February’s Accomplishments Met extensively with FTA staff and received the Record of Decision from FTA Finalized Negotiations with the top ranked Design.

Slides:



Advertisements
Similar presentations
Budget Development Roseville Area Schools.
Advertisements

THE NSF BUDGET Overview of Agency Funding Processes Presented by Beth Blue National Science Foundation Office of Budget, Finance, and Award Management.
St. Joseph Harbor FY 2014 Dredging. St. Joseph Harbor Entrance to the Channel (Prior to Dredging) Areas to be dredged 53,000 Cubic Yards to be removed.
CONTRACTOR OUTREACH PROGRAM September 25, Disaster Recovery Program  $5.08 Billion HUD Funds to Mississippi in form of Community Development Block.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Phase 1 Project Status: Design Continued development of alternative station design concepts for stations in the vicinity of USC and Expo Park Received.
Update on the TIGER Grant for the TPB Regional Priority Bus Project National Capital Region Transportation Planning Board March 17, 2010 Timothy Canan,
Dulles Corridor Metrorail Project 23-mile new Metrorail line branching off the Orange Line after East Falls Church 11 new stations 5 in Phase 1: East Falls.
EEM Established in 1989 Section of the Streets and Highways Code provides the Legislature with the authority to allocate $10 million annually. Fiscal.
Federal Transit Administration New Starts Project Development Process
State Milestones Subsidized Insurance Workgroup High Level Timeline 2011 Jan 2011 Feb 2011 Mar 2011 Apr 2011 May 2011 Jun 2011 Jul 2011 Aug 2011 Sept 2011.
SAFETY * MOBILITY * DELIVERY * STEWARDSHIP * SERVICE Timely Use of Federal and State Funds Stella Liao, P.E. District Local Assistance Engineer 1.
TEX RAIL UPDATE AND T MASTER PLAN PAUL J BALLARD PRESIDENT & CHIEF EXECUTIVE OFFICER FORT WORTH TRANSPORTATION AUTHORITY (THE T) 6 th Annual Northeast.
FasTracks Moving Forward: Regional Transportation Plan (RTP) Amendment Staff Recommendation Phillip A. Washington and Team August 7, 2012.
Montgomery County Transit Task Force Meeting August 17, 2011.
1 November Accomplishments: Design and Construction Began sanitary sewer, gas, waterline and electrical relocations between 18th and 23rd Streets Continued.
Consideration of Contractors for the Engineering Services Contracts for Landfill and Disposal Site Remediation (Solid Waste Disposal Site Cleanup Trust.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
Mid-City Exposition Light Rail Transit Project Closed Session Presentation March 2, 2006 Exposition Metro Line Construction Authority.
Project Status: Design Initiated development of alternative station design concepts for stations in the vicinity of USC and Expo Park Received 85% design.
All Roads Transportation Safety (ARTS) Program Hot Spot ODOT Region 1 Kick-Off Meeting March 18, 2015.
Sacramento Local Agency Formation Commission (LAFCo) UPDATE ON PROPOSED SMUD ANNEXATION Presented to Yolo LAFCo September 19, 2005.
Navajo Nation Integrated Justice Information Sharing Project NNIJISP Office of the Chief Prosecutor Conference Albuquerque New Mexico October 24, 2008.
CYMPO TRANSIT SYSTEM GOVERNANCE and STAFFING IMPLEMENTATION ISSUES.
Workshops on Discussion Draft of Guidelines December 2014.
December Accomplishments: Design and Construction Continued trenching for and laying of storm drain pipe in Flower Street from I -110 to 23rd Street Started.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
1 August Accomplishments Conducted the 4 th Urban Design Committee meeting, which consisted of a tour of the Metro Orange Line. Conducted one-on-one briefings.
LA Metro’s Highway Program May 29, 2014
Expo Line Transit Project Exposition Light Rail Transit Project Expo Board Presentation Monthly Project Status Update January 14, 2008.
Silver Line Phase 1 – Status Report Status Overall Phase 1 Construction – 99% complete All Station at 98% complete except Wiehle – Reston East at 99% complete.
May’s Accomplishments Mobilized Authority and Design Build Contractor staff to Authority offices at 707 Wilshire Three Open House meetings were held in.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
July Accomplishments: Authority and Design Build Contractor staff conducted the 3rd Urban Design committee meeting. Committee members viewed proposed station.
IARC Milestones completed Sept 2011: End of Tevatron Run, FESS obtains ~full access to infrastructure at CDF, PPD begins D&D in CDF assembly bldg Sept.
Department of Public Works Approval of a Journal Voucher Amending Projects in the FY 2011 Capital Improvement Program Budget and Appropriate $125,000 in.
By: Linda Dickinson Agenda Item 7 May 11, 2004 Tire Product Commercialization and Applied Technologies Grant Awards.
TOWN OF EDENTON NEW POLICE DEPARTMENT.
Exposition Light Rail Phase 2 - Recommendation for Alternative Siting of Maintenance Facility within the City of Santa Monica.
Los Angeles County Metropolitan Transportation Authority FY16 Budget Development: Preliminary Capital Program Board Staff Briefing February 12, 2015 The.
ESPLOST Update Savannah-Chatham County Public Schools January 9, 2008.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
City of South Gate Administrative Services Dept. FY Proposed Budget Presentation.
Approval of January 15, 2013 Minutes Public Comments.
Expo Line Transit Project Exposition Light Rail Transit Project Expo Board Presentation Monthly Project Status Update October 2, 2008.
PCE Program Debrief Jim Eggemeyer, Director, Office of Sustainability Shawn Marshall, LEAN Energy US March 24, 2016.
What is Tax Increment Financing?
Access Services Comprehensive Operational Review Presentation #1 T-PAC February 9, 2017 RFSConsulting.
City Council Meeting November 7, 2016
Light Rail Transit Project
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Main Street Improvements
PROPOSED 34 BIKE SHARE STATION LOCATIONS FOR PHASE 2 OF THE LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (METRO) REGIONAL BIKE SHARE PROGRAM.
AUTHORIZATION TO ENTER INTO A CONTRACT WITH LAZ PARKING FOR THE MANAGEMENT, OPERATION AND MAINTENANCE OF THE PASEO SUBTERRANEAN, MARENGO, LOS ROBLES, HOLLY.
High Street Streetscape Improvement Project
Phase 1 Project Status: Design
Florida Transportation Commission FY 2009
Polk Transportation Planning Organization April 14, 2011
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
Program Prioritization & SBCC Schedule
Delta Water Supply Project
Back-End Payor Sub-Group
Durham and Orange Transit Plan Funding Needs
Omnibus IV Contract Overview Elieen Emond Contract Specialist
Drafting Group: Final Meeting Drafting Group: 1st Meeting
Department Of Energy Review Linac Coherent Light Source Project
IT Managed Services Transition Weekly Activity Report: May 28th, 2019
Port Back Data Collection & Transition
Los Angeles County Metropolitan Transportation Authority
Presentation transcript:

February’s Accomplishments Met extensively with FTA staff and received the Record of Decision from FTA Finalized Negotiations with the top ranked Design Build Proposer Continued development of draft Master Cooperative Agreement with Metro Western and Exposition intersection looking west

March’s Planned Activities Wesley Street looking east along National Boulevard Metro presents STIP funding recommendations to California Transportation Commission (CTC) on March 9 CTC considers TCRP funding request on March 16 Issue NTP to design build contractor and commence mobilization March 17 Meet with FTA national office in Washington, D.C. to review project

March’s Planned Activities (continued) Prepare FY 07 budget Complete design of major utility relocations Complete negotiation of Master Cooperative Agreement with Metro Expo outreach at Los Angeles Trade Tech March 1 Hire staff positions approved for FY06 Set up Construction Authority field office Receive City of Los Angeles approval of Flower Street design

Project Major Milestones FEIS/R PE Flower St. Design Development Jan 2006Feb 2006Mar 2006 Authority Board Actions Receive FTA Record of Decision Apr 2006 Receive Design/Build Contract Proposals Award Design/Build Contract May 2006 Jun 2006 Design Build Contract FUNDING CTC Allocation of TCRP Evaluation and Recommendation Approval of Master Cooperative Agreement with Metro NTP and Mobilization Commence Design FY 07 Budget Approval CTC STIP Adoption Los Angeles City Approval