Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,

Slides:



Advertisements
Similar presentations
09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
Advertisements

1 24 April 2009 SMWG SMWG Closing Report Colorado Springs, Colorado, USA 24 April 2009.
November SLS RFM and RNG REPORT 18 November 2004.
7-Apr-2014-cesg-1 Joint CMC-CESG Meeting NH Conference Centre, Nordwijkerhout, Netherlands Hosted by ESA/ESTEC 7 April 2014 CCSDS Engineering Steering.
30-March-2015-cesg-1 Martin Suess (AD) Rick Barton (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
CSA WG Meeting 24 April 2009 Page 1 Colorado Springs CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
Security WG: Report of the Winter 2007 Meeting Colorado Springs, CO USA January 20, 2007 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
Security WG: Report of the Fall 2014 Meeting BSI, London UK 14 November 2014 Howard Weiss NASA/JPL/PARSONS
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.
1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
16 th – 19 th April 2012 Spring 2012 Meeting Agenda Darmstadt, Germany SOIS Application Support Services WG.
Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code.
Panel P1J: Navigation Data May 2001 CCSDS P1J Status Report P1 Plenary Meeting May 23, 2001 TSG Meeting May 24-25, 2001 Pasadena, California, USA Felipe.
Information Architecture WG: Report of the Winter 2007 Meeting January 20, 2007 Dan Crichton, Chair NASA/JPL.
1 April 2009 CSTS WG: CSTS WG: report to the CSS Area Colorado Springs 25 April 2009 Yves Doat.
Status of Delta-DOR interoperability Berlin October 14 th, 2008 Mattia Mercolino ESA/ESOC,
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
ESA DDOR cross support Slide 1 CCSDS Fall Meeting 2007 ESA  DOR cross support Mattia Mercolino, ESA/ESOC.
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
2009 Spring CCSDS meeting ( Colorado Springs,USA ) SMWG 1 Validation Test Coordination for the SCCS Service Management (R-3.4) 20. April 2009 JAXA YAGI.
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
SLS AREA REPORT May SLS AREA REPORT CESG MEETING Montreal, 17 May 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
November SECURITY WORKING GROUP REPORT November 2004.
1 09 October SOIS Report to CESG/CMC 9 October 2007 Patrick Plancke, C. Taylor.
Panel P1J: Navigation Data October 2002 CCSDS P1J Status Report Fall Meeting, Houston, Texas Dates: Oct 1-4, 2002 Felipe Flores-Amaya NASA/GSFC/Code 453/Code.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
June MOIMS AREA PLENARY NAVIGATION WG REPORT June 2006 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Fall 2008 Meeting Takahiro Yamada (JAXA/ISAS) 17 October.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
Information Architecture WG: Report of the Fall 2004 Meeting November 16th, 2004 Dan Crichton, NASA/JPL.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
Security WG: Report of the Spring 2004 Meeting May 13, 2004 Howard Weiss, NASA/JPL/SPARTA.
Security WG: Status Briefing
Colorado Springs, CO, USA, 24 April 2009 Deputy – David Giaretta
[Area Name] Area Report [Name] (Area Chair) [Name] (Area Deputy Chair)
Space Communication Cross Support Architecture WG
Security WG: Report of the Fall 2013 Meeting
CWE File Structure.
Delta-DOR WG: Report of the Fall 2010 Meeting
SPACE LINK AREA MID-TERM REPORT
Presentation transcript:

Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,

SEA Area WG REPORT SUMMARY TECHNICAL STATUS Delta-DOR WG Goal: Standardising cross-support for Delta-DOR measurements Working Status: Active Summary progress / Major accomplishments: Magenta Book: second Agency review started. The WG discussed further cosmetic changes and the possibility to modify/add pictures, to improve readability. Draft Blue Book: draft was finalised and the WG resolved to CESG and CMC approval, for Agency review Draft Green Book: draft reviewed and actions distributed for next version Yellow Book: contents discussed Progress since last meeting: Second Agency Review for MB, BB ready for Agency review Problems and Issues: Time, meeting room allocations Status:OKCAUTIONPROBLEM X

Executive Summary  Attendees:  Roberto Maddè, ESA/ESOC, chair  James Border, NASA/JPL, member  Hiroshi Takeuchi, Jaxa/ISAS, member  Mattia Mercolino, ESA/ESOC, member  Major topics:  Magenta Book (in Red 2 status): discussion on improvements, in view of 2 nd Agency review  Draft Blue Book, “Delta-DOR Raw Data Exchange Format”, resolution to go for Agency review  Plan for coming Green Book “Delta-DOR technical characteristics and performance”  Significant decisions:  Draft Blue Book, “Delta-DOR Raw Data Exchange Format”, resolution to go for Agency review  Commitment on prototyping of NASA, JAXA, ESA  Yellow book to be prepared, containing the results of the prototyping  Short and long term plan agreed  Cross-area meetings  With SM WG, inputs provided for the inclusion of DDOR service in SM  Next cross-area meeting foreseen during 2010 Fall Meeting  New work:  Prototyping for the Blue Book  Yellow Book which will contain the results of prototyping  Continuation on the Green Book  Future work/documents  Blue Book titled “Delta-DOR Raw Data Exchange Format”  Green Book titled “Delta-DOR technical characteristics and performance”  Yellow Book in support to the Blue Book above

Summary of Goals and Deliverables (1) 1. What do you expect to deliver and when Short term schedule:  Magenta Book:  When RIDS are in (after June 28 th), process them  Include some pictures anyway, to improve readability  Blue Book:  Run first Agency review  Green Book:  Complete missing chapters, review existing ones  Interaction with SMWG:  Continuing discussion with SMWG, for inclusion of DDOR service in the Cross-support Services

Summary of Goals and Deliverables (2) Long term schedule: DateMilestone Fall 2010 Disposition of Second Round of Agency RIDs on the “Delta-DOR recommended practice for cross support” Magenta Book Issue of “Delta-DOR recommended practice for cross support” Magenta Book Internal review of the RIDS received for the Blue Book December 2010 Disposition of First Round of Agency RIDs on the “Delta-DOR Raw Data Exchange Format” Blue Book April 2011Issue a final version of the Green Book December 2011 Prototyping of the raw data format (Blue Book) complete. Compile Yellow Book Date TBD Continuing the process for the issue of the Blue Book, once the Yellow Book is ready, through 2 nd Agency review Revise Magenta Book based on inputs coming from SMWG, whenever such WG is advancing on the definition of SM for tracking services.

Progress Achieved  What do you expect to accomplish: To publish the Magenta Book after the Second Round of Agencies’ review by Fall 2010 To have passed the First Round of Agency Review on the Blue Book by December 2010 To have a complete draft (for all sections) of the Green Book by Spring 2011

Detailed progress on Magenta Book  The version recently published for 2nd Agencies’ review has been discussed  WG members were encouraged to advertise the review within their own Agencies  Few editorial changes were agreed and collected in an ad-hoc document; these will be inserted at the end of the review process  Figure 3-1 has been extensively discussed  MM and JB to draft a new version of it, for WG discussion  The possibility to insert several figures in sect. 4 (one for each scenario) has been discussed  JB to draft one figure, for WG discussion  The draft pictures will be provided within 1 month, and discussed via telecon

Detailed progress on Blue Book  The book was revised by the WG  Version v3 is now ready for editorial review  The WG resolves that document W-0 can go to CESG and CMC approval, for Agency review  ESA stated that, according to current plans, their prototype will be ready by mid 2011  NASA will develop plan and schedule for prototype  JAXA stated that, according to current plans, their prototype will be ready by mid 2011  Based on the above, testing and evaluation will be done during the second half of 2011  This will allow collecting material for the related Yellow Book  It is noted that the current CCSDS scheduling tool foresees prototyping only after the 2nd Agency review, whereas the SEA Area Director reported that the prototyping before the 2nd review will be needed

Detailed info on Yellow Book  Preliminary table of contents  Two main chapters, one for Magenta Book, one for Blue Book Magenta Book: chapters on testing of Operational and Validation Scenarios Blue Book: testing of completeness of the information content (i.e. the stated parameters are sufficient for obtaining the expected results) and on quality of results Blue Book: testing the capability of each Agency to produce data in the specified format and to make use of such data  In both cases, test plans, test procedures and test reports will be produced

Detailed progress on Green Book  Sections 1 to 5 were discussed during the meeting.  The WG agreed that an outline of the remaining sections shall be due before the next CCSDS Fall Meeting  Outline for chapter 5  Action: MM and HT  Outline for chapter 6  Action: MM  Outline for chapter 7  Action: MM  Outline for chapter 8  Action: HT  All sections shall be then completed, at least in a draft form, two months before the CCSDS Fall meeting  All WG members to review existing sections (1 to 5)  It is noted that chapters 6 and 7 may move to the Yellow Book

Open Issues / Areas of concern  What are the currently known open issues Currently there are no open issues  Areas of concern Time and resources could limit the progress on the Green Book during 2010 The prototyping of the Blue Book format will absorb most of the energies in the next year

Risk Management Update  No risk has been highlighted  Resources are always an issue

Cross Area WG / BOF Issues  Are there issues in your WG with other WGs?  Existing limitations in (interagency) data transfer infrastructure may reduce the applicability of the coming Magenta Book  Is there cross WG or cross area coordination needed?  Service Management: SMWG will extend, in the future, their SM procedures to tracking services; interaction with such WG is being put in place, to insure the proper level of coordination  Data Transfer  RF & Mod WG (modification of B needed and agreed)  At what level and how would you like to proceed?  Service management: embed the DDOR service in the SM framework  discussions with SMWG are on going, a more focalised concept of the required SR has been provided to SM WG  Data transfer: through the production of an ad-hoc Blue Book, then discuss with CSS-SM and CSS-CSTS whether to manage/formalize data transfer (but it should be just a question of protocols)  Modification of sect B as required