Birmingham Update Module bonding (Sam and Simon) Great difficulty bonding on to patterned glass ASICs. (OK on sensor). After 1 st two rows of bonds, abandon.

Slides:



Advertisements
Similar presentations
ChooseIT and SetIT up An introduction to purchasing your computer and installing your Desktop or Laptop.
Advertisements

Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Introduction. Introduction: Things to Prepare before Assembly Anti-static wrist strap Set of screwdrivers and pliers Piece of cloth CPU Thermal compound.
Installation of. Congratulations for choose this GSM car alarm system for your car. Taking a few minutes to watch this Installation Guide and read the.
JED Microprocessors Pty Ltd Presenting the JED T430 low-cost Projector Controllers Nov 22nd, 2009.
Z x 725 Sensor Mark 140 x Sensor Coordinates Bump Bond Pad Ø = 12/ FE PAD#2 110 x 210 LM Structure FE Chip Coordinates Bump.
Basic fill color R 100 G 160 B 200 Accent 1 ”Logo Blue” R 0 G 39 B 118 Yellow (highlight) R 252 G 217 B 0 Accent 2 R 118 G 118 B 118 OP300 Technical training.
ATLAS Module building at Glasgow
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
Installing SAS 9.3 Raymond R. Balise Health Research and Policy.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
Installing SAS 9.3 TS1M1 Raymond R. Balise Health Research and Policy.
2 May 2013 Juergen Thomas: ATLAS Tracker Upgrade Module Chip-Bonding and Test Setup 1 ATLAS Tracker Upgrade: Hybrid Wire-Bonding and Test Setup at Birmingham.
Module mounting Ian Wilmut (RAL). Martin Gibson Martin has been developing the module mounting system at RAL for the last two years – everything we have.
COMPUTER SYSTEM.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting UV Glue In November, I sent UV Glue, hybrid panel + jig to Anglo Production Process LTD –UK supplier of.
Getting started with Microsoft.NET Gadgeteer Comberton Village College Gadgeteer Club.
Hal Noakes’ Guide for Meeting Point & ViGO (Preface) BEFORE YOU START Make sure you have a SWITCHED, FULL DUPLEX ethernet connection (critical, so make.
Received new "130nm" jigs from Liverpool and after the "module workshop" 25/3/15 at Liverpool and ready to make dummy modules New jigs need to be slotted.
WP3 Meeting 21/05/ Liverpool Status: Thermo-Mechanical Hybrids Have now received a full complement of 240 Thermo-Mechanical Hybrids from Stevenage.
Guide Demo Program installation SOP ePAD SW PM. Before you start Check “Guide” version is latest ( or ) * follow next page Latest version.
A+ Guide to Software Managing, Maintaining and Troubleshooting THIRD EDITION Chapter 2 How an OS Works with Hardware and Other Software.
Setting up the Ricoh C305 Press F5 to start the Presentation
S Pyatt Dummy module with copper on glass sensor An adhesive tape has been identified that is suitable for dummy module building. This tape can be stuck.
1 WP3 Bi-Weekly Meeting Activities at Liverpool 1.Evaluation of Compact DCDC converter Designed to match up to an ABC130 module 2.Status of FIB’d hybrid/module.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
12 Aug 2013 ATLAS Tracker Upgrade Status Birmingham 1 - Small vacuum pump holding hybrid flat on panel (which it is ‘strong enough’ to do) - Since picture.
And now for something completely different First results from the DC-DC Stavelet Peter & Ashley with Giulio & John.
Preparations for Irradiation of ABCN250-Hybrid (1) 10 th August 2015, Petal/Stave Meeting Following-up on Craig’s plans for irradiation at the B’ham cyclotron:
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
21 Nov 2013 Juergen Thomas: ATLAS Tracker Upgrade: Hybrid Production and Test Setup at Birmingham 1 ATLAS Tracker Upgrade: Hybrid Production and Tests.
1 Stave 0 and QA plan UniGe-UniBe meeting, February 10 th 2012 D. Ferrère, A. La Rossa, Y Takubo.
July 7/ SPC Tutorial 1 Washington WASHINGTON UNIVERSITY IN ST LOUIS A Smart Port Card Tutorial --- Distribution John DeHart Washington University.
Zian Zhu The Tension/Pitch Machine Status and Anode Panel Measurements The Strip Capacitance Meter Status and Measurements Production Readiness Review.
Petalet-Stavelet; 13 July Birmingham Update Gluing to mechanical sensor with Epolite (as reported earlier). 1 st hybrid – too much glue on stencil.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
WP3_Bham; 10July 2014; John Wilson1 Gluing: more investigations (Simon and Sam) New clamping method provides a good base for systematic studies. Sketch.
Birmingham update: making modules? ASICS to hybrid Gluing: many trials i) heated plate with silver loaded (8 hybrids i.e. 1 panel per day) ii) UV cured.
ATLAS UK Tracker Upgrade AIDA-2020 Transnational Access Facility
Update from Birmingham Phil Allport, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John.
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
Gluing trials continuing: Loctite is favourite (for Dispensemaster) Bonding: exercising the machine; practising in laying down patterns (Simon and.
Andy Blue Glasgow Update. Andy Blue WP3 Strip Meeting Environmental Chamber Installed into cleanroom –Working on controlling scans via Ethernet connection.
WP3; 15 Jan 2015; John Wilson.1 Birmingham Update All back and operational after Christmas! Simon in contact with Dario Ariza at DESY re gluing (Boron.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting, 9 th November Phil Allport, Matt Baca, Daniel Briglin, James.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Birmingham Status ASIC shear tests (250nm Panel with hybrids cured at room temp and with heated plate, sent to Berlin for shear testing. (Complication:
TM Module Measurements (1) 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October Phil Allport, Matt Baca, Daniel Briglin, James.
Status report Pillar-1: Technology. The “Helmholtz-Cube” Vertically Integrated Detector Technology Replace standard sensor with: 3D and edgeless sensors,
Andy Blue WP3 - Glasgow Update Andy Blue. WP3 Meeting Update Module Building –2 nd Module (FZ1) wire bonded last week –Tested on Mon –Re-works yesterday/today.
How to check the ICREON working in Win ICREON.
Bluetooth To RS-232 –One To One MACHINE PC One to one - plug and play, do not modify program Bluetooth -masterBluetooth -slave.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
Computer System Laboratory
→ need to guide UV light into gap; also beware temp effects
Glue curing studies (contd)
+ Steve Worm (since Monday)
ITK Strip Module Meeting; 12st October 2015
22/06/2016 Andy Blue & Maeve Conway (Ohio State)
ATLAS Upgrade Module Bonding Trials Using Glass Asics
HIC Assembly - Liverpool
ATLAS ITK WP3 WP3 Bi-weekly meeting
Group meeting, 2nd Sept, 2013; JAW
Update from Birmingham
Quick Start Guide   Installation GM Pro 7.4 5/10/2019.
Presentation transcript:

Birmingham Update Module bonding (Sam and Simon) Great difficulty bonding on to patterned glass ASICs. (OK on sensor). After 1 st two rows of bonds, abandon ship. i)batch to batch variations? Storage problem? Surface contamination? ii)check bonder settings. Difficult to determine source + history of ASDICS (in waffle packs) On 2nd hybrid, patterned glass ASICs cleaned with alcohol. Back to basics with bonder settings; test on 2 nd hybrid 1st two rows used to test/set up; rows 3+ 4 bonded well. With same settings, return to attempt rows 3 and 4 of “bad” 1 st hybrid Again very poor results on first ASIC Try to clean other ASICs, then repeat. WP3,.16 July 2015.

Atlys+ABCN250-Hybrid at B'ham (1) (Juergen, AndyC, SimonH) John Wilson, Phil Allport, Simon Pyatt, Sam Edwards, Juergen Thomas, James Broughton, Kostas Nikolopoulos, Andy Chisholm, Simon Head 16 th July 2015, WP3 Meeting Now updated s/w on clean-room PC: We should be ok now ! -NMASK (sawtooth) works for whole hybrid (Birmingham-assembled Stave09, ‘B1_H6’) (see screenshot from 'ScanData') -Can do 'StrobeDelay(0.25) then 3PointGain(1fC)' test with all 20 chips ok (results on next slides) (Note: On Monday, we showed setup with second PC, outside clean-room, Liverpool hybrid ‘L1’, there can access one row with NMASK (10 chips) and run tests with 9 chips. One only partially responding chip (row 0 chip 6) marked by Liverpool)

Atlys+ABCN250-Hybrid at B'ham (2) (Juergen, AndyC, SimonH) John Wilson, Phil Allport, Simon Pyatt, Sam Edwards, Juergen Thomas, James Broughton, Kostas Nikolopoulos, Andy Chisholm, Simon Head 16 th July 2015, WP3 Meeting Main changes since last time: 1)Updated ITSDAQ s/w version to r3315 (built in MS VisualStudio10 Pro/Express) 2)Atlys ethernet connection: Clean-room PC has 2-ethernet PCI card fitted (one to HSIO, one to Atlys). Other PC changed to USB3.0-Ethernet dongle ('StarTech USB31000S‘, tip from RichardT), before was 2nd ethernet plug on PC mainboard. 3)No LVDS driver board 4)Short (15-30cm) cables used (some fitted with 3M connectors) 5)Always run ‘NoBCCSetup’ 6)Atlys f/w has been for a while the recommended: va056

Atlys+ABCN250-Hybrid at B'ham (3) (Juergen, AndyC, SimonH) John Wilson, Phil Allport, Simon Pyatt, Sam Edwards, Juergen Thomas, James Broughton, Kostas Nikolopoulos, Andy Chisholm, Simon Head 16 th July 2015, WP3 Meeting  Should be all-good with clean-room test system  Could run ABC130 hybrid when they become available (only 2 chips needed initially ?)  Second PC (outside clean-room, can access one row on L’pool hybrid): For testing s/w developments: 'Install very latest ITSDAQ version ('trunk') direct from SVN' What happens with the s/w in Windows 10 (ie after OS support end for Win7) ? No worries about second row of chips (broken wire ?) Also: back-up machine.  Some notes written during set-up, trying to prepare a Twiki page

ASICs Plain glass = 198; Patterned glass = 13 Glue UV : all sent to Glasgow Traduct (ASIC/hybrid) = 9 Epolite (Hybrid/Sensor) = 7 (+1 in freezer currently being reused) Sensors Plain glass = 7 Mechanicals = 1 Hybrids Brown (12 over 2 panels; 7 RH sided + 5 left hand sided); Green (2 full; one is the standard calibration measure – so not usable?) ASIC boxes : 21 empty. Stocktaking