Physics)

R&D on Electronics The ILC-LPNHE is involved in the following developments: FEE and readout chip in CMOS deep sub-micron electronics: new version achieved in 2008 = SiTR_ (see Hung’s presentation) with U.B. and IMEC Direct connectivity of the FE chips onto the strip module Developing the next electronics stage (DAQ framework) see A.S.N. presentation at LCWS08 (DAQ session). Developing the complete DAQ system for the test beam set-up (see Jacques’s presentation)

NEW IMPORTANT ACHIEVEMENT: FEE complete architecture delivered in 2008 with SiTR_130-88

Direct connectivity FEE & strips A first step is underway in collaboration between LPNHE and HPK, based on bump bonding and using the SiTR_ chip and the presently delivered HPK sensors. Other firms and Institutes have expressed interests in collaborating with us on this issue (under study: important not to be only dependent of HPK) Next step is 3D vertical interconnect: ILC-LPNHE is taking part to the global effort (ASN participation to the last Ringberg workshop in 2008). ILC-LPNHE is part of the IN2P3-FNAL collaborative effort and of the ANR Vitesse. Also involved in the setting up of the global worldwide effort on this topic.

Go to basic blocks of 256 channels and build modules of 512 channels or 1024 out of them (multiplexing factor is still under investigation) Thinning of the chip Next version in full wafer process (gain in space) Include latest results from the tests on the present chip Try the 90 nm CMOS technology For the longer term it is intended to prepare a fast version CLIC-like Pursue the direct connection chip onto the strip detector (bump bonding now, and starting to investigate 3D vertical interconnect as part of the global effort) NOW WE ARE WORKING ON TESTING THIS CHIP!!

DAQ for Test beams This last year the LPNHE has developed a full standalone framework able to be included in any combined test beam or to work in standalone. This includes the development of the needed DAQ hardware (presently based on FPGA-USB developed by U.B.) and the associated DAQ software based on VHDL, C++ and ROOT (see next slides and Jacques’s presentation). Important achievement and completion of a main deliverable for the EUDET project. This overall system will be used for the forthcoming test beams in 2009 (see next) and has been first experienced in a short test beam period Nov 4 to 7 th at the PS CERN (parasitic mode). Will also be used for the dedicated Lab test bench on alignment studies in 2009.

Test beams activities Test beam of HPK sensor structures (June 2008) done by HEPHY Vienna and CU Prague (LPNHE will contribute next year) Test beam preparation for the LCTPC in DESY (since early 2008) (HEPHY, IEKP, LPNHE) Test beam with a standalone Si tracking system at CERN (Nov 2008) (several SiLC institutes)

Tests of structures performed with HPK test structures at the SPS-CERN Next year another test run where LPNHE will take part. Instrumental for a detailed characterization of Silicon sensors and optimization of the best sensor strip design 8 structures equipped with APV25 FE readout Installed in between the 2 parts of the EUDET Telescope. HPK test structures read out with APV25 FE system. In 2009 will be equipped with new SiTR_ FE readout system.

Test beam at CERN in November 2008: towards a fully standalone Silicon tracking test set-up

Barcelona U. + LPNHE The FPGA board VHDL – M. Dhellot (LPNHE) C++ code: A. Charpy (LPNHE) Data ana: C. Ciobanu (LPNHE), P. Knasnicka (Prague) A. Comerma (Barcelona) debuging and post-CERN VHDL/C++ Last day at CERN succeeded in acquiring up to ten successive triggers (small step for the mankind).

Barcelona U. + LPNHE The FPGA board C++ code: A. Charpy (LPNHE) Data ana: C. Ciobanu (LPNHE), P. Knasnicka (Prague) A. Comerma (Barcelona) debuging and post-CERN VHDL/C++ Last day at CERN succeeded in acquiring up to ten successive triggers (small step for the mankind).

NEXT: test beams in 2009 Standalone test beam with new SiTR chips at DESY (April 2009) Including the new SiTR_ chip readout in the LCTPC test (summer 2009) Test beam at SPS CERN of Si sensor structures with EUDET telescope and of the standalone system in November 2009 Test beam at FNAL in 2009 under discussion with FNAL upon request of FNAL and other American SiD teams (M. Demarteau+ASN)

LP-TPC: Silicon Envelope (HEPHY, IEKP Karlsruhe, LPNHE) four silicon modules will be installed (feb 2009) -two in front and two behind the TPC, with respect to the e - -beam  two independent support structures are needed -on each side:  one horizontal module consisting of two daisy-chained sensors  and one vertical module consisting of one sensor movable support system is needed because it must be possible to scan the TPC -the TPC and the magnet will move relative to the beam - the sensors have to stay inside the beam line The LPNHE will contribute in including the new FE chip read out between spring and summer next year, in replacement of present APV25 read out. SiLC Support Electron Beam TPC Support TPC Si Detectors Magnet

Simulation studies LicToy: imported at LPNHE from HEPHY Vienna (useful for preliminary optimization studies) MOKKA: main GEANT-based full simulation for ILD; in collaboration with V. Saveliev via PICS project. - ALL 4 Si components for ILD have been included in 2008 and are part of the reference design optimization study for ILD- LOI (ASN & V. Saveliev). Maintenance of geometry DB (V. Saveliev+ A. Charpy) Evolving with detector optimization and integration. ILCROOT: expertise from ALICE ROOT (A. Charpy). Used to develop two tracking strategies: TPC + Si components and all Silicon Tracking. Collaboration with FNAL (base of ILCROOT) and Italian developers (see Alexandre’s presentation). Aim: to compare both tracking concepts, underway.

LICTOY for fast detector studies MOKKA ILCROOT Some examples of the available simulation tools:

Integration studies and issues The SiLC collaboration is a generic R&D collaboration that applies to all 3 detectors presently considered for ILC and submitting LOI’s. Indeed the 3 ILC detectors: ILD, Sid and 4 th concept are soliciting SiLC assistance for the Silicon tracking. The LPNHE is instrumental in developing and optimizing the Silicon tracking system for these 3 detectors. - Major involvement in ILD - Natural involvement in SiD with main collaborative contacts with FNAL SiD team (B. Cooper & collaborators for the overall mechanical design) - Starting collaborative studies for Silicon integration in the 4th concept design (solicited by this detector from the beginning of 2008). LPNHE has a leading role on these studies.

Si Tracking for all 3 ILC detector LOI’s SID 4 th CONCEPT ILD

Integration cont’d LPNHE has set-up a collaborative effort with Torino U. and OSU for detector integration studies in conjunction with simulation studies and tools development Main focus: ILD Silicon component integration (see example for SET component in next slide) -Contribution to the inner Silicon tracking is foreseen in collaboration with all the other components in this region and MDI. A preliminary integration set-up of the SIT+FTD will be provided for the ILD-LoI by LPNHE based on previous preliminary studies (last LCWS08 ILD meeting) -LPNHE main interest is on building the ETD (end cap) component

Ex: SET mechanical structure 2,85 X0 [%] Each panel is constrained at 4 sides; -> 3 support rings on TPC Collaboration between Torino, Obninsk and LPNHE, design by P. Mereu (T.U.)

Ex: SET mechanical structure constrained on long sides; 8,9 kg dead load; 3 kg payload. MAX deflection: 62 micron constrained on short sides; 8,9 kg dead load; 3 kg payload. MAX deflection: 1,6 mm STATIC DEFLECTION OF ONE PANEL

Further integration studies Pursuing discussion on detector integration for SiD: -Several preliminary discussions between Aurore and the SiD tracking mechanical FNAL experts (B. Cooper et al). -Study of alternative design to: => the central barrel (more layers & two-sided layers) => the end caps (XUV instead of projective layers). Comparison between these two all silicon tracking designs is undertaken with simulation studies ILCROOT based. Expected results for March 2009.

Contribution to LOI’s All these R&D activities are bringing key information to write the LoI’s due in March Simulation studies and developing the mechanical concepts to build these tracking components on mechanical key questions. LPNHE (ASN) in charge of writing the Si tracking part for the ILD-LoI LPNHE contributes also to both SiD and 4 th concept in different ways.

Perspectives and concluding remarks Over the last year the SiLC collaboration has made significant progress: –Sensor development –Mechanical development –Electronics development –Simulation –Integration –Test beams More work and resources needed to keep or improve this rate of progress Short term: contributions to LoI’s Longer term: expanding our efforts to stay in tune with the evolution of the technology and concurrent developments in the field –eg CLIC studies