14 Aug. 2008John Huth Harvard DOE Review Introduction: Harvard ATLAS Group John Huth.

Slides:



Advertisements
Similar presentations
Yasmine Amhis EPFL Yasmine Amhis EPFL Status of the LHC and LHCb Adrenaline.
Advertisements

Muon Data Quality and Performance A. Belloni - G. Zevi Della Porta for the ATLAS Harvard Group DOE Site Visit
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Luminosity measurments roadmap for luminosity determinations relative luminosity monitors luminosity from machine parameters luminosity from physics processes.
LHCC 3rd June 2015 Mike Lamont for the LHC team
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
LHC status and commissioning plans. LHC in 4 slides Lest we forget Progress to date Present schedules Consequent plan for 2008.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
APS Meeting April 5-8, 2003 at Philadelphia Chunhui Luo 1 Chunhui Luo Inclusive J/ψ Production at DØ.
The Large Hadron Collider at CERN: Entering a new era in unravelling the mystery of matter, space and time Tsinghua, Beijing April 2009 Felicitas Pauss.
Nick Hadley Run II Physics (I) Nick Hadley The University of Maryland New Perspectives 2000 Fermilab - June 28, 2000.
1 Luminosity monitor and LHC operation H. Burkhardt AB/ABP, TAN integration workshop, 10/3/2006 Thanks for discussions and input from Enrico Bravin, Ralph.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Fermilab User Facility US-CMS User Facility and Regional Center at Fermilab Matthias Kasemann FNAL.
LHC Computing Review - Resources ATLAS Resource Issues John Huth Harvard University.
14 Aug 08DOE Review John Huth ATLAS Computing at Harvard John Huth.
The Muon Spectrometer Commissioning and Upgrades Joao Guimaraes da Costa for the ATLAS Harvard Group DOE Site Visit
Stefano Redaelli Beam Department - Operations Group Operational Aspects of the Phase II Crab Cavity System LHC-CC09 3 rd LHC Crab Cavity Workshop European.
1 c. mills (Harvard U.) 20 September, 2010 W and Z Physics at ATLAS Corrinne Mills Harvard DOE Site Visit 20 September 2010.
Expectations of the first 2 years of LHC operations A.Rozanov ITEP Winter School of Physics February Outline LHC Experiments SM physics Higgs SUSY.
Michel Della Negra/Karlsruhe May PbWO4 Crystals: Energy Resolution  m /m = 0.5 [  E1 /E 1   E2 /E 2  cot(  /2)  ] H   Simulation (100.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
Luca Spogli Università Roma Tre & INFN Roma Tre
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
TGC-electronics commissioning before beam collision Y. Sugaya Osaka-U アトラス総会2004 12/23 河口湖.
P. 1K. Eggert – Early TOTEM Running with the  * =90m Optics Karsten Eggert on behalf of the TOTEM Collaboration Politecnico di Bari and Sezione INFN Bari,
ATLAS Trigger Development
First CMS Results with LHC Beam
Monitoring Muons; Physics 2: top,di-boson,SUSY,Dark Matter Melissa Franklin DOE Review 2009.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
Performance of the ATLAS Trigger with Proton Collisions at the LHC John Baines (RAL) for the ATLAS Collaboration 1.
M. Gilchriese LHC Startup Luminosity Planning July 29, 2005.
1 Experimental Particle Physics PHYS6011 Fergus Wilson, RAL 1.Introduction & Accelerators 2.Particle Interactions and Detectors (2) 3.Collider Experiments.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
P.F.Ermolov SVD-2 status and experimental program VHMP 16 April 2005 SVD-2 status and experimental program 1.SVD history 2.SVD-2 setup 3.Experiment characteristics.
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
DOE REVIEW AUGUST 2006: CDF GROUP AT HARVARD MELISSA FRANKLIN - PROF JOAO GUIMARAES DA COSTA---PROF 25% SEBASTIAN GRINSTEIN - POST-DOC DANIEL SHERMAN -
Marcel Vreeswijk (Nikhef/UvA-IoP) First Results of ATLAS at the LHC -- The rediscovery of the Standard Model-- Contents: Intro: The Standard Model Elementairy.
ATLAS Group Introduction + TriggerMasahiro Morii20’ Muon Spectrometer + Upgrades João Guimarães da Costa25’ Cosmic Ray AnalysisAlberto Belloni20’ Physics.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Grid technologies for large-scale projects N. S. Astakhov, A. S. Baginyan, S. D. Belov, A. G. Dolbilov, A. O. Golunov, I. N. Gorbunov, N. I. Gromova, I.
Joint LHC Machine-Experiments Workshop on Very Forward Detectors Summary D. Macina (CERN) Joint LHC Machine-Experiment Worshop on the Luminosity Monitoring.
Accelerator system Activity 1 Activity 2 Activity n LTC Dec 14 th 05 : LHC commissioning organisation Machine Coordinator Weekly responsibility 3 needed.
14 Aug. 08DOE Review John Huth Future Harvard ATLAS Plans John Huth.
First collisions in LHC
FCC-ee Interaction Region design
Luminosity monitor and LHC operation
LHC Science Goals & Objectives
MPI-ATL Calor Meeting 7-Sep-2009 H. Oberlack MPI für Physik, Munich
LHC schedule.
Integration and alignment of ATLAS SCT
Kevin Burkett Harvard University June 12, 2001
Status of the BLHC ….work in progress! Mike Lamont CERN/AB 18/01/2008
LHC Collisions.
Machine plans - Alignment workshop
Harvard ATLAS CERN LHC A general purpose detector designed to study proton-proton collisions at the CERN Large Hadron Collider (LHC) in Geneva,
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
Preparation of the CLAS12 First Experiment Status and Time-Line
Monitoring Muons; Physics 2: top,di-boson,SUSY,Dark Matter
Experimental Particle Physics PHYS6011 Putting it all together Lecture 4 6th May 2009 Fergus Wilson, RAL.
Overall commissioning strategy for protons (estd. 2005)
LHC Beam Operations Past, Present and Future
Summary Thursday h21: Stable beams fill #1303.
Experimental Particle Physics PHYS6011 Putting it all together Lecture 4 28th April 2008 Fergus Wilson. RAL.
11th Pisa meeting on advanced detectors
Experimental Particle Physics PHYS6011 Joel Goldstein, RAL
PARTICLE PHYSICS IN MALAYSIA – STATUS AND PLANS Wan Ahmad Tajuddin Wan Abdullah National Centre for Particle Physics Universiti Malaya Kuala Lumpur,
Beam commissioning plans, 2007 and 2008
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Presentation transcript:

14 Aug. 2008John Huth Harvard DOE Review Introduction: Harvard ATLAS Group John Huth

14 Aug. 2008John Huth Harvard DOE Review Outline Accelerator status and schedule Detector status and schedule Organization of Harvard ATLAS Group

14 Aug. 2008John Huth Harvard DOE Review An historic moment: Closure of the LHC beam pipe ring on 16 th June (the last piece was the one shown here in ATLAS side A)

14 Aug. 2008John Huth Harvard DOE Review Magnet cooldown status 11 Aug

14 Aug. 2008John Huth Harvard DOE Review Successful synchronization test of clockwise beam Injected for approx. 3 km Aug. 8 Counter-clockwise beams scheduled for 22 Aug

14 Aug. 2008John Huth Harvard DOE Review Accelerator Commissioning Major milestones in ’08 –10 TeV, L = 1E28 to 1E31 est –Clockwise injection 8 Aug. –Counterclockwise injection 22 Aug. –Circulating beams 10 Sept. –Colliding beams 20 October –Run till mid-Dec –Guess of integrated luminosity 1 pb -1 to tape

14 Aug. 2008John Huth Harvard DOE Review Luminosity determination in early running Ultimate accuracy estimated at 5% Source = W,Z cross sections Initial determination from beam parameters Van der Meer scans Instantaneous tracking in LUCID detectors (forward Cerenkov detectors) Estimate accuracy 15-20%

14 Aug. 2008John Huth Harvard DOE Review ATLAS Detector

14 Aug. 2008John Huth Harvard DOE Review Overall Status Magnets working, functional to full field Minor issues being worked on, solved –Shielding of LAr power supplies –Magnetic field mapping –Inner detector cooling –Trigger readout and timing Should be ready with a functional detector for first collisions

14 Aug. 2008John Huth Harvard DOE Review Harvard ATLAS History Joined 1995 –Responsible for MDT (Monitored Drift Tube) electronics design, production –Chamber construction site for endcap muon system –Development of computing model for LHC (Grids) More recently –Muon subsystem installation, commissioning, operations, reconstruction –Physics simulation –Trigger development –Magnetic field mapping –Local computing cluster –Tier 2 facility (w/ BU)

14 Aug. 2008John Huth Harvard DOE Review ATLAS Muon Subsystem

14 Aug. 2008John Huth Harvard DOE Review Personnel Faculty/Scientists –George Brandenburg (retired, consulting) –Melissa Franklin (transitioning from CDF) –Joao Guimaraes da Costa –John Huth –Masahiro Morii (transitioning from BaBar) Postdoctoral scientists –Alberto Belloni –Kevin Black –Corinne Mills –Shulamit Moed

14 Aug. 2008John Huth Harvard DOE Review Personnel (con’t) Graduate students –Lashkar Kashif (Zpt distribution) –Verena Martinez Outschoorn –Srivas Prasad –Ben Smith –Michael Kagan –Laura Jeanty –Chin Lin Wong –Giovanni Zevi Della Porta Technical support –John Oliver (EE) –Sarah Harder (Tech) –Ned Henry (Tech) –Suvendra Dutta (sys-admin) –Steve Sansone (Tech)

14 Aug. 2008John Huth Harvard DOE Review ATLAS Positions Kevin Black – Convener of inclusive lepton subgroup, Muon Commissioning Software Coordinator Alberto Belloni – Muon DAQ Coordinator Joao Guimares – Muon Management Group

14 Aug. 2008John Huth Harvard DOE Review Planned Activities in 09 Muon subsystem commissioning and operations Muon DAQ and online monitoring Muon reconstruction software Physics analysis (Z pt distribution, W’, Z’; top; BSM), participation in “Full Dress Rehearsal” (FDR) Tier 2 Center w/ Boston U Local computing cluster (4096 nodes, 1 PB disk) High-level trigger core software Magnetic field studies

14 Aug. 2008John Huth Harvard DOE Review Backup Slides

14 Aug. 2008John Huth Harvard DOE Review overall commissioning strategy for protons Hardware commissioning Machine checkout Beam commissioning 43 bunch operation 75ns ops 25ns ops I Install Phase II and MKB 25ns ops II Stage A BC No beamBeam D A.Pilot physics run First collisions First collisions 43 bunches, no crossing angle, no squeeze, moderate intensities 43 bunches, no crossing angle, no squeeze, moderate intensities Displace bunches to optimise collisions in the 4 experiments Displace bunches to optimise collisions in the 4 experiments Push performance Push performance Performance limit few cm -2 s -1 (event pileup) Performance limit few cm -2 s -1 (event pileup) B.75ns operation Establish multi-bunch operation, moderate intensities Establish multi-bunch operation, moderate intensities Relaxed machine parameters (squeeze and crossing angle) Relaxed machine parameters (squeeze and crossing angle) Push squeeze and crossing angle Push squeeze and crossing angle Performance limit cm -2 s -1 (event pileup) Performance limit cm -2 s -1 (event pileup) C.25ns operation I Nominal crossing angle Nominal crossing angle Push squeeze Push squeeze Increase intensity to 50% nominal Increase intensity to 50% nominal Performance limit cm -2 s -1 Performance limit cm -2 s -1 D.25ns operation II Push towards nominal performance Push towards nominal performance Courtesy Roger Bailey

14 Aug. 2008John Huth Harvard DOE Review strategy for 2008 and 2009 Hardware commissioning To 5TeV 2008 Machine checkout Beam commissioning 5TeV 43/156 bunch operation Train to 7TeV BC No beamBeam Train to 7TeV Machine checkout Beam Setup 75ns ops25ns ops IShutdown 2009 No beamBeam A Courtesy Roger Bailey

14 Aug. 2008John Huth Harvard DOE Review stage A: 5TeV collisions Approx 30 days of beam to establish first collisions Approx 2 months elapsed –Given optimistic machine availability –Un-squeezed –Low intensity Continue commissioning thereafter –Increased intensity –Squeeze Parameters Rates in 1 and 5 kbkbkbkbN  * 1,5 (m)Luminosity (cm -2 s -1 ) Events/crossing 1 (3) << << << << Courtesy Roger Bailey