Technical & Development Services Group www.t-d-s.com “Provides engineering related and specialised services to the construction industry” Paul Fleming.

Slides:



Advertisements
Similar presentations
Skills in note-making, summarising and report writing Quality and Outcomes Framework Assessor Training.
Advertisements

Office of University Partnerships Office of Policy Development and Research U.S. Department of Housing and Urban Development Office of University Partnerships.
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Highway Adoption Implementation Stage Highway Adoption Implementation Stage Steve Johnson Head of Network Management.
NURSING & MIDWIFERY PROGRAMMES ELECTIVE PLACEMENTS Updated October 11.
Revenue Audits Returns processed in a “non-judgemental” manner Revenue Audit of selected returns. Objective is to promote voluntary tax compliance. Audit.
Letter of Reminder.
PRESENTATION TO THE SELECT COMMITTEE ON APPROPRIATION 19 OCTOBER 2010.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
State Aid (SALT) prepares the Federal Agreements and the Amendments for  Force Account (FA)  Right of Way (ROW)  Preliminary Engineering (PE)  Construction.
Home Letter How to charge Design fees Ajay Vaibhav Writing Letters Estimating Fee Invoicing Fees.
Part of National Energy Services Avoiding Insurance Claims Hilary Grayson Head of Surveying Services – SAVA Offering the next generation of surveyors a.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Project Close Out CTC-470.
Work Plan Development Steve Robinson Highway Utility Engineer, INDOT June 11, 2015.
PROJECT CLOSEDOWN WORKSHOP Alex Findlay Programme Manager YH GDT
ROADS AND NEW DEVELOPMENTS ADOPTION OF HIGHWAYS HARRIET TOWNSEND 2-3 GRAY’S INN SQUARE Paper prepared by Paul Shadarevian.
Improving Your Business Systems Basic PLC / SCADA Training  Programmable Logic Control  System Set-up  Planning and Preparing for Work  Component Changeout.
Proposed Code of Practice for Inspections 3 rd Edition David Capon JAG UK Manager Keith O’Brien Cable & Wireless Worldwide.
Looking to Rent a House? Kelly Smith 50 Park Place, Cathays Park Campus 2 nd Floor, Cardigan House, Heath Park Campus.
Regulating the dental sector Tracy Norton Compliance Manager (Central Region) 4 October 2012.
© 2008 Brigham Young University–Idaho 1 Controllers Group Meeting October 31, 2013.
The Value of Using the Process Approach for Internal Auditing Frank Sidorowicz TL 9000 Program Director Orion Registrar, Inc.
Road Map to a Green Tag Paperwork=Time=Money. Questionnaire If you could change any one major thing inside the Fire Community Services process what would.
Auditing Purchases, Trade Payables and Payroll
1.0 INTRODUCTION Seán Moran. SIMPLE? Commissioning is a complex issue requiring: Planning Leadership Teamwork Training Communications.
Reimbursements, Reporting & Budget Modifications
The Tax Credit Process (Once credit has been awarded) Reservation and Carryover Gross Rent Floor Election Form Commitment 10% Certification Quarterly Progress.
Tendering in Poland. INTRODUCTION Company Setup Tendering Project Delivery.
Work Plan Development Aschalew Aberra Highway Utility Engineer, INDOT November 20, 2013.
Extending your student visa. How we are going to help you Talking you through the documents you have to prepare Talking you through the online tools we.
Completing the State Aid Payment Request (SAPR). Tips Each spring check on the State Aid Finance web page for the current version of the State Aid Pay.
CIVL202 Construction Engineering I Tutorial 3 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Overview of Finance and Reporting Equality for Women Measure October 2011.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
Mock State Aid Project County Highway Accountant’s Conference 2015.
ROAD ADOPTION PROCESS TOPIC GROUP OVERVIEW OF HCC ROAD ADOPTION PROCESS DAVID HUMBY 24 TH & 25 TH FEBRUARY 2010.
Savell Bird & Axon a part of the WYG group creative minds safe hands SBA Hertfordshire County Council - Road Adoption Topic Group 26 September 2011.
HCC’s approach to road adoption Vetti Vettivelu Highways Development Control Service Manager.
City of Chicago Comptroller’s Office Voucher Audit and Tracking Unit (Revised 04/06/09) Common Problems with Delegate Agency Invoices.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Highway Utility Engineer, INDOT
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
Management of road adoption of active and historic road schemes Steve Johnson Head of Network Management.
Province of the EASTERN CAPE DEPARTMENT OF PUBLIC WORKS DOH REVITALISATION PROGRAM EASTERN CAPE PROVINCE PRESENTATION TO SELECT COMMITTEE ON APPROPRIATIONS.
Harwood Building Control Approved Inspectors Ltd
Overview of 3 rd Party Inspection Program for USTs.
Measurement and Payment
Enhanced Wireless Funding through HB 361 Shawn S. Smith Interim Ohio Coordinator.
Incorporating Road Safety Audit into Development Control Kevin Nicholson Principal Consultant.
Framework Consultants Presentation Judith Chivers Estates and Capital Developments.
ROAD INFRASTRUCTURE SAFETY MANAGEMENT DIRECTIVE (RISM) Harry Cullen SPM Road Safety, National Roads Authority, Ireland Chairman of CEDR Technical Group.
12 Automatic enrolment myths & truths This guide to automatic myths and truths contains some of the misconceptions we have come across when speaking to.
Improving Compliance with ISAs Presenters: Al Johnson & Pat Hayle.
Auto Enrolment Presenting the Product. Auto Enrolment These notes are about Presenting the Issue of the product to the client along with the services.
PTA Treasurer Ensure the unit’s financial records are audited according to the bylaws before assuming his or her duties; Ensure the filing of the unit’s.
Employment Tax Incentive (ETI) Real Case Study – Tax Free Cash What you don’t know Copyright 2015.
Administration of a FIDIC Contract - Project Control
DIRECTOR OF FINANCE/hr
Quality Workshop The Local Council Award Scheme is a great guide for good practice in our sector and a way for councils to build confidence in their.
Temporary Works Co-ordination
Municipal Net Profit Tax
Financial Management & Reporting for Local/National Civil Society Organizations Day 02, 01 November 2017.
dcsdgrantaid.com January 2018
dcsdgrantaid.com February 2019
Results of NSF Data Analytics and Other Audits
AUTHORS: JUAN GARCIA RYAN CHERRINGTON LEE McMELLON.
Presentation transcript:

Technical & Development Services Group “Provides engineering related and specialised services to the construction industry” Paul Fleming – Associate Development Director Tom Greasley – Development Engineer

Technical & Development Services works closely with Hertfordshire County Council throughout the Highway Adoption process. Our Clients in this area include:

We are responsible for Highway Adoptions on a number of sites in Hertfordshire, including: Napsbury Hospital, London Colney for Crest Nicholson Hatfield Garden Village, Hatfield for Taylor Wimpey & Rialto Homes Metropolitan Station Approach, Watford for Linden Homes

“A developers focus will be on profits from selling houses, not ensuring roads are adopted…” Increased liability Maintenance expenditure Increased costs of remedial works Bond overrun charges / Bond limits Bad public relations This is not always true. An unadopted road can leave the developer with:

Issues Developers have with Hertfordshire County Council’s (HCC) Highway Adoption Process Lack of cohesion between HCC & Mouchel Lack of inter-departmental cohesion Difficulty to achieve Technical Approval Response times Multiple inspections & work requests Amount of fees charged Safety Audits Poor reputation amongst developers

Quotes from Developers on Herts Adoptions… “It takes far too long to get technical comments, approvals and for the legal process associated with the S38 Agreements to take place. This, I believe, is the remit of Mouchel. Because this process takes far too long the developments are often complete prior to the agreements being completed and we end up with abortive works and protracted adoption periods.” “I am not the only one with gripes, especially the multiple visits and their consequences.” “We constantly get asked to pay fees without any evidence of work being carried out.” “There seems to be a lack of trust.”

Lack of cohesion between HCC & Mouchel When a developer submits drawings for Technical Approval, they have already spent a long time in working with the relevant HCC Guide for Highway Design. The drawings should be checked by HCC, returned to the developer who will make changes and re-submit for Technical Approval. Sometimes the drawings have to be submitted for approval over 5 times, when more and more changes are found. This often delays the signature of the Section 38 Agreement. Some of these changes contradict what was originally asked by HCC. A developer cannot wait for these changes and then constructs the road without the Section 38 Agreement in place.

Technical Approval When a Developer has Technical Approval, there is an agreed scheme for both parties to work to. Once the road is constructed, there should be inspections by Herts Highways to check whether the road is correct. One of the main frustrations of Developers is when Herts Highways try to differ from the approval drawings and request additional works. A Developer will rarely wish to pay for additional works, even less so if the Council is going back on an Agreement which the Developer worked so hard to get.

Issues with Fees Most Developers have the view that HCC unfairly asks for increases in fees as an income generator. A detailed breakdown of the fess is rarely provided when requested by the developer. The following items charged to developers are not uncommon: Inspecting site when no remedial works have been carried out and when the developer has not asked for an inspection. Fees for completing works the developer has already done, e.g. lining works. Inspection fees for Section 38 Agreements on completed roads being the same as if the road was not yet constructed.

Lack of inter-departmental cohesion A prime example of this issue is in street lighting. Whenever new street lighting is installed on a development, it is inspected by the Street Lighting Department at HCC. This is the last item before adoption. Despite the urgency required, inspections can often take over 4 months to be carried out. This time delay means additional remedial works appear, which Herts Highways expect the developer to pay for. The developer is not happy to pay for these works, as they are through no fault of it’s own.

Multiple Inspections It is often the case in Hertfordshire that multiple inspections of highway works for adoptions are carried out. This is usually due to personnel changes or a change in responsibility for the scheme. A developer will complete remedial works under the premise that the site will be adopted by Hertfordshire County Council. Additional works are then required which leaves the Developer feeling like the “goalposts are always moving”. This can, and often does, leave Hertfordshire with a poor reputation.

Safety Audits Once a site is constructed to the standard of HCC, in accordance with the Technically Approved drawings and has served it’s maintenance period, it should be adopted by HCC. Often, especially on S.278 Agreements, HCC carries out a Stage 3 Safety Audit on the highways. This creates another delay which slows the momentum of the adoption. The Safety Audit usually requests more remedial works to be carried out by the developer, even though the site has been constructed correctly.

Case Study – Metropolitan Station Approach, Cassiobury, Watford Initial meeting held with Herts Highways to review the adoption on 9 th October Inspection held same day. Remedial list of outstanding works agreed. Remedial works completed February 2009 and adoption requested. TDS informed in April 2009 there is no S.38 Agreement in place. Additional street lighting and highway remedial works required. Street Lighting Certificates sent to Herts Highways in May TDS constantly chased for Street Lighting Inspection, finally carried out in November 2009.

Case Study – Metropolitan Station Approach, Cassiobury, Watford Additional remedial works requested in November Herts Highways then requested a cheque for £3,000 to cover fees to cover additional inspections, checking as-built drawings and preparing the adoption certificates. Linden doesn’t wish to pay additional fees as this was not detailed when the site was first inspected with Herts Highways back in October Despite this, Linden requested invoice to pay fees in December 2009, which has still not been received from Herts Highways. Currently, the site has not been progressed through no fault of the developer.

How HCC can improve Highway Adoptions… Ensure that the Technical Approval stage is quick and efficient to allow the developer to start on site with approved drawings. Be clear on fees to be charged from the outset of the Agreement. Claim all fees at the start of the project – do not allow them to be seen as a way of income generation. Do not try to claim additional fees for minor works. Request remedial works only once. Ensure a highway or street lighting inspection is carried out 30 days from the date of the request. Take a common sense approach to progress adoptions.