CHAMBER PRODUCTION AT CERN 904 RPC UPGRADE-MEETING, 08.JAN.2014 DONG-HYUN KIM ON BEHALF OF THE CERN-904 TEAM DEPARTMENT OF PHYSICS, SUNGKYUNKWAN UNIVERSITY, KOREA 1
Content 1. Status of 904 site 2. Data Analysis 3. Plan 2
1. Status of 904 site Visual test – 17 BO Gaps Made 3 HV-Connector Still waiting a Gas back New india-student coming 3
2. Data Analysis 4
ABCMerge 2. Data Analysis 5 For IDIso - μ+
ABCMerge 2. Data Analysis 6 For IDIso - μ+
ABCMerge 2. Data Analysis 7
ABCMerge 2. Data Analysis 8 For STA - μ+
ABCMerge 2. Data Analysis 9 For STA - μ+
ABCMerge 2. Data Analysis 10
ABCMerge 2. Data Analysis 11 For Tracking - μ+
ABCMerge 2. Data Analysis 12 For Tracking - μ+
ABCMerge 2. Data Analysis 13
3. Plan Calculate Trigger Muon Efficiency Leak test for the BO Gaps Dark-current test for the BO Gaps Make the HV-Connetor 14