1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Steve Sawch Asst. Director, Construction Management NSLS-II CF Construction Preparations May 8, 2008.

Slides:



Advertisements
Similar presentations
Bob Smith, P.E. Region 1 Benjamin Acimovic, P.E., Region 1
Advertisements

Roles & Responsibilities in Construction Management
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Lessons Learned: CM at Risk & Design Build
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Managing a Successful Mechanical System project Following design – what next?
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
Internal Audit Review For Small Projects Cyndi Fout Project Services Director October 26, 2009.
David Saenz Facility Advisory October 30, 2007 CONVENTIONAL FACILITES MANAGEMENT.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Readiness Stephen Sawch, Assistant Director for Construction Management Conventional Facilities.
Engineering & Buildings Procurement Seminar.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
U.S. Small Business Administration
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities NSLS-II PAC Review.
Construction Management: At Risk. PROJECT MANAGEMENT STRUCTURE: Contractual Relationships Owner Architect/Engineer General Contractor Sub Construction.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Update Marty Fallier Director for Conventional Facilities NSLS-II PAC Meeting May 24, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
1 Lori Plummer 1 LCLS Office Space FAC Review – Breakout Session CONVENTIONAL FACILITIES LCLS Office Space Lori Plummer, PMP,
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Status Update Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities CFAC Cost Review May 9, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Support Update Diane Hatton, Project Support Division Director NSLS-II Project Advisory Committee Meeting May 24-25,
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement David J. Paveglio Contracts Administrator Laboratory Office Buildings CFAC Review - November 9-10, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement Anthony Guadagni Procurement Manager NSLS-II Project Advisory Committee Meeting December 10.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities NSLS-II Conventional Facilities Update May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion & CCW Piping Thomas F. Joos, PE Lead Civil/Structural Engineer CFAC Review March 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Presentation to PAC R. Casey NSLS-II ESH Program Status May 25, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
Agency Construction Management :CM NOT AT-RISK
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Procurement David Dale Procurement Manager NSLS-II Project Project Advisory Committee November 20, 2007.
Conformance & Documentation Services Copyright © 2009 Sleighter Engineering, Inc.
Aug. 22, 2007 CF7S Americas EDR Kick-Off A&E Selection the Fermi Process Tom Lackowski.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
Supervisor services. Project manager Technological group Chief supervisor Supervisors facilities HSE Quality engineer HSE engineer Administrative support.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck 1 CEFPI’s 81’st Annual International Conference PROJECT QUALITY MANAGEMENT by Edward M. Kopp and James Yatzeck.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
Construction Management At Risk Process
Capital Facilities Program Update San Rafael City Schools 10 May 2016.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement David Dale Procurement Manager CFAC Status Meeting May 8, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
Project Delivery Systems
Meeting of the LCLS Facilities Advisory Committee
CONVENTIONAL FACILITIES LCLS Office Space Procurement
Phase 1 Statement of Work Preconstruction “Plan The Work”
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Steve Sawch Asst. Director, Construction Management NSLS-II CF Construction Preparations May 8, 2008

2 BROOKHAVEN SCIENCE ASSOCIATES Construction Preparations Outline Construction Delivery Development Construction Delivery Approach Establish BNL Management Team Staffing Requirements CF Organization Chart Responsibility Matrix Construction Readiness Path Forward

3 BROOKHAVEN SCIENCE ASSOCIATES Construction Delivery Development Original Plan Award to General Contractor Manage with CM as Agent –Pre-Construction (Liro/Gilbane) –Construction (separate award) DOE Review Questions Need to build up BNL staff What is bid climate Need to define CM role CM not at risk – how to motivate CM

4 BROOKHAVEN SCIENCE ASSOCIATES Construction Delivery Development BNL Construction Delivery Review Analysis of Delivery Methods –CM at Risk (GMP/Multiple Primes) –Agency CM –Lump Sum award to GC Contractor Outreach Construction Readiness Workshop Recommend CM at Risk or BNL to Manage Decision -BNL to Manage GC

5 BROOKHAVEN SCIENCE ASSOCIATES Construction Delivery Approach Decided to continue with GC construction delivery approach using BNL CF Team as CM Appears to be qualified competitive pool of contractors for GC bid BNL CF Team has experience in acting as CM This approach provides most direct control of contractor performance CM/GC would introduce new schedule and cost risk for procurement

6 BROOKHAVEN SCIENCE ASSOCIATES Establish BNL Construction Team Team Roles and Responsibilities Identify Staffing Requirements Hire Project Team Permanent Term Augment with CM/Engineer Firm staff if needed BNL Holds Job Fair Great response from construction and engineering candidates Team Hires 3 Engineers Hired Interviewing candidates for construction positions

7 BROOKHAVEN SCIENCE ASSOCIATES CONVENTIONAL FACILITIES Design Bid & Award Site Prep Ring Building Ring Building Close-out LOBs LOB Close-out CF PERSONNEL DivisionStatusRESPONSIBILITIES 1Director CFFilledCF Oversight 2Assistant Director Design CFFilledA/E Design 3Assistant Director Construction CFFilledConstruction Management 4Cost/Schedule Engineer PSFilledScheduling/Cost tracking 5Civil/Structural Engineer CFFilledA/E Design & Construction RFI's 6Mechanical Engineer CFFilledA/E Design & Construction RFI's 7Electrical Engineer CFFilledA/E Design & Construction RFI's 8Construction Engineer CF*Plan 3Q08Construction Management 9Administrative Assistant CF*FilledOffice Administration 10Clerk of the Works CF*Plan 1Q09Files/Logs/Record Keeping 11Civil/Architectual Inspector CF*Plan 4Q08Field Inspection 12Mechanical Inspector CF*Plan 2Q09Field Inspection 13Electrical Inspector CF*Plan 2Q09Field Inspection 14Safety Engineer (1.5 FTE) ESHPlan 3Q08Project Safety 15Procurement (3 FTE) PSFilledContracting 16PE Engineers/Trades (1.5 FTE) PEPlan 2Q09Utility/Fire Protection Support 17Architect/Engineers (3.5 FTE) HDRFilledDesign Total of 22.5 FTECF-Conventional Facilities/PS-Project Support/PE-Plant Engineering * Either BNL hire or augmented staff Construction Staffing Requirements

8 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Organization Conventional Facilities Director M. Fallier NSLS II Design A/E HDR A. Soueid[C] Asst. Director CF Design Management O. Dyling Commissioning Contractor TBD [C] PE Trade Shop Support – Various [M] Subconsultants Vita-tech Colin -Gordon VJ Assoc.[C] Construction Management Field Team Lead Electrical Engineer T. Nehring Civil/Structural Lead Engineer T. Joos Facility Dynamic Modeling & Analysis N. Simos [M] Lead Mechanical Engineer J. Gosman [M] – Matrixed [C] - Contracted Asst. Director CF Construction Management S. Sawch Field Office Admin. Asst. Electrical Inspector Civil/Arch Inspector Mechanical Inspector Construction Safety Specialists [M] 1.5 Project Architect T. McEvaddy [M] M. Toscano Sr. Energy Manager Civil/Struct. Engr A.Raphael [M] Elect. Engineer D. Danseglio [M] Sr Mech. Engr. C. Channing [M] ECS Design Supervisor J. Mills [M] Design Phase CM LiRo/Gilbane N. Heyman [C] Chilled Water Fac. Design A/E Giffels B. Harrison [C] Project EVMS& Schedule P. Selgrad [M] Project Cost Accounting C. Retundi [M] CF Procurment Sr Administrator D. Paveglio [M] Construction Engineer CF Procurment Administrator TBD[M]2 CF Admin. Asst.

9 BROOKHAVEN SCIENCE ASSOCIATES Construction Phase Responsibility Assignment Matrix CONVENTIONAL FACILITIES OFFICECONVENTIONAL FACILITIES FIELD OFFICEPE ACTIVITYDirectorAdmin AsstAD Design Project Controls Civil Engineer Mechanical Engineer Electrical Engineer Admin AsstAD Construction Construction Engineer Civil Inspector Mechanical Inspector Electrical Inspector Plant Engineer Constructability Review Value Engineering Identify Long Lead Items Prepare Bid Packages Evaluate Proposal Set Up Field Office Document Control Track Submittals Submittal Review Track RFIs RFI Review Develop Master Schedule Establish EVM w/ GC Monitor Safety Program Establish Quality Assurance Inspection & Testing Non-conforming Work Schedule Updates Evaluate Pencil Copy Process Requisitions Engineering Change Notice Contract Change Orders As-Built Development Commissioning Punch List Close-out Documents Warrantees

10 BROOKHAVEN SCIENCE ASSOCIATES Construction Readiness Site Logistics Plan Site Access Plan Access Training BNL PE assisting with site preparation planning and removal of excess facilities BNL ESH confirmation of environmental status of site CF Assisting Plan Development Construction Safety Plan (ESH) Construction Quality Assurance Plan (PC)

11 BROOKHAVEN SCIENCE ASSOCIATES Site Logistics Plan

12 BROOKHAVEN SCIENCE ASSOCIATES Existing Site Bldg 100 Bldg 87 Bldg 210 Bldg 481 Bldg 211 Demolished 2/08 Ring Bldg Footprint Construction Area Perimeter Existing Buildings to be removed prior to construction

13 BROOKHAVEN SCIENCE ASSOCIATES Site Access Plan Current Plan Use Main Gate – Most Efficient –Existing Security –No Cost Fall Back Plan (Only if Necessary) Use of South Entrance –Additional Security –Further from Site –Additional Cost

14 BROOKHAVEN SCIENCE ASSOCIATES Access Training BNL Requirements Construction Safety Orientation Security Identification Issue Badges Screening for Foreign Nationals Additional Projects ISB – Interdisciplinary Science Building BGRR – Brookhaven Graphite Research Reactor JPSI – Joint Photon Science Institute

15 BROOKHAVEN SCIENCE ASSOCIATES Access Training Could Exceed Current Processing Capacity Existing on-site location requires escort to training office – inconvenient & time consuming Working with BNL on Two Approaches Local Off-site Store Front –Contract out Training & Issuing Badges Create Onsite Trailer Near Main Gate –Possibly Lab funded or jointly funded by multiple projects

16 BROOKHAVEN SCIENCE ASSOCIATES Path Forward Work with Procurement Team in contractor outreach to secure competitive qualified pool Continue hiring construction team staff Develop procedures and management systems Get them trained on all requirements and ready to start Finalize construction contract requirements Finalize development of Construction Management Plan and related documents Evaluate and implement Construction Document-Control software (Expedition or similar)