Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

Design/Build Solutions to your construction projects, large and small.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
TH 13/101 Design-Build Project S.P October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
Utah’s Use of CMGC & Project Delivery
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
EFFECTIVE COMMISSIONING PROPOSALS Presented To: High Performance Buildings 2006 Las Vegas, April 7, 2006 Presented By: Rebecca T. Ellis, PE LEED® AP, CCP,
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
US 113 FROM NORTH OF GOODY HILL ROAD TO SOUTH OF MASSEY STIPULATED SUM, DESIGN-BUILD, COMPETITIVE SEALED PROPOSALS PROJECT INFORMATIONAL MEETING July 29,
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement Dave Paveglio, Contract Administrator NSLS-II PAC Meeting May 25, 2007.
Innovative Contracting Construction Management Association of America Seminar May 17, 2013 California Department of Transportation.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
1 Purchasing and Procurement Processes Module Four Revision Date: 2/06/2015.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
CS410 - BLUE GROUP Final Presentation communicate2Me.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Design Build, Job Contracting, or Construction Manager at Risk In early 2000 the legislators added an alternate way to accelerate construction project.
Presented to: Presented by: Transportation leadership you can trust. FTC Expressway Authority Cost Savings Study Florida Transportation Commission Expressway.
Risk Sanibel Island Bridges &Toll Plaza Case Study Doug Cox, PE.
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
UDOT I-15 The Point Design-Build Project
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
Americas Interchange Proposal Evaluation Board of Directors Presentation February 26, 2010.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Ohio River Bridges Project
Catherine C. Dunn, P.E., N.PE, P.PE Deputy Director Port Development Prt of New Orleans Catherine C. Dunn, P.E., D.NE, D.PE Director,
1 BROOKHAVEN SCIENCE ASSOCIATES Procurement David J. Paveglio Contracts Administrator Laboratory Office Buildings CFAC Review - November 9-10, 2009.
YOUR PROPOSAL CAN LEAD TO CONTRACT AWARDS
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.
B1B AIRCRAFT MAINTENANCE HANGAR DAHA99-01-R-4001 Debriefing July 16, 2001.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
1. Design-Build is a project delivery process in which the design and construction phases of a project are combined in a single contract. The consultant.
Coordination of Right of Way on Design-Build Contracts By- Richard Bennett State Right of Way Director Virginia DOT.
1 Chapter two ROAD TO DESIGN BUILD. 2 ROAD MAP  THE COST PLUS GUARANTEED MAXIMUM PRICE CONTRACT (GMP)  CM  PM  DB IS THE LATEST STAGE: NEW PERSPECTIVE.
Construction Management At Risk Process
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
Interstate 270 Innovative Congestion Management Progressive Design-Build Contract.
Southeast Rail Extension FasTracks Monitoring Committee July 14, 2015.
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
2016 SAME Small Business Conference - Atlanta
PRESENTER Jose A. Galan ▸ Division Director, Internal Services Department, Real Estate Development Division ▸ Current Chair of the Florida Council For.
Light Rail Transit Project
Procurement Management
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Enterprise Content Management Owners Representative Contract Approval
Developing and Issuing the RFP
Project Delivery Systems
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Green Line Extension Project
PROJECT DELIVERY METHODS
DESIGN-BUILD PROGRAM OVERVIEW
HMPPS Innovation Grant Programme (2020 – 2022)
Presentation transcript:

Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division

Overview Design-Build Procurement Process Upcoming Design-Build Projects Other Project Opportunities

Maryland Department of Transportation

Design-Build Procurement Process Competitive Sealed Proposals Best Value Selection Low Price Selection Multi-Step Sealed Bidding

Design-Build Procurement Process Project Development Establish Project Goals Project Goals tie directly to Project Technical Evaluation Factors Goals will help determine relative importance of Technical Proposal vs. Price Proposal for Trade Off Analysis Price = Technical Price > Technical Technical > Price

Design-Build Procurement Process Statement of Qualifications (SOQ) Lead Design Firm Qualifications and Past Performance Lead Construction Firm Qualifications and Past Performance Project Understanding and Design-Build Approach

Design-Build Procurement Process Evaluation Process Each SOQ is broken down to individual evaluation factors for separate teams to rate a factor or factors. Each evaluation factor and subfactor are rated by consensus team ratings Leaders of each team are part of Evaluation Committee Evaluation Committee reviews all ratings and determines consensus overall ratings and recommended Reduced Candidate List Recommendation presented to Selection Committee by Chairman of Evaluation Committee for approval.

Design-Build Procurement Process Adjectival Rating Process Establish Ratings Guidance before evaluations Exceptional, Good, Acceptable, Unacceptable w/ +/- Weighting of Evaluation Factors and Subfactors Critical (3 times more than important) Significant (2 times more than important) Important No Numbers or Formulas are used.

Design-Build Procurement Process Key Staff Relevant Project Experience – Role on projects, what they did on projects, and how it is relevant to project under procurement Project Description – Demonstrate how projects are similar/relevant to project under procurement Design-Build project not necessarily better than DBB, depends on experience and type of project.

Design-Build Procurement Process Past Project Experience (3 projects) Name, location, owner, project delivery method, construction cost, and schedule performance, and brief project description. What work is relevant and why. Successful methods, approaches and innovations on the project – relevancy to project under procurement

Design-Build Procurement Process Project Understanding & Design-Build Approach Understanding of Project Goals and Scope including significant risks and issues Approach to Design-Build Organizational Chart

Design-Build Procurement Process One-on-One Meetings w/ RCL Design-Builder sets agenda prior to meeting – more detail the better Don’t focus on general clarifications of RFP Focus on issues that need discussion Focus on potential ATCs Alternative Technical Concepts Submit Early as possible!! Alternative solutions/”Practical Design” that will advance the project goals - Explain Specific Deviations and why they are better or equal

Design-Build Procurement Process Technical Proposal Same evaluation process as SOQ w/ exception Price is brought in after consensus Technical Ratings by Evaluation Committee Show level of commitment – No consideration for tentative or ambiguous commitments (“we may” “we are considering”) Fully answer each question and do it in section of the question – No credit for references to other sections or appendices. Ensure it is clear how commitments are beneficial and will realisitically advance and achieve Project Goals.

◦ +/-9 miles 4 lane divided highway ◦ Request for Qualifications – 10/20/15 ◦ SOQs due – 11/23/15 ◦ Fast track schedule  NTP – July 2016  Substantial Completion – November 21, 2017 ◦ Project Goals  Schedule  Cost  Safety  Customer Satisfaction  Mobility

◦ “Progressive” Design-Build ◦ Fixed Price, Best Value Contract ◦ Looking for Design-Builder solutions to move the most vehicles the fastest ◦ No predetermined or preconceived solutions ◦ Goals – Mobility, Reliability, Safety, Ease of Operations & Maintenance, Performance Warranty/Incentives ◦ I 270 = Laboratory to implement innovative solutions (usage in other congested corridors) ◦ Request for Qualifications – Spring 2016 ◦ Two –Phase Contract  Preliminary Design/Preconstruction Services  Guaranteed Maximum Price (GMP) for Construction  May be multiple GMPs within Fixed Price

 Design-Build Funded ◦ US 113 (Phase 4) 4 Lane Roadway (Spring 2016) ◦ US 219 – Interchange at I-68 and 4 Lane roadway (Spring 2016)  Design-Build Unfunded ◦ US 13 Bridge Deck Replacements (end-2015) ◦ MD 32/Rosemary Lane Interchange Construction (Fall 2016)

 Contracts, Bids & Proposals  Contractor AD Schedule - All Projects  Design-Build  Construction Management at Risk

Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division Maryland State Highway Administration QUESTIONS?