DT Hardware Status and Monitoring A.Benvenuti INFN Bologna Muon Barrel Workshop 28/09/2010.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Winter shutdown 08/09 Summary of HV interventions Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009.
Year End Technical Stop DT work Mu Barrel Workshop 13 October 2011 A. Benvenuti (INFN Bologna)
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
A3016 and MAO test at CAEN Pigi, A. Boaino & CAEN.
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Settings & Adjustments. Settings & Adjustments.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.
Web Based Monitoring DT online shifter tutorial Jesús Puerta-Pelayo CIEMAT Muon_Barrel_Workshop_07/July/10.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
LV and HV status of the RPC system RPC detector and trigger group.
Low Voltage LB status RPC detector and trigger group.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 DT critical items status: HVBoards Control and Trigger Boards Assembly in Torino fgasparini june 2004.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
Muon Tracking Meeting SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
D. Piccolo Barrel RPC Cable procurement, installation Davide Piccolo INFN Napoli.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
8-May-2010 LV Workshop1 Alignment LV: quick’n dirty HW review Alignment uses CAEN low voltage –No HV –Low power consumption electronics: under kW.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Power consumption (Watts) LBB27 ROS18 TSC50 TIM8 1 SC crate416 Alignment20 TOTAL per rack906~1 kW X2J22X2J02 With a water flow of 10 l/min, it should.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
Operation of CSC DCS Ryan Carroll Carnegie Mellon 29-Sept-2009.
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
ATLAS MDT HV – LV Detector Control System (DCS)
Tracker cooling loop “check out” draft for discussion
DT Infrastructure: LV, HV, Gas
LPI Moscow, K. Zhukov, MEPhI-LPI Moscow, V. Kantserov
RPC Detector Control System
Track Finder Crate, Backplane and Parts
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Presentation transcript:

DT Hardware Status and Monitoring A.Benvenuti INFN Bologna Muon Barrel Workshop 28/09/2010

A few items: High Voltage Low Voltage (connectors) Gas Analysis VDCs Monitoring/Alarms UX Maintenance Plans (Long Term) Out of ISR

HV Problems Summary  No New Problems since the end of February but, old YB+1 MB3 S07 came back  The last “real” HV trip (YB+1 MB2S08 SL1) occurred on July 19 during the Magnet ramp down

Problems Turning HV ON from OFF State During HV ON with warm ramp on 31/08 the following layers tripped: 1) YB+1 MB4S04 SL1 L2 w1 2) YB0 MB4 S10L SL1 L2 w1 3) YB-1 MB4 S10 SL3 L4 w1 4) YB-1 MB3 S03 SL3 L3 w1 5) YB+2 MB3 S11 SL2 L2 w0 Chambers 1 to 4 had exactly the same problem: At the first step (1200/1000/800) w1 was discharging without any current spikes in strips or cathodes. In some cases, HV spikes are seen for w1. The program attempts to bring the layers back to STANDBY values (1900/1800/1200). Note that no current spikes are seen in w1 once the STANDBY values are reached. The spikes seem to be due to a regulation problem in the A877. Similar behavior was seen in the past for: YB+1 MB4S04 SL1 L2 w1 on 26/02, 05/03 and 08/04 YB-1 MB4 S10 SL3 L4 w1 on 22/01 YB-1 MB3 S03 SL3 L3 w1 on 05/03 YB-1 MB4S10

Problems Turning HV ON from OFF State YB+2 MB3 S11 SL2 L2 got stuck with w0 in Over Current at the first step (1200/1000/800) with w0 current spikes without any spikes in strips or cathodes. The layer went up to nominal values without problems by lowering w0 to 900V and bringing w1, strips and cathodes to 2000/1800/1200. After that, no current spikes were seen in w0. Apparently, this channel does not regulate properly when the strips and wires are at “low” values. This problem was already seen on 05/03 and is reproducible (done before exchanging the A877)  But it cannot be reproduced in B904 (Marina)  Wait to replace the other modules until the T.stop  Borsato and Marina to setup a meeting with CAEN YB+2 MB3 S11 SL2

A876 Problems: wire-Strip discharges in all layers and SL in YB0 MB2 S06 and YB+1 MB3S10  Not reproduced in B904 Cathodes discharges in all layers and SL in YB+2 MB3S09 and in YB+2 MB3S04 (both July) A877 Problems: Apart for the new problem during HV ON from OFF a few modules had regulation problems In total 3 A877 were replaced since the June CMS week  In addition one A877, fresh from repair, was used in UX but it had another “feature” YB+2 MB3S04YB+1 MB3S10

A3100 Power Distribution Measurements of the current distribution from the A3100 to the SC crates done in July showed large anomalies for YB0 Top and to a less extent for YB+1 Bottom. During the Technical stop at the end of August, Cristina identified the source of the problem in the Powerclaw connectors at the TIMBUS in the SC crates backplane. The Cure (Cristina, Davide, Ignacio) all PP75 connectors inside the crates were re-crimped following the same procedures as done in January and strain relieved. the contacts were cleaned and the powerclaw rotated 180° to improve the contact surface lubricant was applied to the surfaces to minimize fretting  The power distribution is now quite uniform across all SC crates  as a test, the lubricant was also applied to all powerclaw connectors in YB0

A3009 MC Vcc Connection Problem Spotted by Ignacio:  Checked during UX access yesterday: Temperature = 36.7 °C Crimps OK (impossible to crimp with B ON) lot of dust around the connectors Vcon normal after re-inserting connectors and blocking with cable tie wedge  yet another flakey contact

Vcon Saga “Official” list of known and “under watch” cases Found at 42°C, Nothing unusual OK after usual plug-unplug fix MC switched OFF due to Vcon Occurred twice, second time after lubricant YB0 is unusually prone to Vcon problems Replacement of A3100 Power claw connectors with lugs has been postponed: No problems observed Ugly solution (only one Output)  Not yet at the end of the story

All Wheels Gas System Good Performance, essentially no downtime Some improvements on gas analysis system Still some vagaries to be followed up  Loss of ~ 1120 liters/hour (should be ~400)  Flow equalization  Gas Purity (CO 2 ) Online gas chromatograph to be operational before the end of the year From our side:  Progress on PADC monitoring/upkeep (Daniel T.)  Decision on DT operation at Absolute Pressure

YB-1  Good stability since May, apart for a problem with calibrations in July/August (not shown)  Plots identify chambers with higher O 2 contamination, not necessarily in the chambers  Overall O 2 increase on 20/09 attributed to a CO 2 change, higher purity to be used in the future (RG)  Overall O 2 increase for YB-2 on 06/09 due to a bad cell calibration  Similar results for the other wheels

YB+1

Good stability of O 2 content The 20ppm increase in 20/09 is attributed to the CO2 delivery Note the O 2 increase in YB-2 due to a problem with the analysis cell

YB-1 Large spread in YB-2 Analysis cells were recalibrated by the manufacturer in August Later measurements are more uniform YB+1 has a lower H 2 O content than remaining YB

YB+1

As a summary:  Some progress in the Gas Analysis racks performance  We have a list of the chambers with largest O2 contents  It would be interesting to check the drift velocity for YB0 MB1S02 from the data  Real progress only after the integration of the online gas chromatograph and corresponding H 2 O content

VDC (in a nutshell) A troubled life Reference Mixture Common Supply But some hope for the future  Thanks to Daniel and Lars for tending several VDCs through HV problems, supply failures, PC changes…….. Taken at face value, there is ~2.5% difference in the Supply/reference Vdrift N 2 contamination in supply line should be checked with gas chromatograph (done/ongoing) At present N 2 level is not monitored, stabilized by fresh mix in supply line  For the first time, we have a delivery date for the VDC system (thanks Hans): January Lot of work still to be done: DCS system UG infrastructures…..

Unified Temperature Alarms, Displays (and more)  Luca Ciano has set alarms thresholds on the extensive collection of thermal sensors that Franco installed on: - Thermal screens - MC Cooling manifolds - Sector 4 and 10 chambers (HV and Front-end side) - Sector Collector crates - LV Sector Collector cables Alarms (sms + s) are sent to the usual suspects when temperature exceeds threshold by 1, 2 and 3°C Note: Menu at right hand corner visible ONLY when touched with the mouse

 Time histories are available from “Temps” (inline) and “Plotgen” (background) Page : 1)Thermal screens and LV cables 2) MC Cooling manifolds 3)Sector Collector crates and S04 S10 chambers HV side 4)Sector 4 and 10 chambers Front- end side

 plus other functionalities requested by additional customers….. and a multitude of options in

New DCS Features Added by Marina G. Percentage of Active Detector Sector Collector and DTTF, DDU Crates Monitoring

Martin Gastal TIG Meting Medium and Long Term Planning We were asked to provide a list of the maintenance activities for the foreseeable future I provided Martin with the list of known DT problems Anton has given the list for the RPC

A Snapshot of DT and RPC (Barrel) Maintenance Work (as of today)  Thanks to Cristina and Gianni for providing the list for the MC maintenance. Only work requiring access to the detector is entered in the table Only RPC maintenance that requires moving the chambers is included Mistakes are possible but this is not the last version

The Present Plan as Enshrined in TCM, TIG and TECOPA Meetings It is 25m x 18m (wall to wall) for the Muon Community we asked for 15m x 12m (but space is needed to move the chambers )  Recommended reading: “ The new tenant” a play by Eugene Ionesco

As usual, I did not date this but it goes back to January 2008

That’s all folks ….