Research Composting Operations Regulatory Process Challenges September 2007 Carolyn Hawkins, Humboldt County LEA 707-268-2224.

Slides:



Advertisements
Similar presentations
METAL FURNITURE SURFACE COATING MACT COMPLIANCE ASSURANCE
Advertisements

METAL COIL SURFACE COATING MACT FACILITY INSPECTIONS 40 CFR PART 63, SUBPART SSSS May, CFR PART 63, SUBPART SSSS May, 2006.
Publication of Final Regulations for Liquidation and Debt Collection Activities Initially published in Federal Register as proposed rules on 11/3/05 Published.
1 B.C. Government’s Ministry of Environment Waste Authorizations for Slaughter and Poultry Processing Facilities September 23, 2006 Slaughter & Poultry.
Food Waste Composting Legislation Jen Walling Office of State Senator Heather Steans 7 th District.
1 Impact of Non-Hazardous Secondary Materials Rule 2012 Annual ARIPPA Tech Convention August 22, 2012 Presented by: John Slade, Senior Consultant, All4.
Module 5 Duties and Responsibilities
Guidance Note Work Health & Safety Obligations for Independent Contractors March 2015.
SECURITY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS IN THE UNITED STATES.
RIVER RANCH ORGANICS AN ENFORCEMENT ODYSSEY. Parvaneh Byrth Riverside County LEA Phone:
International Civil Aviation Organization Regional Cooperation in the Southern African Development Community (SADC) Cliff Elbl CTA/Project Coordinator.
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
Licensing of Nuclear Power Plants in Pakistan
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Child Protection Policies Training Prepared by: SUNY Office of General Counsel SUNY Compliance Office 2015.
CBER Managed Review Process Sheryl A. Kochman Deputy Director, DBA, OBRR, CBER September 15, 2009.
1 Susan Weigert, Project Officer GSEGs Overview of GSEG Management.
Permit Implementation Regulations (AB 1497) Package Update Key Issues 1. Significant Change and Modified Permit Process 2. Public Noticing and Hearing.
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
Barriers to C&D Reuse & Recycling Survey Results & Findings.
RESEARCH DESIGN.
Appendix 8.1 – Waste Management Plan Oil Spill Contingency Plan – Land Document Number: KOC.SA.020 Incident Name: Incident Date/Time: Incident Location:
“Study on Other States’ Regulatory Oversight of Waste and Material Handling Activities Relative to Recycling Centers, Transfer Stations, and Green Material.
Chapter F.A.C. Updates Solid Waste Program.
Construction and Demolition Inert Processing Operations Compliance First: Evaluation of Solid Waste Facilities’ State Standards Training Provided By: California.
California Venue and Event Recycling Legislation Review of AB 2176 Model Ordinance For Waste Reduction at Venues and Events.
New LEA Orientation 101 8th LEA/CIWMB Conference 2005 Anaheim, CA Presenters: Robyn Browne - Lake County LEA Bill Prinz - City of San Diego LEA.
Roadmap to a Sustainable Waste Management Future Waste Diversion Strategies in the Unincorporated Communities of Los Angeles County Throughout the Region.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON PUBLIC SERVICE AND ADMINISTRATION PUBLIC SERVICE COMMISSION 18 November 2009.
Patient Protection and Affordable Care Act March 23, 2010.
TBT 14: Permit Compliance HILLS’ ETHOS: IMPROVEMENT ENGAGEMENT PREVENTION ACCOUNTABILITY PROGRESSIVE FRONT FOOT ROLES AND RESPONSIBILITIES HWS – Toolbox.
1 2 nd Informal Workshops on Draft Revisions to the Disposal Reporting System Regulations June 24, Diamond Bar June 26, Sacramento.
SUMMARY OF INFORMAL COMMENTS Temporary Waiver of Terms Regulations May 2006.
Plastic Trash Bag Program  Report to the Legislature –Originally due October 2001 –Delayed pending results of Plastics White Paper –Report updated to.
VI. Developing a VSMP Program General Stormwater Training Workshop.
REVISED DISPOSAL REPORTING & ADJUSTMENT METHOD REGULATIONS 14 CCR Sections et. seq. 14 CCR Section CCR Section
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Meeting of Experts on National Control Plans and Annual Reports Articles of Regulation EC No 882/2004 Result of the assessment of annual reports.
Project management Topic 7 Controls. What is a control? Decision making activities – Planning – Monitor progress – Compare achievement with plan – Detect.
Module 6: Working with Secondary Data Common Measures Training Chelmsford, MA September 28, 2006.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Discussion And Request For Direction Relative To Strategic Directive 8.3 Regulation Reviews For Alternative Daily Cover And Food/Green Waste Composting.
Proposed Preliminary Statewide Full Service Partnership Classification System BASED ON STAKEHOLDER FEEDBACK THIS REPORT IS THE MENTAL HEALTH SERVICES OVERSIGHT.
California Integrated Waste Management Board 1 Consideration of Model Programs and Procedures for the Collection and Proper Disposal of Pharmaceutical.
Status Report On Staff Review Of Board Regulations For Alternative Daily Cover, Food And Green Waste Composting, Farm And Ranch Composting, Compostable.
ENVIRONMENTAL QUALITY AND PROTECTION Strategic Plan for Portfolio Committee April 2011.
Preliminary Analysis of an Evolving Issue Inert Disposal Sites and Permits Background  Definitions  Non-Traditional Facilities  LA Sites  New Information.
Discussion of Priority Activities for Next Eighteen Months Action Plans.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
1 CIWMB E-Waste Update CIWMB Working Group December 2001.
Item 21 May 11-12, 2004 CIWMB Meeting Discussion And Request For Rulemaking Direction To Formally Notice Proposed Regulations For RCRA Subtitle D Program.
22 CFR 216 & Pesticides Andrei Barannik REA/asia & OAPA.
Click to edit Master subtitle style 6/4/12 National Waste Management Strategy: Submissions to PCWEA CER obo groundWork, South Durban Community Environmental.
California’s Composting Regulations Re-defining “Food Material” Waste Compliance and Mitigation Program Department of Resources Recycling and Recovery.
APD Posting and Processing. Goals: Posting – How and Why Posting – How and Why Processing – Time Line, Steps, Agency/Operator Responsibilities Processing.
A research proposal is a document written for the purpose of obtaining funding for a research project.
DRAFT REGULATIONS ON END-OF-LIFE VEHICLES Public Consultation Waste Management Unit Malta Environment & Planning Authority (MEPA) End-of-Life Vehicles.
LEA EVALUATIONS Evaluation staff assess LEA performance to ensure LEA: 1)Provides consistent enforcement of statute and regulations. 2)Implements its.
GCP (GOOD CLINICAL PRACTISE)
Development Permit System. Development Permit System 2 Disclaimer  The information presented is provided as background information to facilitate understanding.
MRAB Chapter 210/211 Changes.
Requirements for Low-Level Radioactive Waste Minimization Plans Rich Janati, M.S., Chief Division of Nuclear Safety PA Dept. of Environmental Protection.
“For the Greater Good” Mindy Farley Chief Financial Officer
Research Reactor Decommissioning Demonstration Project (R2D2)
Flooding Walkdown Guidance
Information Seminar 04 December Venue: DEA Auditorium Sibusisiwe Hlela
United Kingdom arrangements for national registers of radioactive sources Ian Streatfield IAEA International Workshop on National Registers of Radiation.
IAEA Safety Guidance on Licensing and Oversight Activities
EPA Public Meeting Dallas, Texas May 10, 2005
Tom Wolf, Governor Patrick McDonnell, PA DEP Secretary
Presentation transcript:

Research Composting Operations Regulatory Process Challenges September 2007 Carolyn Hawkins, Humboldt County LEA

Purpose: To help others anticipate and avoid some of the pitfalls the Humboldt County LEA has experienced with research compost operation proposals

Defined: “Research Composting Operation” means a composting operation, that is operated for the purpose of gathering research information on composting. CCR T14 Section 17852(a)(34)

Section (a) - (e) (a)< 5000 cy all materials at any one time shall comply with Notification requirements (b)In vessel may >5000 cy if EA authorizes (c)Requires the operator to provide a description of the research to be performed, research objectives, methodology/protocol to be employed, data to be gathered, analysis to be performed, how requirements will be met, and projected timeframe for completion of research. (d)EA reviews Notification every two years-- includes results and conclusions drawn from research (e)Mammalian specific regs……

Research compost operations in SWIS database, September 2007: Active:7 Closed: 2 Planned:1

Two Main Challenges: 1.Many proposals do not meet definition of a research compost operation 2.Lack of research results and conclusions for review

Humboldt County Number of proffered research compost proposals:10 Number of complete Notification packages: 2 Number that actually operated: 1 Number produced results and conclusions: 0

Is it authentic compost research? Market research Transportation feasibility research Urgent waste diversion Making an event more “green” An attempt to increase one’s Groovy Status in the community A way to avoid obtaining a Compostable Materials Handling Facility Permit

To avoid struggling with “faux research”: 1.Read carefully the few regulations dealing with research compost operations 2.Review them with the proposed operator 3.Rely on the proposed operator to demonstrate clearly that her/his project meets the definition of §17852(a)(34)

To avoid struggling with “faux research”: 4.Discuss the required report contents 5.Accept only a complete Notification package 5.Inquire about data collection and research progress during routine inspections 6.Send a reminder before the results and conclusions are due for review

Ending a Research project: Use Final Report to determine whether or not research is completed. Is operation in compliance with Notification requirements? Options: Close site Continue research for another two year period Find in default of Notification