CHAMBER PRODUCTION AT CERN 904 RPC UPGRADE-MEETING, 08.JAN.2014 DONG-HYUN KIM ON BEHALF OF THE CERN-904 TEAM DEPARTMENT OF PHYSICS, SUNGKYUNKWAN UNIVERSITY,

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

DOE O 430.2B Metering Requirements and Status
Test beam 2001 Results M.C. Fouz Muon Week, CERN Nov 01.
New Chambers for M23R12 for the Muon Upgrade Alessandro Cardini INFN Cagliari.
27/02/2002M.D.P. - ATLAS Muon Week1 First results of Atlas RPC cosmic rays test Massimo Della Pietra Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M.
Presented by Shereen Aly Helwan University Group (experimental and data analysis) Dr. Ayman Mahrous Dr.Ahmed Ali Resistive Plate Chamber Activity At Helwan.
Status of the ATLAS MM project
1 Dayabay RPC Detector Zhang Jiawen Outline  Motivation  RPC introduce  RPC for Daya Bay  Efficiency and noise  Module structure  Module.
G. Carboni - Open LHCC - July 2001 Technical Design Report for the LHCb Muon System Giovanni Carboni on behalf of the Muon Group Part II: RPC Detectors,
RPC project status Pigi Paolucci. RPC project news P. Paolucci is the new project manager for 2011/2012 We are working on the 2011/2012 organization of.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
5-Jan-2010 XEB Meeting at CERN 1 Debriefing from first data: CSC muons n Lessons learned u LHC is a quiet machine  CSC HV can remain on at all times,
ATLAS RPC: Cosmic Ray Teststand at INFN Lecce G. Chiodini, M. Bianco, E. Brambilla, G. Cataldi, R. Coluccia, P. Creti, G. Fiore, R. Gerardi, E. Gorini,
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
The UK’s European university WEB DEVELOPMENT TEAM / USER-CENTRED OVERVIEW.
Panda PCB for prototype status report by D Malkevich on behalf of the ITEP group ITEP.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
LHCb MUON MPWC STATUS OF TOOLING, SITES, PRODUCTION AND MATERIAL PROCUREMENT.
CERN - IT Department CH-1211 Genève 23 Switzerland t Monitoring the ATLAS Distributed Data Management System Ricardo Rocha (CERN) on behalf.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
A new generation of RPCs to be tested for the super- LHC CERN GIF workshop 20/06/2011 G. Aielli.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Compressor status AWAKE Technical Board meeting 19 August 2015.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
Status summary of RPC R&D for INO ICAL detector B.Satyanarayana, TIFR, Mumbai Satyajit Jena, IIT Bombay, Powai For INO Collaboration.
Andrea Di Simone Andrea Di Simone – INFN Roma2 Andrea Di Simone CERN PH/ATC and INFN-CNAF On behalf of ATLAS RPC groups: Lecce, Napoli, Protvino, Roma2.
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
Precision Drift Chambers for the ATLAS Muon Spectrometer
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
UC-12 L1 Flight Track over Ground Sites.
G. Passaleva Status of MWPC production site in Florence G. Passaleva.
19/6/2002S. Patricelli Muon week1 Status of RPC production (1) zThe leading production for RPCs is the the gas volume production at GT. All other items.
Korea-CMS representative: Young-Il SKKU 6 CMS member institutes + 2 non-member institutes are active: 15 professors, 19 researchers, 20 graduate.
Gas system for NA62 Straw detector Roberto Guida On behalf of Gas Service Team NA62 Straw working meeting, March 26, 2012 Outline: P&I Drawing Schedule.
For 2016 RPCWorkshop 1 Charge Distribution dependency on gap thickness of CMS endcap RPC Sung Park, KODEL, Korea Univ On behalf of the CMS RPC group 1.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
2005/07/12 (Tue)8th ACFA Full simulator study of muon detector and calorimeter 8th ACFA Workshop at Daegu, Korea 2005/07/12 (Tue) Hiroaki.
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
Plots of RPC performance G. Cattani, University of Rome “Tor Vergata” & INFN Roma 2 on behalf of ATLAS Muon Collaboration.
27 December 2006 LHCb Status Report (A.Vorobyov) 1 LHCb.
Final results from an extensive aging test on bakelite Resistive Plate Chambers Stefano de Capua University of Rome II “Tor Vergata” and INFN.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
Cluster Status & Plans Cluster Status & Plans —— Gang Qin Jan
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
Gas Detectors (GEM) The 6th Egyptian school for high energy physics
Production ad Quality control of RPCs for the CMS muon barrel system
Meeting at Erice Great success!
The Quest for a Pocket-sized Bubble Chamber
Web Content Management System (CMS)
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
UCLA Meeting: Notes TMB upgrade for ME1/1 issues
 Real Madrid.  Contents:  About the team.  Facts.
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Information Technology
Unit 3 Review (Calculator)
MUC simulation and reconstruction
Calculate 9 x 81 = x 3 3 x 3 x 3 x 3 3 x 3 x 3 x 3 x 3 x 3 x =
BesMUC Reconstruction Algorithm
Project Process Gather information Set up team Plan project
RPC approved plots.
Repair campaign 2017 Repair campaign 2016 Repair campaign 2015 TS2 TS1
Presentation transcript:

CHAMBER PRODUCTION AT CERN 904 RPC UPGRADE-MEETING, 08.JAN.2014 DONG-HYUN KIM ON BEHALF OF THE CERN-904 TEAM DEPARTMENT OF PHYSICS, SUNGKYUNKWAN UNIVERSITY, KOREA 1

Content 1. Status of 904 site 2. Data Analysis 3. Plan 2

1. Status of 904 site  Visual test – 17 BO Gaps  Made 3 HV-Connector  Still waiting a Gas back  New india-student coming 3

2. Data Analysis 4

ABCMerge 2. Data Analysis 5  For IDIso - μ+

ABCMerge 2. Data Analysis 6  For IDIso - μ+

ABCMerge 2. Data Analysis 7

ABCMerge 2. Data Analysis 8  For STA - μ+

ABCMerge 2. Data Analysis 9  For STA - μ+

ABCMerge 2. Data Analysis 10

ABCMerge 2. Data Analysis 11  For Tracking - μ+

ABCMerge 2. Data Analysis 12  For Tracking - μ+

ABCMerge 2. Data Analysis 13

3. Plan  Calculate Trigger Muon Efficiency  Leak test for the BO Gaps  Dark-current test for the BO Gaps  Make the HV-Connetor 14