PHASE – I & PHASE - II.

Slides:



Advertisements
Similar presentations
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW APRIL 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State___________.
Advertisements

1Year of IncorporationYear of commissioning 2. a. Share Capital as on 31/03/12 ( R lakhs) Government Holding (%) i. Paid up Capital as on 31/03/12 ( R.
Development of Sanitary Landfill and Capping of Existing Dump site at Mysore
1 PROJECT PROFILE : Lining of TGP Canal from KM to KM (Up to Kurnool – Kadapa Border) etc. 2No. of Packages:6 (2 EPC + 4 Old Packages) 3Agreement.
ESTIMATES Mrs.Nirupma Kumar Prof. Fin & Investment.
Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
MUSURUMILLI PROJECT 15 km 35.4 km Project cost : cr
SPILLWAY ( 77 mt) 31.5 Km SEEPAPALLY VAGU RESERVOIR Right Earth Dam226 Mt Left Earth Dam 522 Mt Non EPC Package Works under progress EPC Package Works.
Pranahita – Chevella Project PHASE - II
2006 Technical Affairs Water Projects Department.
Madurai Date: 10 & 11th March 2014 STATE LEVEL NODAL AGENCY TAMIL NADU.
REVIEW ON NREGS – AP BY Hon’ble Chief Minister Date
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-
No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under.
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
(POLAVARAM) (Head Works)
TADIPUDI LIFT IRRIGATION SCHEME
For Long Term Water Security SARDAR SAROVAR (NARMADA) PROJECT Sardar Sarovar Narmada Nigam Limited Dr. M.B. Joshi GM (Tech. & Coor.)
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
GNSS PROJECT (PHASE-I)
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
PULICHINTALA PROJECT NSP Reservoir Barrage Halia Musi Paleru Munneru
SUCCESS STORIES GHATGAON PANCHAYAT SAMITI Dist-KEONJHAR.
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
WEL COME PANCHAYAT SAMITI, MUNIGUDA. 1. Updation of information in the online module relating to Muster Roll, MB entry * Online entries are made on the.
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
GREATER VISAKHAPATNAM MUNICIPAL CORPORATION
WATER RESOURCES DEPARTMENT
1Year of IncorporationYear of commissioning 2. a. Share Capital as on 31/03/11 ( R lakhs) Government Holding (%) i. Paid up Capital as on 31/03/11 ( R.
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
SRI RAMA SAGAR PROJECT STAGE-II
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
INDIRA GANDHI SUPER THERMAL POWER PROJECT 3X500 MW Design, Engineering, Supply, Erection, Testing and Commissioning of Coal Handling System.
PRESENTER: K.P.REDDY B.E (Elect), F.I.E S.E (Retd.) APGENCO Associate President, Telangana Retired Engineer's Forum 1.
11th National Food Security Mission Executive Committee Meeting on Department of Agriculture Andhra Pradesh 1.
1 1 Golden Quadrilateral Golden Quadrilateral Status August † Estimated Cost Completed / 4 laned Under Implementation Award during 2002.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
Presented by Telangana Retired engineers forum 11.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
GOVERNMENT OF TELANGANA Irrigation & CAD Department
Hyderabad city water supply system
City:- Corporation of City of Panaji
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
Polavaram Irrigation Project
UGPL INITIATIVE IN SSP Sardar Sarovar (Narmada) Project, Gujarat
PPL1.6 Pumping Plant Project Overview
Polavaram Irrigation Project
Polavaram Irrigation Project
Virtual Review - #61 by Chief Minister Dt
Polavaram Irrigation Project
Polavaram Irrigation Project
#28 Site Visit of Hon’ble Chief Minister Dt. 22nd October, 2018
#79th Virtual Review by Hon’ble Chief Minister Dt. 29th October, 2018
Polavaram Irrigation Project
Presentation transcript:

PHASE – I & PHASE - II

J. CHOKKA RAO LIFT IRRIGATION (GLIS) - STAGE – I SALIENT FEATURES : 1 PROJECT PROFILE 1) Stg-I, Ph-I: Lifting 5.18 TMC of water to irrigate 1.20 Lakh Acres at Rs.844 Crores 2) Excavation of North main canal and distributaries to irrigate 31,000 Acres at Rs.48.90Crs 3) Excavation of South main canal and distributaries to irrigate 91,700 Acres at Rs. 71.20Crs 4) Stg-I, Ph-II : Lifting of 7.25 TMC of water to irrigate 2.85 Lakh Acs. 2 Administrative Sanction : G. O. Ms. No. 463 Dt: 21.3.03 for Rs. 930 Crs. G. O. Ms. No. 79 Dt: 20.9.04 for Rs. 1820 Crs. 3 No. of EPC Packages : 4 4 Agt. Value of 4 Pkgs Rs. 2851.07 Crs. 5 Budget Provision for 2006-07 (GWUA) Rs. 1240 Crs. 6 Expenditure 2004-05 Rs. 226.40 Crs. 2005-06 Rs. 902.24 Crs. TOTAL Rs. 1128.64 Crs. 7 Utilisation 12.43 TMC(St-I :Ph-I=5.18TMC+Ph-II=7.25TMC) 8 Ayacut Phase-I 1.23 Lakh Acres Phase-II 2.85 Lakh Acres Total 4.08 Lakh Acres

J. CHOKKA RAO LIFT IRRIGATION (GLIS) 9 Land Acquisition Required : 6498 acres Acquired 1433 acres Requisitioned 3056 acres 10 Forest Land 850.024 Acre GOI has accorded forest clearance. Rs.32.42Crs. Deposited to Forest Dept., 11 Est. Cost for LA Rs. 50.00 Crs. 12 Est. Cost for R & R Nil 13 Clearances All CWC clearances including investment clearance obtained Lift-I Lift Height 96.926 M 14 No. of Pumps 4 Nos. (Phase-I) Lift-II 15 69.593 M 16 Lift-III 71.481 M

J. CHOKKA RAO LIFT IRRIGATION (GLIS) - PHASE-I 16 Power required : 172.50 MW (Ph-I : 52 MW; Ph-II: 120.50MW) 17 Mobilisation Advance Paid Recovered 2004-05 48.11Crs - 2005-06 94.20Crs. 46.50Crs. TOTAL Rs.142.31 Crs. Rs.46.50 Crs. 18 Target date for completion 9/2007

J. CHOKKA RAO (GODAVARI) LIFT IRRIGATION PROJECT Stage – I (Phase-I & II) PKG No. Description Awarded Bid Amount Rs. in Crs. OC To lift 5.18 TMC of water (10 Cumecs discharge) through pipe line of 2.5 m dia for 135 KM length i.e., from Gangaram to RS Ghanapur to irrigate 1.23 acres. M/s HCC-KBL (JV) 843.97 Lifting 7.25 TMC (14 Cumecs of discharge) through pipe line of 3/2.5 m dia for a length of 200 KM to irrigate 2.85 Lakh in Jangam, RS Ghanpur & Cherial of Warangal (D) M/s HCC-NCC (JV) 1887.00 45 Under Phase-I of JCR-GLIP Excavation of North main canal Karimnagar (D) and distributary to irrigate 31,000 Acres M/s K. Sudhrashan Reddy & M/s K. Venkateshwarlu & Co.(JV) 48.90 46 Under Phase-I of JCR-GLIP : Excavation of south main canal (Warangal (D) and its distributaries to irrigate 91,700 Acres in Warangal (D). M/s k. Sudhrashan Reddy & M/s K. Venkateshwarlu & Co.(JV) 71.20 TOTAL 2851.07

PIPE LINE STATUS & LAND ACQUISITION

J. CHOKKA RAO (GODAVARI) LIFT IRRIGATION PROJECT (Stg-I, Ph-I) SALIENT FEATURES : 1 Utilisation : Phase-I 5.18 TMC 2 Ayacut New Ayacut 1.23 Lakh acres Stabilisation Nil 3 Lift-I Lift Height 96.926 M No. of Pumps 4 Nos. (Phase-I) 4 Lift-II Lift Height : 69.593 M 5 Lift-III 71.481 M 6 Power required 52 MW 7 Mobilisation Advance paid/package wise Rs. 142.31 Crs

J. CHOKKA RAO (GODAVARI) LIFT IRRIGATION PROJECT (Stg-I, Ph-I) Package No. OC : Phase-I of JCR-GLIP To lift 5.18 TMC of water (10 Cumecs discharge) through pipe line of 2.5 m dia for 135 KM length i.e., from Gangaram to RS Ghanapur to irrigate 1.23 acres. Name of the Contractor : M/s HCC-KBL (JV) Agreement Amount : Rs. 844.00 Crs. Agreement Date : 08-01-2004 Period of Completion : 18 Months(6milestones) Date of Completion : June, 2006 Investigation : Completed Designs : Approved (4 Nos. approved against 5Nos.) Pumps : 8 Nos supplied to site from Japan against 8 Nos. required. No. of pumps for each PH : 2Nos. Execution (Present Status): Pump Houses : Work in 4 Nos. of pump houses commenced against 4 Nos. proposed. Pipe line : 82.56 Kms length fabricated against 135 Kms Pipe line laying : 63 Kms completed against 135 KM Lifts : Work in all 4 Lifts commenced against 4 lifts proposed Qty. of earth work done : 3147 Lakh Cum against 11.807 Lakh Cum. Qty. of concrete : 270 cum against 50,755 Cum Expenditure : Rs. 774.22 Crs. against Rs. 844 Crs.(inc. M.A- Rs.42.10Crs.) Mob Adv. Recovered : Rs. 29.94 Crores. Land Acquisition : Required 2499 Acres, Acquired 1387 Acres Forest : i) Forest clearance obtained recently; ii) Rs.32.42Crs. Payment made to Forest Dept. iii) Work in progress in 14Kms length of pipe line in forest

J. CHOKKA RAO LIFT IRRIGATION (GLIS) - STAGE-I, PHASE-II SALIENT FEATURES : 1 PROJECT PROFILE Lifting 7.25 TMC (14 Cumecs of discharge) through pipe line of 3/2.5 m dia for a length of 200 KM to irrigate 2.85 Lakh in Jangam, RS Ghanpur & Cherial of Warangal (D) 2 Administrative Sanction : G. O. Ms. No. 79 Dt: 20-9-04 for Rs.1820 Crs. 3 Agt. Value of 1 Pkg. Rs. 1887 Crs. 4 Budget Provision for 2006-07 (GWUA) Rs. 1240 Crs. 5 Expenditure 2004-05 Rs. 249.18 Crs. 2005-06 Rs. 343.88 Crs. TOTAL Rs. 593.06 Crs. 6 Utilisation 7.25 TMC 7 Ayacut 2.85 Lakh acres

J. CHOKKA RAO (GODAVARI) LIFT IRRIGATION PROJECT Package No. OC : Phase-II of JCR-GLIP Lifting 7.25 TMC (14 Cumecs of discharge) through pipe line of 3/2.5 m dia for a length of 200 KM to irrigate 2.85 Lakh in Jangam, RS Ghanpur & Cherial of Warangal (D) Name of the Contractor : M/s HCC-NCC (JV) Agreement Amount : Rs. 1887.00 Crs. Agreement Date : 04-04-2005 Period of Completion : 30 Months(10milestones) Date of completion : 9/2007 Investigation : 200Km in progress against 220 KM Completed Designs : Structures in 160 Km approved against 220 KM length Earthwork : Against 5.85 Lakh Cum. 0.18 Lakh Cum Execution : 28 Nos. of structures completed out of 350 Nos. proposed : Excavation in progress in 11Km length against total length of 220 KM Earth work : 0.18 Lakh Cum against 5.85 Lakh Cum. Pipes : 1397 Nos. manufactured. 7.50Km laying of pipes is completed against 220 Kms Expenditure : Rs.343.88 Crores against Rs.1887.00Crs. Mob. Adv. Paid(2005-06) : Rs.94.20 Crs. Mob. Adv. Recovered( 2005-06) : Rs.16.56Crs. Land Acquisition: Required: 2,600 Acres; Acquired: 33 Acres

J. CHOKKA RAO (GODAVARI) LIFT IRRIGATION PROJECT (Phase-I) Package No. 45 : Under Phase-I of JCR-GLIP Excavation of North main canal (31.60Kms) (Karimnagar (D) and distributary (138.40Kms) to irrigate 31,000 Acres Name of the Contractor : M/s K. Sudhrashan Reddy & M/s K.Venkateshwarlu&Co.(JV) Agreement Amount : Rs. 48.90 Crs. Agreement Date : 16-03-2005 Period of Completion : 30 Months(10milestones) Date of completion : 9/2007 Investigation (Canal & Distributaries) : 130 Kms completed against 170Kms Designs (Canal & Distributaries) : 92 Kms approved against 170 Kms Execution : In progress Qty. of earth work done : 3.45 Lakh Cum against 34.624 Lakh Cum. Expenditure : Rs. 6.15 Crs. against Rs. 48.90 Crs. (including Mob. Adv. Of Rs. 2.445 Crores)

J. CHOKKA RAO (GODAVARI) LIFT IRRIGATION PROJECT (Phase-I) Name of the Contractor : M/s k. Sudhrashan Reddy & M/s K. Venkateshwarlu & Co.(JV) Agreement Amount : Rs. 71.20 Crs. Agreement Date : 17-03-2005 Period of Completion : 30 Months(10milestones) Date of completion : 9/2007 Package No. 46 : Under Phase-I of JCR-GLIP : Excavation of south main canal (19Kms) (Warangal (D) and its distributaries (229Kms) to irrigate 91,700 Acres in Warangal (D). Investigation (Canal & Distributaries) : 172 Km completed against 248 KM Designs : 36 Km approved against 248 KM Expenditure : Rs. 4.39 Crs. against Rs. 71.20 Crs. (including Mob. Adv. Of Rs.3.56 Crores)