Municipal Assistance Bureau Recommended Bid Analysis Procedures June 24, 2014.

Slides:



Advertisements
Similar presentations
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Advertisements

Construction Contracting
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Fair and Reasonable Pricing
POLICY AND OVERSIGHT DIVISION (POD) February 2014 Documentation of Evaluation for Award 1.
STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER Back to Basics Office of Operations 2013 Fall Conference November 6-7 New York State Office of the State.
1. In Accordance With : 2 Highest Level Lowest Level.
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
AASHTO Subcommittee on Construction Contract Administration Section Panel on Unbalanced Bidding Procedures Jerry Yakowenko (FHWA Headquarters) Dean Word.
1 Bid And Proposal Evaluation Bill Shelton Scott Norton
Preparing a Post Bid Report Preparing a Post Bid Report NYS OGS Design & Construction Group Cost Control.
1. Goals High Risk Activity – National reviews consistently find problems in the methodology Recipients (WYDOT) and Sub-recipients (you) use when making.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Multi-Stage Bidding.
Source Selection and Contract Award
Additive Alternates on ODOT let Projects -A discussion- Joe Anthony Supervisor, Construction Cost Section Office of Estimating.
Procurement-the RFP By Warren J. McKeon, CPA, VCO.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Marcy Mealy Procurement Specialist CDBG Program
November 3, 2002CVEN349 - Maxwell1 Procurement and Materials Management Module 6.2 November 3, 2002.
Construction Engineering 221 Cost Estimating and Bidding.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e PPNM’s/PNM’s Date: 29 Dec 2006.
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guide for Methods of Measurement.
Module 10 Organizing Procurement Session 10.7 Procurement of Goods:
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
PROCUREMENT POST REVIEW OF WORLD BANK FINANCED PROJECTS IN INDIA October 11, 2007.
Billie Smith GSFC Procurement Operations Division December 8, 2004 Prenegotiation Position and Price Negotiation Memorandums.
Encouraging Diversity Growth & Equity 123: Demonstration of Good Faith Todd McGonigle EDGE Program Manager Phone (614) FAX (614)
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
1.6 Contracting Methods Don Shannon. Sealed Bidding Discussed in FAR Part 14 Solicitation is an “Invitation for Bid” (IFB) IFB is publicly advertized.
Multiple Award Contracts Training Presented by Jennifer Salts State of Utah - Division of Purchasing 1.
CIVL202 Construction Engineering I Tutorial 5 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
1 Procurement. 2 Overview Every municipality should keep procurement records that allow an auditor or other interested party to track the specific nature.
WELCOME TO UNB. MARK McGEEHAN Assistant Manager, Procurement Services 3 plus years with UNB 28 years in Healthcare Procurement Current member of APPA.
How To Obtain Quotes Presented by: Dean Hudson Robin Strickland Office of Procurement and Business Services April 2011.
Rabbanai T. Morgan Current as of 26 January 2006 Protests.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
EILS Cost Comparison WMS Jan. 28, Background ERCOT procures Emergency Interruptible Load Service three times annually by Contract Period –February-May.
1 DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER SUPPORT.
CSO Observer Member of the Evaluation Committee. Civil Society Organization May have representation in the Evaluation Committee As a member of the Evaluation.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
Introduction to Procurement for Public Housing Authorities Independent Cost Estimates and Cost/Price Analyses Unit 3.
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
Procurement Management System (PMS) What is PMS? What are the Objectives? Features Overview of the database Challenges Future Developments Views from Users.
BOS 1 Procurement of Goods and Works Asian Development Bank Business Opportunities.
PURCHASING 101 SECTION 1 - How to Begin. Is the purchase available from your agency or from other state agencies? ⋆ State Surplus Property ⋆ State Fleet.
Assessment of the Bidding Process in Construction Project ABDULLAH H. ABU ZANT. AYMAN K. ILAIWI. MOHAMMED FADEL. SODQI M. ALHNAINI. AN-NAJAH NATIONAL UNIVERSITY.
FIDIC Tendering Procedures
Advisor, IDS Cell1 NEGOTIATIONS G.C. Tallur (Former Secretary, PWD) Advisor, IDS Cell Monday, July 11, 2005.
OMB “Super Circular” New Purchasing Guidelines
Discussion of the Differences Public Works Law and Bid Law
Authorization to Enter Into Contract with Four Consultants for General Plan Implementation Services City Council February 6, 2017.
Environmental and Social Considerations in Public Procurement
AASHTO Subcommittee on Construction Contract Administration Section Panel on Unbalanced Bidding Procedures Jerry Yakowenko (FHWA Headquarters) Dean Word.
Light Rail Transit Project
Award Management Services
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
How to Submit a Winning Bid
Department of Community Development
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
What PIs working on federally sponsored projects need to know.
Finance Summer Training
What PIs working on federally sponsored projects need to know.
Procurement Plan and Procedures Code of Standards of Conduct
Procurement.
PROCUREMENT POLICIES AND GUIDELINES
A Pricing Perspective on Contract Cost/Price Analyst
Presentation transcript:

Municipal Assistance Bureau Recommended Bid Analysis Procedures June 24, 2014

Agenda Introduction/Background Introduction/Background Recommended Bid Analysis Procedures Recommended Bid Analysis Procedures Example w/ spreadsheet Example w/ spreadsheet Guideline modifications for typ. LTF Jobs?? Guideline modifications for typ. LTF Jobs?? Q/A Q/A

Background Bid tabulation and bid reviews are an important part of ensuring a transparent, fair and competitive procurement system. Bid tabulation and bid reviews are an important part of ensuring a transparent, fair and competitive procurement system. While the frequency of unbalanced bids is relatively rare, unbalanced bidding reviews are an important step in the letting and award process. While the frequency of unbalanced bids is relatively rare, unbalanced bidding reviews are an important step in the letting and award process.

Bid Analysis (LTF Guidebook) Following the opening of bids, it is required on federal-aid construction projects that the unit bid prices of the apparent low bid be examined for reasonable conformance with the engineer’s estimated prices. Bids that vary greatly from the estimate or demonstrate obvious unbalancing of unit prices shall be further reviewed.

Bid Analysis (LTF Guidebook) Bids can be unbalanced in two different ways: materially and mathematically. Mathematically unbalanced bids are individual price quotations that do not reasonably reflect actual costs. Materially unbalanced bids are ones that generate doubt that the award would result in the lowest ultimate cost.

Bid Analysis (LTF Guidebook) It is possible that bidders will purposely bid an unreasonably low cost to be deemed the low bidder and then, during construction, present evidence that they cannot supply the material or service at the quoted price and therefore request additional compensation.

Bid Analysis (LTF Guidebook) Another possible scenario of material unbalance is that the bidder proposes a higher-than-average price for the items associated with mobilization of the project.

Primary Bid Analysis Steps Step 1: Competition Analysis Step 2: Major Cost Deviations Analysis for reasonableness and unbalancing Step 3: Unit price deviation analysis for unbalancing Step 4: Documentation of results and recommendations

Step 1: Competition Analysis: Identify the engineer’s estimate Identify the number of bidders Identify the range of bids Identify how the number of bids and corresponding bid amounts fall within the chart found in Section 5.a of FHWA’s Guidelines on Preparing Engineer's Estimate, Bid Reviews and Evaluation dated January 20, This can be found at: /ta cfm /ta cfm

Step 2: Major Cost Deviations Analysis for Reasonableness and Unbalancing: Items to be analyzed are selected A detailed analysis is performed on the selected items.

Step 3: Unit Price Deviation Analysis for Unbalancing: Identify the items where the low bid unit price exceeds the estimate unit price. A starting point of items to analyze is those items where the low bid unit price exceeds the estimate unit price by 25% or more. Identify the items where the low bid unit price is lower than the estimate unit price. A starting point of items to analyze is those items where the low bid unit price is lower than 75% of the estimate.

Step 3: Unit Price Deviation Analysis for Unbalancing (continued): If an item has been analyzed as part of step 2, no additional analysis is needed. If an item has not been analyzed as part of step 2, perform an estimate check and quantity check to determine if unbalancing is present. Additional consideration can include number of bidders, bids of second and third bidder, project urgency, and market conditions.

Step 4: Documentation of Results and Recommendations Documentation of the analysis is required to be provided from the Design Engineer. The Documentation shall include a narrative of general observations, number of bidders, range of bids, what acceptable deviation was used, any findings from Step 1 of the analysis, and a summary statement of what the analysis found.

Step 4: Documentation of Results and Recommendations (continued): The Documentation shall include a detailed narrative for each pay item analyzed in Steps 2 and 3. The Documentation shall contain a recommendation as to award or rejection of the bid.

lyndonexample.xlsx

Q/A