CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, 2014.03.21 Simao Machado, EN/EL/CF.

Slides:



Advertisements
Similar presentations
© DIAMOND Headquarters / F-3000 r & rs / / 1 WERE WELL CONNECTED F-3000 r & F-3000 rs connectors.
Advertisements

Track Trigger Designs for Phase II Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen, S.X. Wu, (Boston.
LIU CABLING & OPTICAL FIBRES STRATEGY Georgi Minchev Georgiev EN-EL-CF.
1 Nexans Cabling Solutions Fibre solutions for fast deployment Joost Grillaert.
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
1 MUON UPGRADE: ME0 GMM All engineering drawings from Sasha Surkhov PRELIMINARY !!
Jean-Claude Guillaume ATOP Days – CERN, 5 March 2009 Review of irradiated cables in the SPS Part I – Present strategy Jean-Claude Guillaume Cables and.
August 98 1 Jürgen Knobloch ATLAS Software Workshop Ann Arbor ATLAS Computing Planning ATLAS Software Workshop August 1998 Jürgen Knobloch Slides also.
TD/MSD TORUS CMM PRODUCTION: OVERVIEW G. Velev Clas12 Torus CCM Production Readiness Review –Dec 4, 2013.
1 Nexans Cabling Solutions Easy and reliable migration from fast to faster to100G.
Overview of basic issues.   The design of the (Outer) Tracker Upgrade for phase 2 has been ongoing for more than 4 years  So far the (implicit) assumption.
Electrical and Optical Cables Installation at P5 What When How H. Breuker
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Status and plans for online installation LHCb Installation Review April, 12 th 2005 Niko Neufeld for the LHCb Online team.
Doing business with CERN Anders Unnervik 3 November 2014.
Ken Wyllie, CERN Upgrade infrastructure, Feb LHCb Upgrade Electronics Infrastructure K. Wyllie & L. Roy.
MoEDAL MoU EDMS No Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
Niko Neufeld PH/LBC. Detector front-end electronics Eventbuilder network Eventbuilder PCs (software LLT) Eventfilter Farm up to 4000 servers Eventfilter.
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
LEAF 03 March Optical Fibre Services for Experiments Luit Koert de Jonge/TS-EL-OF.
Optical Fibres for the LHC Machine and Experimental Areas Optical Fibre Meeting 3 October 2002 Luit Koert de Jonge/ST-EL-OF.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Network infrastructure for CERN DataCenter HEPiX Fall 2015.
Astrophysics Detector Workshop – Nice – November 18 th, D. Attié, P. Colas, M. Dixit, M. Riallot, W. Wang Micromegas tests ̶
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Overview of DT group activities in LHCb LHCb CERN team retreat, Les Houches Burkhard Schmidt, PH-DT January 13, 2016.
E. Calvo (BE/BI-QP) 12/10/2015 LHC BI fibre infrastructure.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
The Versatile Link System-level Component Tests
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
Review of the processes released in the framework of the MMP Goran Perinić.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
1 Rick Dallmann Session: DB 1.1 Designing Next-Generation SAN/Storage Optical Infrastructure Why Low Link (Budget) Loss is Critical.
Logo area 11 T Wire: Procurement Strategy and QA/QC B. Bordini, A. Ballarino, M. Macchini Acknowledgments: thanks to E. Charifoullina for her contribution.
SYNERGIES IN ROLL-out of networks by Energy UTILITIES and telecoms 26 June 2014, Brussels Joachim Hoenig, Director, Brussels Representatives Office Group.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Upgrade activities DT-LHCb coordination meeting 14 March 2016.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
ITER-CERN Workshop CERN EN/EL Installation contract policy 17 January 2017 Serge OLIGER On behalf of the Electrical Engineering Group (EN-EL) at CERN.
Cabling for LHCb Upgrade
Micro duct cabling at CERN
TC activities.
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
ITER-CERN Workshop CERN approach to the large-scale installation of Fibre Optics & Cabling 17 Jan 2017 Daniel RICCI On behalf of the Electrical Engineering.
EYETS LHC 2016/2017 Works EN/EL/CF
Safety in Construction and Upgrade Phases
TE-MPE LS1 review Vision from EN-EL(CF)
2 Fraunhofer INT Euskirchen Germany
Micromegas tests ̶ Test beam 2010 plans ̶ RD51 Mini Week - CERN
YETS & LS2 Reminder G. Girardot 20 juin 2017.
Fiber Installation for RUN 3&4
Business opportunities related to CERN electrical network
Characterizing FOX Demonstrator Test Setups for LArDPS to FEX Modules at CERN RuthAnn Gregory.
ILO Industrial Opportunities Days, 6-7 June 2019
Fiber Reinforced Polymer Systems
Presentation transcript:

CERN EN-EL Cabling and Optical Fibre Section CERN EN-EL Cabling and Optical Fibre Section Mini Workshop, Simao Machado, EN/EL/CF

Simao Machado – EN/EL/CF – Cabling and Optical Fibre Section (EN-EL-CF)  SUMMARY  EN-EL-CF SECTION  FIBER UNIT MAIN ACTIVITIES  ORGANISATION FOR LS1  COLLABORATION WITH CERN EXPERIMENTS  OVERVIEW ON THE COLLABORATION FOR CMQ DAQ UPGRADE 2

Simao Machado – EN/EL/CF – Cabling and Optical Fibre Section (EN-EL-CF)  THE SECTION  EN-EL-CF : Cabling and Optical Fibre Section  MANDATE  Provide and standardise copper (DC & control) and fibre cabling systems for all CERN users  Organise cabling installation and removal campaigns  Assure preventive and corrective maintenance  Provide and manage an optical fibre installation database  ORGANISATION  3 Units 3

Cabling and Optical Fibre Section (EN-EL-CF)  FIBRE UNIT MAIN ACTIVITIES:  In collaboration with CERN users, design and manage the optical fibre infrastructure  Establish and manage industrial contracts for the supply and installation of passive optical fibres components  A large contract for supply and installation of all standard components (fibres, cables, terminal equipment, patchcords)  Large contracts for supply of RAD-RESISTANT fibres (~ 2500 km) plus cabling (~100 km) within existent frame contract  Qualification, quality assurance and quality control of specialty optical fibres and new passive optical components through frame contract.  Laboratory equipped with microscopes, interferometers, OTDR, insertion loss/return loss meters for single and multi- fibre connectors.  CERN Safety Instructions Compliant  Standard Passive Solutions for all CERN users Fig. 1 - Overview on the complex and capillary fibre infrastructure at CERN with approximately 30’000 km 4Simao Machado – EN/EL/CF –

Cabling and Optical Fibre Section (EN-EL-CF)  ORGANISATION OF FIBRE UNIT FOR LS1  ANTICIPATION OF LS1: PREPARATION STARTED ABOUT 1.5 YEARS BEFORE  Studies, qualification and procurement components  Establish deadline for new projects requests  18 Large projects and 350 works for LS1  SMOOTH SECTION MANPOWER INCREASE BEFORE LS1  DELIVER PLANNING OF ACTIVITIES TO CONTRACTOR  Organisation of contractors resources and expertise 5 FIBRE UNIT PLANNING for LS1 at LHC Simao Machado – EN/EL/CF –

Cabling and Optical Fibre Section (EN-EL-CF)  COLLABORATION WITH CERN EXPERIMENTS DURING LS1  EXAMPLES OF OPTICAL FIBRE REQUESTS  Qualification and supply of components (ex: Trunk Cables)  CMS DT Barrel Muon Detector  CMS Trigger Upgrade  TOTEM  Project design, supply and installation of components  CMS Data Acquisition System Upgrade  CMS Fibre Sensor System  ALICE T0/V0 Upgrade  ALICE TPC Upgrade for LS2  LHCb DAQ Upgrade (17000 FO) 12F-MPO connectors (Elite Ferrules) 6Simao Machado – EN/EL/CF –

Cabling and Optical Fibre Section (EN-EL-CF)  COLLABORATION FOR CMS DAQ UPGRADE  1 ST Phase: Project design, supply and installation of components  From SCX5-1 to USC55-S2  1700 Multimode OM3 Fibres  LC connectors for active equipment  2nd Phase: Qualification and supply of optical components  USC55-S1/S2  Passive Terminal Equipment  Patchcords and Patchcables 7Simao Machado – EN/EL/CF –

Cabling and Optical Fibre Section (EN-EL-CF)  COLLABORATION FOR CMS DAQ UPGRADE (1 st Phase)  PRELIMINARY STUDY OF TECHNICAL FEASIBILITY 8

Cabling and Optical Fibre Section (EN-EL-CF)  COLLABORATION FOR CMS DAQ UPGRADE (1 st Phase)  PROJECT DESIGN AND COST ESTIMATION 9Simao Machado – EN/EL/CF –

Cabling and Optical Fibre Section (EN-EL-CF)  COLLABORATION FOR CMS DAQ UPGRADE (1 st Phase)  PROCUREMENT OF COMPONENTS  Ducts, microduct, cables  Optical terminal equipment  Patchcords  PREPARATION OF TECHNICAL DOSSIERS, SAFETY PROCEDURES AND PLANNING 10Simao Machado – EN/EL/CF –

Cabling and Optical Fibre Section (EN-EL-CF)  COLLABORATION FOR CMS DAQ UPGRADE (1 st Phase)  WORK EXECUTION & CONTROL BILL OF QUANTITIES 11Simao Machado – EN/EL/CF –

Cabling and Optical Fibre Section (EN-EL-CF)  COLLABORATION FOR CMS DAQ UPGRADE (2 nd Phase)  PROJECT DESIGN OF HIGH DENSITY MANAGEMENT SYSTEM IN USC55-S2 12Simao Machado – EN/EL/CF –

Cabling and Optical Fibre Section (EN-EL-CF)  COLLABORATION FOR CMS DAQ UPGRADE (2 nd Phase)  PROCUREMENT OF COMPONENTS  Optical terminal equipment  Patchcables and Patchcords  QUALITY CONTROL  Visual inspection of components (cables and terminal equipment)  Measurements of ferrules end-face geometry (interferometer)  Insertion and return loss measurements 13Simao Machado – EN/EL/CF –

Cabling and Optical Fibre Section (EN-EL-CF)  COLLABORATION FOR CMS DAQ UPGRADE (2 nd Phase)  PROCEDURES FOR INSTALLATION & CLEANING 14Simao Machado – EN/EL/CF –

 COLLABORATION FOR CMS DAQ UPGRADE (2 nd Phase)  IMPLEMENTATION RESULTS Cabling and Optical Fibre Section (EN-EL-CF) 15Simao Machado – EN/EL/CF –

 COLLABORATION FOR CMS DAQ UPGRADE (2 nd Phase)  PROJECT DOCUMENTATION Cabling and Optical Fibre Section (EN-EL-CF) (2 nd Phase) (1 st Phase) 16Simao Machado – EN/EL/CF –

Thanks Cabling and Optical Fibre Section (EN-EL-CF) 17Simao Machado – EN/EL/CF –

Backup slides Cabling and Optical Fibre Section (EN-EL-CF) 18Simao Machado – EN/EL/CF –

 INDUSTRIAL SUPPLY CONTRACT SPECIFICATIONS:  Detailed requirements on  Compliance with ITU-T international standards  Radiation resistance and optical properties  Spool minimum lengths, tracking, etc.  2500 km procured in 2006 plus 2400 km procured in 2012 (~150 km/month)  A QUALITY ASSURANCE PLAN, WITH EXTENSIVE QUALITY CONTROL WAS PUT IN PLACE:  Extensive fibre qualification tests performed during 2 years before contract placement  Each preform was tested (radiation).  Implemented cabling and fibre tracking system at both manufacturer's and CERN Qualification and procurement of Radiation Resistan Fibres 19Simao Machado – EN/EL/CF –

 10GbE, 40GbE and 100 GbE upgrade  QUALIFICATION OF COMPONENTS FOR HIGH DENSITY SYSTEM  Sub-Racks 4U for 288 fibres  Terminal Modules (2*12F MTP to 24 LC)  Trunk Cable with 12F MPO for 72 OM4 FO  High performance MPO connectors with Elite Ferrule  SUPPLY AND INSTALLATION OF MODULAR CABLING SYSTEM  Polarity Method B  Max. Channel Insertion Loss 1.5 dB  Average MPO/MTP loss 0.1 dB (max dB)  Minimum Return Loss 25dB CERN Computer Centre Upgrade 20Simao Machado – EN/EL/CF –