Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 1 Uses of Quasi-Isochronous Helical Channels in the Front End of a Muon Collider/Neutrino.

Slides:



Advertisements
Similar presentations
1 Neutrino Factory Front End (IDS) -Chicane & Absorber David Neuffer C. Rogers, P. Snopok, C. Yoshikawa, … January 31, 2012.
Advertisements

Muons, Inc. 12/1/2009Dec 1-3, 2009 MCDW at BNL Cary Y. Yoshikawa 1 Use of a Quasi-Isochronous Helical Cooling Channel in the Front End of a Muon Collider.
FODO-based Quadrupole Cooling Channel M. Berz, D. Errede, C. Johnstone, K. Makino, Dave Neuffer, Andy Van Ginneken.
1 Optimization of baseline front end for a neutrino factory David Neuffer FNAL (August 19, 2009)
1 Neutrino Factory Front End (IDS) and Variations David Neuffer G. Prior, C. Rogers, P. Snopok, C. Yoshikawa, … August 2011 NuFACT99 -Lyon.
Muon Colliders ‘ December 2004 Optimization of adiabatic buncher and phase rotator for Muon Accelerators A.Poklonskiy (SPbSU, MSU), D.Neuffer (FNAL)
Bunched-Beam Phase Rotation- Variation and 0ptimization David Neuffer, A. Poklonskiy Fermilab.
1 Muon Bunching for a Muon Collider David Neuffer FNAL August 3, 2010.
RF Bucket Area Introduction Intense muon beams have many potential applications, including neutrino factories and muon colliders. However, muons are produced.
Longitudinal motion: The basic synchrotron equations. What is Transition ? RF systems. Motion of low & high energy particles. Acceleration. What are Adiabatic.
1 RAL + Front End Studies International Design Study David Neuffer FNAL (January 5, 2009)
1 Front End Studies and Plans David Neuffer FNAL (November 10, 2009)
1 Front End Studies- International Design Study Update David Neuffer FNAL February 2, 2010.
Μ-Capture, Energy Rotation, Cooling and High-pressure Cavities David Neuffer Fermilab.
Muons, Inc. 6/21/2011Tuesday Muon Front End Meeting Cary Y. Yoshikawa 1 Bunch Merging in the Helical Channel.
Simulated real beam into simulated MICE1 Mark Rayner CM26.
Simulation Study Results Study: Replace LiH-based cooler with gas-filled transport and rf cavities Results: Beam Cooling is significantly improved. Final.
NF Front End Meeting, April 27, 2010 Initial Cooling with HFOFO Snake Y. Alexahin, FNAL APC.
Muons, Inc. 4.27/2010IDS Front End Meeting Cary Y. Yoshikawa 1 Status of the Quasi-Isochronous Helical Channel Cary Yoshikawa Chuck Ankenbrandt Rol Johnson.
-Factory Front End Phase Rotation Optimization David Neuffer Fermilab Muons, Inc.
Helical Cooling Channel Simulation with ICOOL and G4BL K. Yonehara Muon collider meeting, Miami Dec. 13, 2004 Slide 1.
1 Front End Capture/Phase Rotation & Cooling Studies David Neuffer Cary Yoshikawa December 2008.
Feb 15, 2008S. Kahn -- RF in HCC Channel1 Examination of How to Put RF into the HCC Steve Kahn Katsuya Yonehara NFMCC Meeting Feb 15, 2008 Muons, Inc.
Institutional Logo Here Harold G. Kirk DOE Review of MAP (FNAL August 29-31, 2012)1 The Front End Harold Kirk Brookhaven National Lab August 30, 2012.
Muons within Acceleration Acceptance Cuts at End of Transverse Cooling Channel TOWARDS A GLOBAL OPTIMIZATION OF THE MUON ACCELERATOR FRONT END H. K. Sayed,
Muons, Inc. AAC Feb M. A. C. Cummings 1 Uses of the HCC Mary Anne Cummings February 4, 2009 Fermilab AAC.
1 Front End – present status David Neuffer March 31, 2015.
Mar 19, 2008 S. Kahn -- RF in HCC Channel 1 Examination of How to Put RF into the HCC Steve Kahn NFMCC Meeting Mar 19, 2008.
Source Group Bethan Dorman Paul Morris Laura Carroll Anthony Green Miriam Dowle Christopher Beach Sazlin Abdul Ghani Nicholas Torr.
The 2010 NFMCC Collaboration Meeting University of Mississippi, January 13-16, Update on Parametric-resonance Ionization Cooling (PIC) V.S. Morozov.
2002/7/02 College, London Muon Phase Rotation at PRISM FFAG Akira SATO Osaka University.
2002/7/04 College, London Beam Dynamics Studies of FFAG Akira SATO Osaka University.
Aug 9, 2008S. Kahn -- HCC Magnet Plans1 HCC Magnet Future Plans Steve Kahn Aug 9, 2008 NFMCC Friday Meeting.
Quantitative Optimisation Studies of the Muon Front-End for a Neutrino Factory S. J. Brooks, RAL, Chilton, Oxfordshire, U.K. Tracking Code Non-linearised.
Bunched-Beam Phase Rotation for a Neutrino Factory David Neuffer Fermilab.
Bunched-Beam Phase Rotation and FFAG -Factory Injection David Neuffer Fermilab.
Bunched-Beam Phase Rotation for a Neutrino Factory David Neuffer, Andreas Van Ginneken, Daniel Elvira Fermilab.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
K. McDonald NFMCC Collaboration Meeting Jan 14, The Capture Solenoid as an Emittance-Reducing Element K. McDonald Princeton U. (Jan. 14, 2010)
1 EPIC SIMULATIONS V.S. Morozov, Y.S. Derbenev Thomas Jefferson National Accelerator Facility A. Afanasev Hampton University R.P. Johnson Muons, Inc. Operated.
Muon cooling with Li lenses and high field solenoids V. Balbekov, MAP Winter Meeting 02/28-03/04, 2011 OUTLINE  Introduction: why the combination of Li.
V.Balbekov, 12/09/08 HCC simulation with wedge absorbers V. Balbekov, Fermilab Muon Collider Design Workshop December 8-12, 2008 JeffersonLab, Newport.
-Factory Front End Phase Rotation Gas-filled rf David Neuffer Fermilab Muons, Inc.
1 The 325 MHz Solution David Neuffer Fermilab January 15, 2013.
1 Front End for MAP Neutrino Factory/Collider rf considerations David Neuffer May 29, 2014.
Harold G. Kirk Brookhaven National Laboratory Progress in Quad Ring Coolers Ring Cooler Workshop UCLA March 7-8, 2002.
1 Front End – present status David Neuffer March 17, 2015.
1 International Design Study Front End & Variations David Neuffer January 2009.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
FRONTEND DESIGN & OPTIMIZATION STUDIES HISHAM KAMAL SAYED BROOKHAVEN NATIONAL LABORATORY June 26, 2014 Collaboration: J. S. Berg - X. Ding - V.B. Graves.
Bright muon sources Pavel Snopok Illinois Institute of Technology and Fermilab August 29, 2014.
1 Front End – present status David Neuffer March 3, 2015.
Institutional Logo Here July 11, 2012 Muon Accelerator Program Advisory Committee Review (FNAL July 11-13, 2012)1 The Front End.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Jorg Kewisch, Dmitri Kayran Electron Beam Transport and System specifications.
1 Muon Capture for a Muon Collider David Neuffer July 2009.
Bunched-Beam Phase Rotation - Ring Coolers? - FFAGs? David Neuffer Fermilab.
Lecture 4 Longitudinal Dynamics I Professor Emmanuel Tsesmelis Directorate Office, CERN Department of Physics, University of Oxford ACAS School for Accelerator.
Pros and Cons of Existing Cooling Schemes David Neuffer Fermilab.
MANX and Muon collider progress Katsuya Yonehara Fermi National Accelerator Lab DPF2006, Honolulu, Hawai’i October 30 th, 2006.
ELENA RF Manipulations S. Hancock. Apart from debunching before and rebunching after cooling, the principal role of the rf is to decelerate the beam and.
1 Front End – gas-filled cavities David Neuffer May 19, 2015.
1 Bunch Recombiner for a μ + μ - Collider Cooling Scenario David Neuffer FNAL (July 7, 2010)
Muons, Inc. 3/5/2012MAP Collab. Meeting at SLAC Cary Y. Yoshikawa 1 Bunch Coalescing in a Helical Channel* Cary Yoshikawa Chuck Ankenbrandt Dave Neuffer.
1 Front End – present status David Neuffer December 4, 2014.
August 8, 2007 AAC'07 K. Yonehara 1 Cooling simulations for Muon Collider and 6DMANX Katsuya Yonehara Fermilab APC MCTF.
Muons, Inc. Feb Yonehara-AAC AAC Meeting Design of the MANX experiment Katsuya Yonehara Fermilab APC February 4, 2009.
Uses of the HCC Mary Anne Cummings February 4, 2009 Fermilab AAC
David Neuffer Cary Yoshikawa March 2009
Design of the MANX experiment
Uses of the HCC Mary Anne Cummings February 4, 2009 Fermilab AAC
Presentation transcript:

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 1 Uses of Quasi-Isochronous Helical Channels in the Front End of a Muon Collider/Neutrino Factory Cary Yoshikawa Chuck Ankenbrandt Dave Neuffer Katsuya Yonehara

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 2 Evolution of the QIHC (2 snapshots) Configuration in the Phase II proposal, which was awarded and is funding current studies. Current configuration Outline Motivation Design upstream of HCC for increased acceptance Design downstream of HCC for bunch merging Design upstream of HCC for increased acceptance Design downstream of HCC for bunch merging Summary & Future

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 3 Upstream of an HCC optimized for cooling: Affords a larger RF bucket size when operating near transition for purpose of capture and bunching after the tapered solenoid. Having control over both γ T and energy of synchronous particle should enlarge phase space available for particles to be captured. The Quasi-Isochronous HC should match naturally into an HCC that is maximized for cooling (equal cooling decrements). The Quasi-Isochronous HC aims to shorten the length of the front end of a muon collider/neutrino factory by exploiting the tunable slip factor: in the following ways: Motivation Downstream of the HCC optimized for cooling : Allows recombination of bunches over a potentially shorter distance compared to other studies by utilizing a large slip factor after inducing different energies across the bunches:

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 4 Configuration in the Phase II Proposal z(m)SubsystemPurpose 0.0 to 4.5Capture/Tapered SolenoidEnhance pion/muon capture 4.5 to 24.5First straight RF Buncher in vacuum1.Initial capture of π’s & μ’s into RF buckets. 2.Allow lower momenta π’s to decay into μ’s to 44.5Second straight RF Buncher in 100 atm H2 w/ variably thick Be windows. 1.H2 gas allows higher RF gradient. 2.Be causes higher momenta π’s to interact, enhancing useful μ’s. 3.Transverse cooling to 50.0Match into HCC1.To match between straight solenoid into HCC. 2.Enhance μ capture by manipulating RF bucket size to 350HCC(Multi-Bunch)To cool string of multiple bunches of muons in 6D phase space. 350 to 360Bunch Combiner Preparation (BCP)To transform string of bunches at same energy into string at different energies with head bunches at higher energies than trailing bunches. 360 to 393Bunch Combiner (BC) To combine the multiple bunches in a single one via free drift in large | η | channel. 393 to 693HCC(Single-Bunch)To cool single bunch of muons in 6D phase space.

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 5 The rate of muons created across the transition from vacuum into the Be/H2 has increased by: ~21% (728  882) Birth of Mu-’s 2m before H2/Be 35 MV/m region P vs. z Birth of Mu-’s 2m into H2/Be 35 MV/m region P vs. z PhaseII Upstream HCC: Justification for adding H 2 /Be (z=24.5m)

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 6 Initial design was based on a reference with constant momentum (237 MeV/c) and γ T extracted in matching section via earliest arrivals over incremental longitudinal sections. Note that because κ goes from 0 to 1, the reference sees more material as it traverses the matching section and thus |sin(φs)| must increase to compensate energy loss, forcing the bucket area to decrease along z. Phase II HCC Upstream: Matching Section

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 7 (204.5, 236.3) Phase II HCC Upstream: Matching Section z = 50.0 m (End of Match) P (MeV/c) t (nsec) ~9000 μ – /100k POT

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 8 In principle, it is possible to achieve monotonic RF bucket growth by manipulating the phase φ s, γ T (via ), and field gradient. Phase II HCC Upstream: Matching Section

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 9 Phase II HCC Downstream: Bunch Recombiner Preparation Before bunches out of the HCC can be combined, the string of mono-energetic bunches must be transformed into one whose head bunches (early arrivals) are at higher energies than the tail (late arrivals), since we operate above transition. This can be achieved by using an RF at off frequency. In this case, MHz for bunches with 200 MHz spacing. ε L =0.002m/bunch cτ(m) KE(MeV) f= MHz V’ = 15 MV/m 9.6m in QIHC η =

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 10 Phase II HCC Downstream: Bunch Recombiner cτ(m) KE(MeV) Drift 32.5 m in QIHCC w/ η= 0.43 Note that these simulations are 1-D only. 3-D using g4beamline is shown later. Total length: =~43m. Compare to 340m* * R. Fernow, “Estimate of Front-End Magnetic Requirements,” NFMCC Tech. Note 529 (2008) 20-4 After synchrotron oscillations within a 200 MHz rf bucket. ~95% of the initial beam is captured within that bucket. V’ = 12 MV/m η = 0.05

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 11 Current HCC Upstream: End of 2 nd Straight Section 1.081E E E E3 Pi– & Mu– Mu– Pi+ & Mu+ Mu+

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 12 Emittances out of second straight: ε T =11 mm-rad x ε || = 378 mm-rad HCC(cooling optimized) acceptance: ε T =20 mm-rad x ε || = 40 mm-rad Need to transform a cigar shaped ε T xε ║ (11 x 378) into a football shaped one (20 x 40). p t 450 MeV/c … Current HCC Upstream: Match Want a low κ HCC that’ll have large momentum acceptance (150 MeV/c < p <450 MeV/c) that cools longitudinally. Since we will need to operate with a nearly straight solenoid, we will need to operate below transition. Desire a low κ HCC with a ptransition ~≥ 450 MeV/c. P(MeV/c) t(nsec) Pref = 225 MeV/c free drift for 45.2 m B z (on z-axis) = 2.4 T Bz(on ref) = 2.3 T B φ (on z-axis) = T db φ /dρ (on z-axis) = T

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 13 Maxing out use of wedge (60 atm case) increases longitudinal acceptance by 19% over the case without any wedge. Perhaps the matching scheme should incorporate ~30m of κ = 0.25 QIHCC with Be wedges in H2 gas at 60 atm, followed by removal of the Be wedges to achieve the lowest equilibrium emittances. H2:200 atmH2:100 atm H2:60 atm εlong (m-rad) at z = 0 m εlong (m-rad) at z = 30 m εtrans (m-rad) at z = 0 m εtrans (m-rad) at z = 30 m ε6D (m^3) at z = 0 m E E E-04 ε6D (m^3) at z = 30 m E E E-05 Lowest emittance (~equilibrium) at z=30m. Highest emittance (acceptance) at z=0. Current HCC Upstream: Wedge in Match To enhance longitudinal cooling, we studied effect of adding a cylindrical wedge. 1.H2:200 atm: No wedge, only H 2 at 200 atm at 293 K. 2.H2:100 atm: Be wedge ~1mm at reference to loose same energy as 100 atm H 2. 3.H2: 60 atm: Max Be wedge ~1.48 mm w/ H 2 at knee of breakdown. E max = 32 MV/m φ s ~14º P ref = 225 MeV/c f = MHz Bz(z-axis) = 2.4T Bz(on ref) = 2.3T

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 14 G4beamline simulation of phase rotation of bunches with 200 MHz spacing with off frequency 405 MHz. t(ns) p(GeV/c) 14 Current HCC Downstream Katsuya Yonehara bunch 1 bunch 7 bunch 13 bunch 1 bunch 7 bunch 13 f=405 MHz V’ = 10 MV/m 2.5 m in QIHC η = 0.04

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 15 Phase II HCC Downstream: Bunch Recombiner p(GeV/c t(ns) Drift 46.5 m in QIHCC w/ η= 0.72 f=200 MHz V’ = 5 MV/m in QIHC η = nsec Initial phase rotation in G4BL result in energy spreads that are larger than 1D simulation. These large energy spreads translate into large time spreads at the end of the drift region. bunch 1 bunch 7 bunch 13 t(ns) p(GeV/c

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 16 Conclusions and Future (upstream of HCC) Maxing out use of wedge (60 atm case) increases longitudinal acceptance by 19% over the case without any wedge. Perhaps the matching scheme should incorporate ~30m of κ = 0.25 QIHCC with Be wedges in H2 gas at 60 atm, followed by removal of the Be wedges to achieve the lowest equilibrium emittances. Consider use of higher RF frequencies upstream of the matching section to lower its ε L acceptance requirement  325 MHz? Perhaps the matching section is better suited to follow one that has the overall longitudinal emittance be spread across several bunches with smaller emittances, ie. Dave’s baseline FE with phase rotation. Throughout 0 < κ < 1 match, design for continual RF bucket growth by manipulating the phase φs, γ T (via ), and field gradient.

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 17 Initial 1D studies show promising results with 95% capture of muons merged into a single bunch over ~43 m. Initial 3D studies in G4BL have phase rotation resulting in energy spreads that are larger than 1D simulation, translating into larger time spreads at the end of the drift region. Phase rotation parameters to optimize: Off frequency, V’max Drift parameters to optimize: η, λ Can also consider effect of adding RF manipulation into both phase rotation (harmonics) and drift regions. Conclusions and Future (downstream of HCC)

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 18 Back up

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 19 Configuration in the Phase II Proposal z(m)SubsystemPurposePhysical DimensionsFields 0.0 to 4.5Capture/Tapered SolenoidEnhance pion/muon captureL = 4.5 m R = 7.5 cm  35 cm Bsol = 20 T  4.2 T 4.5 to 24.5First straight RF Buncher in vacuum 1.Initial capture of π’s & μ’s into RF buckets. 2.Allow lower momenta π’s to decay into μ’s. L = 20 m R = 35 cm Bsol = 4.2 T 160 RF Cavities: V’max = 5 MV/m, f= MHz φs=186°: P(μ−)=150  162 MeV/c 24.5 to 44.5 Second straight RF Buncher in 100 atm H2 w/ variably thick Be windows. 1.H2 gas allows higher RF gradient. 2.Be causes higher momenta π’s to interact, enhancing useful μ’s. 3.Transverse cooling. L = 20 m R = 35 cm Bsol = 4.2 T 160 RF Cavities: V’max = 35 MV/m, f= MHz φs=208  194°, P(μ−)=162  237 MeV/c 44.5 to 50.0 Match into HCC1.To match between straight solenoid into HCC. 2.Enhance μ capture due to transition occurring in match. L = 5.5 m (5.5 λ’s) R = 35 cm Bsol = 6.3 T  4.2 T 44 RF Cavities: V’max = 35 MV/m, f= MHz φs varied to maintain P(μ−)=237 MeV/c 50.0 to 350 HCC(Multi-Bunch)To cool string of multiple bunches of muons in 6D phase space. L = 300 m λ=1m R = 35 cm Bsol = 4.2 T V’max = 16 MV/m, f= 200,400,800 MHz 350 to 360Bunch Combiner Preparation (BCP) To transform string of bunches at same energy into string at different energies with head bunches at higher energies than trailing bunches. L = 10 m λ=1m R = 35 cm Bsol = 4.2 T V’max = 15 MV/m f= MHz for MHz spacing. 360 to 393Bunch Combiner (BC)To combine the multiple bunches in a single one via free drift in large | η | channel. L = 33 m λ=1m R = 35 cm Bsol = 4.2 T V’max = to 693HCC(Single-Bunch)To cool single bunch of muons in 6D phase space.L = 300 m λ=1m R = 35 cm Bsol = 4.2 T V’max = 16 MV/m, f= 200,400,800 MHz

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 20 5 MV/m Vacuum 35 MV/m H K Σ{variable Be windows} = λ I (π)/2

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 21 Mu+ P vs t Pi+ P vs t Mu- P vs t Pi- P vs t (204.5, 236.3) Phase II HCC Upstream: Matching Section z = 50.0 m (End of Match)

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 22 H 2, 35 MV/m Vacuum, 5 MV/m ε T (acceptance) < 20 mm MHz Current HCC Upstream: Two Straights

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 23 H 2, 35 MV/m Vacuum, 5 MV/m MHz ε L (acceptance) < 40 mm Current HCC Upstream Emittances out of second straight are 11 mm-rad transverse by 378 mm-rad longitudinal. oTransverse is fine. oLongitudinal is ~10x’s too large. Need to transform a cigar shaped ε T xε ║ (11 x 378) into a football shaped one (20 x 40).

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 24 To transform a cigar ε T xε ║ into a football, we strive to have emittance exchange from longitudinal to transverse at a rate that can be cooled transversely, netting zero emittance growth transversely and cooling longitudinally. So, we look into the following for different cooling decrement schemes in the HCC at various kappa, with particular attention to low kappa values. Transverse stability Transverse equilibrium emittance Momentum acceptance Linear extrapolation Note at low kappa, we expect less transverse/longitudinal coupling, so the hope is that the momentum acceptance mostly applies to the transverse component and the RF holds onto the muons hot longitudinally. Current HCC Upstream

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 25 Transverse stability requires: 0 < G < R 2 or equivalently 0 < G/R 2 < 1 where Current HCC Upstream

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 26 Current HCC Upstream Emittances out of second straight: ε T =11 mm-rad x ε || = 378 mm-rad HCC(cooling optimized) acceptance: ε T =20 mm-rad x ε || = 40 mm-rad Need to transform a cigar shaped ε T xε ║ (11 x 378) into a football shaped one (20 x 40). Look into cooling at low κ. stable unstable

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 27 Equal Cooling κ = 0.1 Transverse Only Cooling κ = 0.1 Equal Cooling κ = 0.2 Equal Cooling κ = 0.3 Transverse Only Cooling κ = 0.2 Transverse Only Cooling κ = 0.3

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 28 Neither equal cooling decrements nor transverse only cooling provides the desired acceptance. Prior experience with Quasi Iso HCC work suggests the following possibilities to increase acceptance. 1.Enlarging R ref as well as R aperture. Will use R ref = R aperture = 30 cm (front end baseline). Previously, used R ref = 16 cm & R aperture = 35 cm (HCC baseline). 2.Increasing B fields. Equal cooling and transverse only fix B fields, which turn out to be rather low. Quasi-Iso allows Bsol to be a degree of freedom. 3.Try to simultaneously design for p transition ≥ 450 MeV/c and p ref = 225 MeV/c. This attempt is not totally consistent. The pseudo-p transition mentioned on slides going forward effectively defines the dispersion for a muon with p=p transition on the reference orbit. But, only a muon with p=p ref will be on the reference orbit. Despite the skewed accounting scheme for the dispersion, the exercise proved useful. Recall:

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 29 P ~transition = 750 MeV/c B sol = 2 T P ~transition = 850 MeV/c B sol = 2 T P ~transition = 450 MeV/c B sol = 2 T P ~transition = 850 MeV/c B sol = 2.3 T G/R 2 = G/R 2 = 0.322

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 30 Ptransition (MeV/c)κ Bsol (T)Ď-1bd (T)bq (T/m)b2 (T)G/R2 Plow – PhighPEarliest Arrival (MeV/c) > ~500; ~isochronous >400 P ~transition = 875 MeV/c B sol = 2.4 T P ~transition = 1050 MeV/c B sol = 3.2 T

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 31 To enhance longitudinal cooling, we investigated effect of adding a wedge: 1.Baseline is the 200 atm of H2 at 293 K as studied before. (200 atm) 2.Channel contains 100 atm of H2 at 293 K plus a cylindrical Be wedge mm thick at the reference (r=30cm) between RF cavities 10 cm apart. (100 atm) Wedge has zero thickness on the z-axis and twice as thick at r=60 cm. Energy loss in Be equals that in H2. 3.Channel contains 60 atm of H2 at 293 K plus a cylindrical Be wedge mm thick at the reference (r=30cm) between RF cavities 10 cm apart. (60 atm) Wedge has zero thickness on the z-axis and twice as thick at r=60 cm. Total energy loss is same as in both cases above. H2 density is at knee of breakdown curve. Current HCC Upstream: Wedge in Match

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 32 HCC Current HCC Upstream: Wedge in Match

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 33 HCC Current HCC Upstream: Wedge in Match

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 34 Current HCC Upstream: Wedge in Match

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 35 bunched beam Phase rotationToF(ns) P(GeV) Test with 3 bunches (ToF = -30, 0, 30 ns) ν = GHz, E = 10 MV/m ¼ synchrotron oscillation at z = 2.5λ 35 Current HCC Downstream Katsuya Yonehara bunch 1 bunch 7 bunch 13 bunch 1 bunch 7 bunch 13

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 36 Phase slipping in HS magnet η = 0.72 Particles are aligned in timing at z = 49λ Note that Δt is too large to be in 200 MHz RF bucket 36 Current HCC Downstream bunched beam cont. Katsuya Yonehara bunch 1 bunch 7 bunch 13 bunch 1 bunch 7 bunch 13

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 37 Merging in isochronous HS magnet ν =0.2 GHz, E=5 MV/m η = Current HCC Downstream bunched beam cont. Katsuya Yonehara bunch 1 bunch 7 bunch 13 bunch 1 bunch 7 bunch 13 5 nsec

Muons, Inc. 3/1/2011MAP Winter Meeting at JLAB Cary Y. Yoshikawa 38 single particle ν =0.408 GHz, E=5 MV/m η =0.04 ¼ of synchrotron oscillation at z=4.2 λ Phase rotation in HS magnetPhase rotation in Bessel field magnet η = 0.72 Particles are aligned in timing at z = 33λ 8/20/1038MI, Friday meeting Current HCC Downstream Katsuya Yonehara