PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.

Slides:



Advertisements
Similar presentations
AITA 9, MERTIS Team – MERTIS Calibration, Oct 2007 Folie 1 Development of a calibration concept for the MErcury Thermal Infrared Spectrometer Thomas Saeuberlich,
Advertisements

PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching.
PACS SVR 38/9 Nov 2007 Wavelength Calibration1 FM ILT Spectrometer Wavelength Calibration Status Report H. Feuchtgruber, R. Vavrek.
Observational techniques meeting #7. Detectors CMOS (active pixel arrays) Arrays of pixels, each composed on a photodetector (photodiode), amplifier,
PACS IQR13 Jan 2005 Optical Plans PFM 1 Optical Qualification and Plans for PFM N. Geis MPE.
PACS IIDR 01/02 Mar 2001 Instrument Overview1 PACS Instrument Design Description and System Performance A. Poglitsch.
Max-Planck-Institut für Astronomie Heidelberg PACS SVR 22./23. June 2006 MPE Garching J. Stegmaier, U. Grözinger, D. Lemke, O. Krause, H. Dannerbauer,
PACS IHDR 12/13 Nov 2003 PACS Instrument Overview1 Instrument Design/Development Overview and System Performance PACS Instrument Overview A.Poglitsch MPE.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
Set-up for Levy Flight of Photons in Resonant Atomic Vapor Danielle Citro (SUNY Oswego), Adailton Feliciano (UFPB), Martine Chevrollier (UFPB), Marcos.
Bruno Altieri September # 1 PACS photometer pipeline overview Bruno Altieri (ESA/HSC)
PACS CoP & PV Review 21/22 Jan 2009 PVSpecWave1 Spectrometer Wavelength Calibration XHSPOT Proposal: PVSpecWave H. Feuchtgruber.
PACS IQR 13 Jan 2005 AVM/CQM ILT – test results1 PACS CQM/AVM ILT Results of functional/performance/ calibration tests.
Detecting Electrons: CCD vs Film Practical CryoEM Course July 26, 2005 Christopher Booth.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
0. To first order, the instrument is working very well ! 1.Evolution of the IR detector with time 2.Stability of the L channel 3.Saturation 4.Linearity.
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS SVR22/23 June 2006 PACS Thermal Behaviour1 PACS Thermal Behaviour Tests T. Müller, H. Feuchtgruber, A. Contursi, Cs. Kiss, Sz. Csizmadia.
CEA / PACS SVR phase 2 Photometer results from the first part of the FM ILT CEA - MPE - NHSC.
PACS SVR38/9 Nov 2007 Commissioning Phase1 Commissioning Phase H. Feuchtgruber.
SPIRE Consortium Meeting La Palma, Oct. 1 – SPIRE FTS Pipeline Trevor Fulton Blue Sky Spectroscopy, Lethbridge, Canada.
PACS FM-ILT SPECTROMETER SPATIAL CALIBRATION A. Contursi (H. Feuchtgruber) PACS Science Verification Review – 8/9 November 2007 MPE-Garching.
PACS IBDR 27/28 Feb 2002 Optical System Design1 N. Geis MPE.
FM-ILT Results: Mechanisms FM1 Chopper and Calibration Sources Markus Nielbock (MPIA) Babar Ali (IPAC) Jeroen Bouwman (MPIA) Helmut Dannerbauer (MPIA)
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
Page 1 PACS NHSC Data Processing Workshop – Pasadena 26 th - 30 th Aug 2013 Overview of SPIRE Photometer Pipeline Kevin Xu NHSC/IPAC on behalf of the SPIRE.
PACS SVR 2 18 Jan 2007 FM ILT: Mechanisms1 FM ILT Results: Mechanisms H. Feuchtgruber, H. Dannerbauer, N. Geis, C. Hartinger, U. Klaas, P. Royer.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
DECam Daily Flatfield Calibration DECam calibration workshop, TAMU April 20 th, 2009 Jean-Philippe Rheault, Texas A&M University.
PACS Spectrometer Spatial Calibration plan in PV phase A.Contursi D. Lutz and U. Klaas.
PACS SVR 22/23 June 2006 Instrument Performance Prediction1 PACS Instrument Model and Performance Prediction A. Poglitsch.
Jörn Helbert Planetary Emissivity Laboratory Facing the heat – Obtaining near infrared real emissivity spectra at Venus surface temperatures.
PACS IIDR ESTEC 01/02 March 2001 OGSE 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher OGSE.
PACS SVR: 22/23 June 2006 MPE - Ge:Ga Detector Array1/16 Ch. Hartinger / L. Barl Ge:Ga Detector Arrays.
PACS IBDR 27/28 Feb 2002 PACS Instrument Overview1 Instrument Design/Development Status and System Performance PACS Instrument Overview A.Poglitsch MPE.
Optimisation of the PACS Chopper Markus Nielbock Ulrich Klaas Jeroen Bouwman Helmut Dannerbauer Jürgen Schreiber Ulrich Grözinger.
PACS IHDR 12/13 Nov 2003 Filters1 N. Geis MPE. PACS IHDR 12/13 Nov 2003 Filters2 PACS Filter Scheme Filter scheme with 5 or 6 filters in series in each.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
CEA DSM Dapnia SAp Readout mode of the Photometer Koryo Okumura, Marc Sauvage, Nicolas Billot, Bertrand Morin DSM/DAPNIA/SAp.
1. Twist propagation in Hα surges Patricia Jibben and Richard C. Canfield 2004, ApJ, 610, Observation of the Molecular Zeeman Effect in the G Band.
Page 1 PACS NHSC Webinar: New SPIRE Features in HIPE th Nov 2012, Pasadena Update on SPIRE Photometer Pipeline Kevin Xu NHSC/IPAC on behalf of the.
PVPhotFlux PACS Photometer photometric calibration MPIA PACS Commissioning and PV Phase Plan Review 21 st – 22 nd January 2009, MPE Garching Markus Nielbock.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
Jan 15, 2004WFC3 TIPS – John W. MacKenty1 WFC3 TIPS Presentation January 15, 2004 Optical Stimulus.
PACS ICC Readiness Review MPE, July 3/ PACS Photometer PV Phase Plan 1 Status Report M. Nielbock: PACS PHOT PV Phase Plan Markus Nielbock (MPIA)
CEA DSM Dapnia SAp Flux calibration of the Photometer Koryo Okumura, Marc Sauvage, Nicolas Billot, Bertrand Morin DSM/DAPNIA/Sap.
Matching monitors for SPS and LHC E. Bravin 31 March 2011.
Jyly 8, 2009, 3rd open meeting of Belle II collaboration, KEK1 Charles University Prague Zdeněk Doležal for the DEPFET beam test group 3rd Open Meeting.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
Overview, Spectrometer Products and Processing Philosophy Phil Appleton on Behalf of PACS Team PACS IFU Spectrometer.
Herschel EQM – Results and Lessons Learnt6/7 Feb 2006 PACS Overall Analysis1 Overall PACS EQM IMT Analysis Contributions by PACS ICC.
11-Jun-04 1 Joseph Hora & the IRAC instrument team Harvard-Smithsonian Center for Astrophysics The Infrared Array Camera (IRAC) on the Spitzer Space Telescope.
PACS ICC Meeting #291/2 Oct 2007 Wavelength Calibration1 FM ILT Spectrometer Wavelength Calibration Status Report H. Feuchtgruber.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
1 st post launch SCIAMACHY calibration & Verification Meeting L1b Astrium Friedrichshafen – Germany 24 July 2002 First level 1b Leakage current analysis.
The InGaAs IR Array of Chunghwa Telecom Laboratory Chueh-Jen Lin and Shiang-Yu Wang, Optics and Infrared Laboratory In 2006, Advanced Technology Laboratory.
PACS IIDR 01/02 Mar 2001 Optical System Design1 N. Geis MPE.
ISUAL Design Concept S. Mende. SDR 7 Jun NCKU UCB Tohoku ISUAL Design Concept S. Mende Sprite Example Sprite Image obtained by Berkeley/NCKU 1999.
- page 1 PACS Phil Appleton on behalf of the NHSC/HSC and the PACS ICC ; especially Bart Vandenbussche and Pierre Royer (KUL Belgium) Instrument Performance.
Topic report 11/09/01 Optical Spectrum Analyzer (OSA) Speaker: Chieh-Wei Huang Advisor: Sheng-Lung Huang Solid-State Laser Crystal and Device Laboratory.
# x pixels Geometry # Detector elements Detector Element Sizes Array Size Detector Element Sizes # Detector elements Pictorial diagram showing detector.
Markus Nielbock (MPIA) – Herschel Pointing PACS ICC Meeting #38 Herschel Pointing Summary and Recent Developments Markus Nielbock (MPIA Heidelberg) with.
PACS Hitchhiker’s Guide to Herschel Archive Workshop – Pasadena 6 th – 10 th Oct 2014 Overview of SPIRE Photometer Data Reduction Pipeline Kevin Xu NHSC/IPAC.
PACS IBDR 27/28 Feb 2002 PACS Thermal Analysis1 Dr. L. Morgenroth CASE GmbH.
Markus Nielbock (MPIA) – PACS Calibration Status Report Herschel Calibration Steering Group Meeting #24 PACS Calibration Status Report Markus Nielbock.
Optical Response of TES Bolometer Arrays for SAFARI
Chris Willott, Loic Albert, René Doyon, and the FGS/NIRISS Team
What Is Spectral Imaging? An Introduction
Slides/Talking Points for October 2007 Consortium Meeting
Presentation transcript:

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer2 Overview Thermal behaviour Spectral coverage Wavelength calibration Spectral resolution and instrumental profile Sensitivity NEP Relative spectral response Leakage and Ghosts Photoconductor Arrays !! Mostly draft results, no final reports yet !!

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer3 Boundary Conditions Limited Time Apply best guess values for detector biases and heater Measurements have been carried out in few flux regimes with mostly smallest capacitor. Optics misaligment and the significant amount of time spent to investigate it Blue and Red spectrometer had to be operated separately

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer4 Thermal Behaviour (1) Results from CUS Observation: “SPEC_thermal_OBS” Test of all spectroscopy components within one single measurement Illustrate the temperature behaviour of PACS during typical spectrometer and photometer operations Determine FPU temperature upper limits during heat dissipation Measure temperature transients in the individual sub-units Assess overall thermal conductances and heat fluxes Verify proper thermal strapping to cryostat thermal reservoirs Identify possible problem areas

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer5 Thermal Behaviour (2) Results from CUS Observation: “SPEC_thermal_OBS” Test of all spectroscopy components within one single measurement Illustrate the temperature behaviour of PACS during typical spectrometer and photometer operations Determine FPU temperature upper limits during heat dissipation Measure temperature transients in the individual sub-units Assess overall thermal conductances and heat fluxes Verify proper thermal strapping to cryostat thermal reservoirs Identify possible problem areas

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer6 Spectral coverage  Available grating range = degrees working range = 43.1 degrees (low grating output) order “measured”specification [45000 – ] n=3 73.2µm – 34.8 µm 72µm - 56µm n=2109.8µm – 52.2µm* 105µm - 72µm n=1219.6µm – 104.3µm 210µm - 105µm * Nominal 72-56µm band can be measured in grating order 2 and 3

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer7 Wavelength Calibration (1)  Sources and available measurements: - FIR-Methanol-Laser provided by LENS Tested spectral lines: , , , µm - OGSE vapor cell Tested spectral range scans: 58-60µm and µm  =  ;  =  ; g LHe = ; n=[1,2,3] ; pix=[1..16]  =  0 -gratpos/dgratwith dgrat=23301[steps/  ] So far just:  0 (FM) =  0 (CQM)  (no detailed analysis and no module dependence yet !)

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer8 Wavelength Calibration (2) Laser: µm Grating order = 3 Filter A Pixel:11,7 Laser setup in front of cryostat

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer9 Wavelength Calibration (3) Laser: µm Grating order = 3 Filter A Pixel:11,7 Signals beyond cut level in white Measured Gaussfit

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer10 Wavelength Calibration (3) Blue spectrometer, Grating order 3, single pixel Vapor cell p = 20-28mbar Red spectrometer, grating order 1,single pixel Vapor cell p = 8.5 mbar Measured Model Measured Model

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer11 Spectral Resolution & Instrumental Profile 3 laser lines confirm predictions from design on central pixels Instrumental profile is “gaussian” at least down to a residue at 3% level

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer12 Staring measurement at fixed grating position and given OGSE BB input flux has been analyzed (no dark current and straylight considerations yet !): CRE setting: Nominal bias, smallest capacitor, 64 readouts per ramp Sensitivity: System NEP Map blue red  88µm; T BB =30K; P pix =3.96e-14W  194µm; T BB =22.5K; P pix =1.15e-14W

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer13 Relative Spectral Response n=3 n=2 n=1 C int =140fF C int =230fF Draft analysis of different spectral scans on OGSE BB at 30K. Single pixel only Probably saturation effects for red detector at 30K Leakage effects seen at longwave band edges Not yet measured with n=1 57µm105µm72µm leakage

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer14 Leakage and Ghosts (1)

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer15 Leakage and Ghosts (2)

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer16 - Plot of Ghost Responses in 1st Order 0thorder0thorder Leak 2nd order Ghost 2nd order 2pass Ghost 1st order 2pass Normal Signal Ghost 1st order 3pass From SVR 1

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer17 - Plot of Ghosts, 1st Order, with Baffles Leak 2nd order Ghost 2nd order 2pass Ghost 1st order 2pass Normal Signal From SVR 1

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer18 Leakage and Ghosts (3) CQM “ghosts” “clean” FM Successful baffling implemented

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer19 - Leakage effects are within expectations from order sorting filter performances - ECR-011, baffle modifications were successful in removing the sharp spectral ghosts seen during CQM - Tests with the strongest laser line at µm did not show leaking features in the blue bands - No ghosts seen during all laser tests Leakage and Ghosts (4)

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer20 Photoconductor Arrays (1) PACS-ME-NCR-236: “2 pixels low response” PACS-ME-NCR-237: “crosstalk in supply group 2”

PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer21 Photoconductor Array (2) PACS-ME-NCR-237: “crosstalk in supply group 2” (few x 100mV/s up to several V/s) Crosstalk is also present in supply group 1, however much less (few x 10mV/s) Measured “Model” Dummy resistor !