QBC Europe and its facilities. Building purchased – 1 st August 2006 Open for business – 6 th October 2006.

Slides:



Advertisements
Similar presentations
Refrigerated Warehouse Energy Efficiency Experts.
Advertisements

Short-Term Alternatives for City Offices. Background and History Citys current lease for City Marketplace offices ends October 31, 2014 For 22,221 square.
 over 20 years of experience on the specialized market of relocation of the industrial facilities;  realization of the projects in many countries.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
810 Mission Avenue 3 rd Floor Refurbishment October 17, 2013 Related to Agenda Item 14.
SoLa Bristol LCNF Annual Conference - Cardiff Friday 26 th October 2012 Philip Bale Western Power Distribution Innovation and Low Carbon Networks Engineer.
Organics Waste Processing Facility Construction Progress Update January 17, 2011.
Operations & Development Strategy Business Plan Preparation Operations & Development Plans Leeds College of Business University of Colorado Boulder, Colorado.
Carbon Management Steering Board 7 th October 2011 ETHOS (waste to heat) & ComPod – Update CARBON MANAGEMENT BOARD – October 2011.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Presented to: 32 nd Annual Airport Conference – Hershey, PA By: Jeff Gagnon, P.E. Manager AJP-6312 Date: March 4, 2009 Federal Aviation Administration.
Successful business practices International conference on services in support of Small- and Medium-sized Enterprises (SMEs) Sectors: "Crop production"
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
Profex Construct Company presentation. SC Profex Construct SRL IDENTIFICATION DATA Company Name SC Profex Construct SRL Company headquarters Tg-Mures.
LIFETIME ENGINEERING of Buildings and Civil Infrastructures Thematic Network LIFETIME in figures: Working period: 1/6/ /5/2005 Participation: 96.
1 The Supply Chain Supplier Inventory Distributor Inventory Manufacturer Customer Market research data scheduling information Engineering and design data.
7 th Grade – Unit 2. Nearly all careers fit into one or more of 16 categories or types of careers. What term describes these 16 categories in Georgia?
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Housing Options for Engineering Students. State of the art facilities State of the art facilities LEED (Leadership in Energy and Environmental Design)
Building for Learning Project Photo Progress Report 3 October 2009 – November 2009 Project commencement 21 st September 2009.
ESTA Technical Standards Committee Product Stewardship.
Schematic Design Proposal Bahen Centre for Information Technology University of Toronto Toronto, Ontario, Canada Rebecca Ho Lighting/Electrical Option.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Hospital Facility Managers Association of Delaware Valley.
Phoenix Convention Center Phoenix, Arizona Introducing the Building Energy Asset Score Building Performance Session 2: Elements of Building and Data Management.
COMPUTER ENGINEER Created by: Noah 2/6/14. DEFINITION Computer engineers research, design, develop, test, and oversee the manufacture and installation.
ITU Telecom World Exhibitors’ Meeting 21 st March 2006.
1 OPENING CONFERENCE Project “Development of Renewable Energy Service Centres in Hajdú-Bihar and Counties”, Acronym: Business Energy Project code: HURO/1101/122/2.1.1.
The Evolution of the TERRA Crystal Galleries Mineral Showroom.
Preparation for Design Planning 1. Study trends 2. Update on design and equipment possibilities »personal visits »read catalogs & trade journals »ask others.
1. 1 3/14/11 Church Conference 14-Mar-11 Welcome and Introduction Opening Prayer Presentation of Building Project Motion to Approve Project Vote on Proceeding.
Project proposal on "Implementation of modern and innovative technologies for road maintenance"
MAKILALA VOCATIONAL TECHNICAL SKILLS training center.
INTERNATIONAL CARRIER COMMERCIAL WAREHOUSE FULL RANGE OF TRANSPORT AND LOGISTIC SERVICES CUSTOMS BROKER –32–42 COORDINATOR.
North Carolina ABC Distribution Center Graham B. Thompson Project Manager LB&B Associates Inc.
Energy Huntsville Opportunity Report and Government Collaboration August 2015.
Potential Dental Clinic Provide a on-site dental clinic – Utilize the same vendor that provided the mobile dental clinic (Onsite Health) – Mobile clinic.
 over 20 years of experience on the specialized market of relocation of the industrial facilities;  realization of the projects in many countries.
BCNFarma, a Petrone Group Company, is mainly oriented in the pharmaceutical field. It offers a range of services highly qualified in terms of efficiency,
Value Stream Mapping: August 2005 Current State Nancy Terranova October 26, 2006.
MARKETING & SALES CONS 7820 Professional Business Management COW 5.
Phil Munsey, Facilities Energy Engineer Plant 17 Lighting Energy Reduction Project.
Computing Facilities CERN IT Department CH-1211 Geneva 23 Switzerland t CF CERN Computer Centre Consolidation Project Vincent Doré IT Technical.
P A T R I M O N I A L D O C U M E N T A T I O N Federal Public Service FINANCE Workshop on automated valuation models of real state for cadastral purposes.
Module 9Slide 1 of 25 WHO - EDM Premises Part One Basic Principles of GMP Part One, 11.
October 19, 2011 Construction Progress Report. Construction Progress Report – October 19, 2011 Contract sum to date:$ 162,736,722* Total completed to.
Layout and conventional facility N.Terunuma KEK. Conventional facility 1 Layout of beam line should be fixed until end of June We have to start.
S&C Electric Company Princess House, Princess Way, Swansea. SA1 3LW
Elucigene Diagnostics BioSynergy Elucigene Diagnostics Develops and manufactures validated (in Europe, CE marked) DNA based testing kits for a number.
1 1. General Information 1) Space (1) Land Space : 80Kft2 (2) Building Area : 75Kft2 ← 2 story-building(Partially 3 floors) 2) Construction Lead Time :
Models and COBie Templates Mariangélica Carrasquillo-Mangual Research Civil Engineer Construction Engineering Research Laboratory.
Hailo US Tower Equipment Manufacturer
S&C Electric Europe Ltd.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Forsyth County 2016 Bond Referendum
Costing and Project Evaluation
Designing and Installing a Network
DENSO Corporation Organization
SJVRWRF Dewatering Building Corrosion Remediation
Sapphire FULL BUILD & REFURBISHMENTS
technical-service/ technical-service/
Preparation for Design Planning
Sapphire FULL BUILD & REFURBISHMENTS
Compressed Natural Gas Supply Vehicles
Alorro Designs.
ADVERS Third largest heater manufacturer in the world
Around the room Orders of operations.
Installation of New Officers
Faculty of Technical Sciences – University of Pristina
GENTS REST ROOM LADIES REST ROOM BASEMENT-2 BASEMENT-1 GROUND FLOOR 1st floor 2nd floor 3rd floor 4th floor 5th floor.
Presentation transcript:

QBC Europe and its facilities

Building purchased – 1 st August 2006 Open for business – 6 th October 2006

Service area under construction.

Service area to include service office.

Warehouse area floor and walls repainting.

Main office area.

Main office area progressing. Lighting and office equipment being installed.

Warehouse nearing completion.

QBC storage and distribution area. Laboratory not built and fridge not installed.

Progress with the office.

Meetings room.

6 th October 2006 – open for business.

Sarah – General Manager QBC Europe.

Shipment from QBC Diagnostics.

Orders preparing for dispatch.

Jennifer - Customer Services Representative.

Shelley – Marketing Assistant.

Meetings room completed.

Dave – Technical Support Manager.

Laboratory.

More of the laboratory.

‘H’ – Service Engineer.

Service Office.

Robin – Service Engineer.