HELIX Project (Hp Eradication - LInuX integration) A project in SL, ST, IT and PS.

Slides:



Advertisements
Similar presentations
24-Apr-03UCL HEP Computing Status April DESKTOPS LAPTOPS BATCH PROCESSING DEDICATED SYSTEMS GRID MAIL WEB WTS SECURITY SOFTWARE MAINTENANCE BACKUP.
Advertisements

Alastair Dewhurst, Dimitrios Zilaskos RAL Tier1 Acknowledgements: RAL Tier1 team, especially John Kelly and James Adams Maximising job throughput using.
HEPiX, CASPUR, April 3-7, 2006 – Steve McDonald TRIUMF Steven McDonald & Konstantin Olchanski TRIUMF Network & Computing Services
INSTALLING LINUX.  Identify the proper Hardware  Methods for installing Linux  Determine a purpose for the Linux Machine  Linux File Systems  Linux.
Duke Atlas Tier 3 Site Doug Benjamin (Duke University)
By Mr. Abdalla A. Shaame 1. What is Computer An electronic device that stores, retrieves, and processes data, and can be programmed with instructions.
ST Technical Committee 15th October LHC Ventilation Control System migration D. Blanc ST-CV.
Virtual Network Servers. What is a Server? 1. A software application that provides a specific one or more services to other computers  Example: Apache.
Backup Rationalisation Reorganisation of the CERN Computer Centre Backups David Asbury IT/DS Friday 6 December 2002.
Storwize V7000 IP Replication solution explained
Comprehensive IT Consulting Services an innovative approach to business.
Introduction to Computer Administration System Administration
CT NIKHEF June File server CT system support.
Learning Outcomes At the end of this lesson, students should be able to: State the types of system software – Operating system – Utility system Describe.
Server Types Different servers do different jobs. Proxy Servers Mail Servers Web Servers Applications Servers FTP Servers Telnet Servers List Servers Video/Image.
Windows Server MIS 424 Professor Sandvig. Overview Role of servers Performance Requirements Server Hardware Software Windows Server IIS.
Storage Survey and Recent Acquisition at LAL Michel Jouvin LAL / IN2P3
1 The Virtual Reality Virtualization both inside and outside of the cloud Mike Furgal Director – Managed Database Services BravePoint.
Day 10 Hardware Fault Tolerance RAID. High availability All servers should be on UPSs –2 Types Smart UPS –Serial cable connects from UPS to computer.
About the Presentations The presentations cover the objectives found in the opening of each chapter. All chapter objectives are listed in the beginning.
14th April 1999Hepix Oxford Particle Physics Site Report Pete Gronbech Systems Manager.
Elements of a Computer System Dr Kathryn Merrick Thursday 4 th June, 2009.
Time stamping with CAEN V1290N Bled, 26 th – 28 th March 2008 Dušan Ponikvar, Dejan Paradiž Faculty of Mathematics and Physics Ljubljana, Slovenia.
How to buy a PC Brad Leach David Howarth James Sawruk Andrew U.
The PC The PC is a standard computing platform, built around a EISA bus (1988) –IBM compatible –“Intel Architecture” from Intel or AMD or other companies.
ASGC 1 ASGC Site Status 3D CERN. ASGC 2 Outlines Current activity Hardware and software specifications Configuration issues and experience.
Configuration.
08/06/00 LHCb(UK) Meeting Glenn Patrick LHCb(UK) Computing/Grid: RAL Perspective Glenn Patrick Central UK Computing (what.
4th ST Workshop, Chamonix 2001U. Epting, M.C. Morodo Testa, P. Sollander Is the CERN recommended SCADA useable for the ST division?
Benefits: Increased server utilization Reduced IT TCO Improved IT agility.
System Analysis (Part 2) The System Development Life Cycle Problem Selection and Feasibility Study.
30-Jun-04UCL HEP Computing Status June UCL HEP Computing Status April DESKTOPS LAPTOPS BATCH PROCESSING DEDICATED SYSTEMS GRID MAIL WEB WTS.
+ discussion in Software WG: Monte Carlo production on the Grid + discussion in TDAQ WG: Dedicated server for online services + experts meeting (Thusday.
Cloning NT Using DriveImage Chris Brew Particle Physics Department Rutherford Appleton Laboratory rl.ac.uk.
13 th May 2004LINUX, which LINUX?1 Presentation to the AB/CO Technical Committee – Linux as the Future Console O/S Alastair Bland, 13 th May 2004.
Server Systems Administration. Types of Servers Small Servers –Usually are PCs –Need a PC Server Operating System (SOS) such as Microsoft Windows Server,
Paul Scherrer Institut 5232 Villigen PSI HEPIX_AMST / / BJ95 PAUL SCHERRER INSTITUT THE PAUL SCHERRER INSTITUTE Swiss Light Source (SLS) Particle accelerator.
CASPUR Site Report Andrei Maslennikov Lead - Systems Karlsruhe, May 2005.
Hosting on a managed server hosted by TAG  No technical support required  Full backup of database and files  RAID 5 system means that if a hard drive.
28 April 2003Imperial College1 Imperial College Site Report HEP Sysman meeting 28 April 2003.
VirtualizationAll-In-OneUpgrades Technical Consulting IntegrationSolution Manager.
Using Virtual Servers for the CERN Windows infrastructure Emmanuel Ormancey, Alberto Pace CERN, Information Technology Department.
CCA Forum Fall Meeting1 5-6 October CCA Common Component Architecture cca-forum.org Server Migration David E. Bernholdt ORNL.
RAL Site Report John Gordon IT Department, CLRC/RAL HEPiX Meeting, JLAB, October 2000.
Focus 2 March 2000Recent AFS Problems and Current Planning 1 Focus 2 March 2000 H.Renshall PDP/IT.
Manchester Site report Sabah Salih HEPP The University of Manchester UK HEP Tier3.
S.Jarp CERN openlab CERN openlab Total Cost of Ownership 11 November 2003 Sverre Jarp.
Integra32 System - Training Course
System Hardware *Draft* 08/09/2000 What hardware will we need for: –Development of DSpace –Initial rollout of DSpace to customers –DSpace usage through.
IDE disk servers at CERN Helge Meinhard / CERN-IT CERN OpenLab workshop 17 March 2003.
Cluster Configuration Update Including LSF Status Thorsten Kleinwort for CERN IT/PDP-IS HEPiX I/2001 LAL Orsay Tuesday, December 08, 2015.
PC clusters in KEK A.Manabe KEK(Japan). 22 May '01LSCC WS '012 PC clusters in KEK s Belle (in KEKB) PC clusters s Neutron Shielding Simulation cluster.
CERN-IT/DB After-C5 Presentation EDMS Service Migration Monica Marinucci Lopez October 4th 2002 EDMS Document:
1 ENG224 INFORMATION TECHNOLOGY – Part I 1. Introduction to Computers.
CO$T TE150 ON-LINE. $$$$ = Expensive $$$ = Moderate $$ = Minimal $ = Negligible $CALE TE150 ON-LINE CO$T.
RAL PPD Tier 2 (and stuff) Site Report Rob Harper HEP SysMan 30 th June
Mass Storage at SARA Peter Michielse (NCF) Mark van de Sanden, Ron Trompert (SARA) GDB – CERN – January 12, 2005.
The RAL PPD Tier 2/3 Current Status and Future Plans or “Are we ready for next year?” Chris Brew PPD Christmas Lectures th December 2007.
10/18/01Linux Reconstruction Farms at Fermilab 1 Steven C. Timm--Fermilab.
Virtual Server Server Self Service Center (S3C) JI July.
CERN Disk Storage Technology Choices LCG-France Meeting April 8 th 2005 CERN.ch.
Solaris containers (Zones) Server virtualization What zones are and how they are used in ECE/CIS at the University of Delaware Ben Miller.
Open-E Data Storage Software (DSS V6)
PC Farms & Central Data Recording
CERN Windows Roadmap Tim Bell 8th June 2011.
GridPP Tier1 Review Fabric
Linux and TCP/IP Networking
Function of Operating Systems
Presentation transcript:

HELIX Project (Hp Eradication - LInuX integration) A project in SL, ST, IT and PS

What is HELIX? SL project to replace WS  ST project –Replace old expensive HP servers with new cheap linux servers File servers Data servers (TDS) Application servers….perhaps not yet… –Use IT CERN wide services as far as possible purchase, installation, configuration, maintenance,...

Existing Hardware SL and ST PCRSRV1 & PCRSRV9 each consist of : - HP K-Class Server 3 CPU PA-Risk 8200 cost: 60,000CHF - Eurologic El-RAID GB user space cost: 38,000CHF

IT File Server (pcrsrv1 ?) Experimental file server comprising : – Elonex 24-bay cabinet – Floppy + CDROM – Linux system disk + mirror disk – 2 sets 10 x 75GB IBM disks (RAID mirrored) – 1.5TBytes < 30,000CHF

IT LINUX Farm (pcrsrv9 ?)

Data Servers (TDS) The third TDS server (for ENS) machine is a PC running linux. There is a spare linux machine as backup.

Application servers Now running applications for –ST/AA - FactoryLink or DVtools access –ST/CV - UMMI (DV) supervision –ST/EL - UMMI (DV) until ENS ready –ST/MO - UMMI (DV) supervision –TIS - UMMI and LabView A LOT OF SOFTWARE ON HP!!!!

What’s next? ST involved in project from the start! –We have many many HP applications and we depend on SL services. User requirements phase –Each group will be consulted during UR phase –At first glance, we phase out rather than port sw Don’t panic (yet). – But don’t buy any more HP hardware without consulting the Helix project team

Conclusion Should be a divisional project –Great impact on operation in many ST groups –Need for divisional strategy for the future (ST CSWG) –Man power for SW porting and new hardware cost should not be underestimated