MPA-LIGHT: Design and results of a 65 nm digital readout Macro Pixel ASIC prototype with on- chip particle recognition for the Phase II CMS outer tracker.

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

The ATLAS Pixel Detector
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
1 ACES Workshop, March 2011 Mark Raymond, Imperial College. Two-in-one module PT logic already have a prototype readout chip for short strips in hand CBC.
SKIROC New generation readout chip for ECAL M. Bouchel, J. Fleury, C. de La Taille, G. Martin-Chassard, L. Raux, IN2P3/LAL Orsay J. Lecoq, G. Bohner S.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Large Area, High Speed Photo-detectors Readout Jean-Francois Genat + On behalf and with the help of Herve Grabas +, Samuel Meehan +, Eric Oberla +, Fukun.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Development of novel R/O electronics for LAr detectors Max Hess Controller ADC Data Reduction Ethernet 10/100Mbit Host Detector typical block.
MEDIPIX3 TESTING STATUS R. Ballabriga and X. Llopart.
Switched capacitor DC-DC converter ASICs for the upgraded LHC trackers M. Bochenek 1,2, W. Dąbrowski 2, F. Faccio 1, S. Michelis 1 1. CERN, Conseil Européen.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
Pierpaolo Valerio.  CLICpix is a hybrid pixel detector to be used as the CLIC vertex detector  Main features: ◦ small pixel pitch (25 μm), ◦ Simultaneous.
Second generation Front-end chip for H-Cal SiPM readout : SPIROC DESY Hamburg – le 13 février 2007 M. Bouchel, F. Dulucq, J. Fleury, C. de La Taille, G.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
CBC2: a strip readout ASIC with coincidence logic for trigger primitives at HL-LHC D.Braga, M.Prydderch (STFC RAL) G.Hall, M.Pesaresi, M.Raymond (IC) WIT2012.
ALICE Rad.Tolerant Electronics, 30 Aug 2004Børge Svane Nielsen, NBI1 FMD – Forward Multiplicity Detector ALICE Meeting on Rad. Tolerant Electronics CERN,
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
3 rd Work Meeting of CBS-MPD STS, Karelia, 2009 Towards CBM STS Volker Kleipa, GSI Darmstadt.
First ideas for the Argontube electronics Shaper, simulations Block Diagram for analog path Delta Code Data Reduction Bus system, Controller Max.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
1 Vertex-detector power pulsing CLIC Detector and Physics Collaboration Meeting, 02/10/2013 Cristian Alejandro Fuentes Rojas, PH-ESE-FE,
Vertex 2005, Nikko Manfred Pernicka, HEPHY Vienna 1.
CMS Pixel-Strip Project ACES Fourth Common ATLAS CMS Electronics Workshop for LHC upgrades Wednesday, 19 March 2014 Kostas Kloukinas PH-ESE, CERN.
Some thoughts on the New Small Wheel Trigger Issues V. Polychronakos, BNL 10 May,
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
65 nm CMOS analog front-end for pixel detectors at the HL-LHC
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
The development of the readout ASIC for the pair-monitor with SOI technology ~irradiation test~ Yutaro Sato Tohoku Univ. 29 th Mar  Introduction.
The CBC2 ASIC for 2S Modules at HL-LHC Davide Braga IOP 2014 Joint HEPP and APP Groups Annual Meeting, Royal Holloway, May 2014.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Hybrid circuits and substrate technologies for the CMS tracker upgrade G. Blanchot 04/MAY/2012G. Blanchot - WIT
A complete DC/DC converter ASIC for LHC upgrades S. Michelis, F. Faccio, G. Blanchot, I. Troyano CERN PH-ESE S.Saggini University of Udine, Italy Twepp.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
SuperKEKB 3nd open meeting July 7-9, 2009 Hans-Günther Moser MPI für Physik Sensor and ASIC R&D Sensor Prototype Production: running, ASICs: Switcher,
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
M. TWEPP071 MAPS read-out electronics for Vertex Detectors (ILC) A low power and low signal 4 bit 50 MS/s double sampling pipelined ADC M.
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
CMS Binary Chip (CBC): status and development D.Braga, L.Jones, P.Murray, M.Prydderch (RAL) G.Hall, M.Pesaresi, M.Raymond (IC) CMS Upgrade Week, FNAL,
CBM-TOF-FEE Jochen Frühauf, GSI Picosecond-TDC-Meeting.
VMM Update Front End ASIC for the ATLAS Muon Upgrade V. Polychronakos BNL RD51 - V. Polychronakos, BNL10/15/131.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
Simulation Plan Discussion What are the priorities? – Higgs Factory? – 3-6 TeV energy frontier machine? What detector variants? – Basic detector would.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
RD53 1.  Full/large demonstrator chip submission ◦ When: 2016 A.Early 2016: If chip must have been fully demonstrated in test beams for TDRs to be made.
Overview of TPC Front-end electronics I.Konorov Outline:  TPC prototype development  Readout scheme of the final TPC detector and further developments.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
3/FEB/2015G. Blanchot, F. Faccio, S. Michelis1 FEASTMP DCDC Converters G. Blanchot On behalf of the PH-ESE Power Project Team.
De Remigis The test has been accomplished with an SLVS signal, since that was chosen for the serial communication between the readout and the optical converter.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
Work on Muon System TDR - in progress Word -> Latex ?
Valerio Re Università di Bergamo and INFN, Pavia, Italy
KLOE II Inner Tracker FEE
 Silicon Vertex Detector Upgrade for the Belle II Experiment
A General Purpose Charge Readout Chip for TPC Applications
Calorimeter Mu2e Development electronics Front-end Review
Results achieved so far to improve the RPC rate capability
Jan Soldat, Heidelberg University for the DSSC ASIC design groups
DCH FEE 28 chs DCH prototype FEE &
Phase shifter design for Macro Pixel ASIC
VELO readout On detector electronics Off detector electronics to DAQ
BESIII EMC electronics
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Setup for testing LHCb Inner Tracker Modules
SVT detector electronics
Presentation transcript:

MPA-LIGHT: Design and results of a 65 nm digital readout Macro Pixel ASIC prototype with on- chip particle recognition for the Phase II CMS outer tracker upgrade A. Caratelli, D. Ceresa, R. Francisco, J. Kaplon, K. Kloukinas and A. Marchioro. PH-ESE, CERN TWEPP ‘15, Wednesday the 30 th September, 2015

2 CMS was originally designed to run at Luminosity = 1 x cm -2 s -1 HL-LHC will improve up to Luminosity = 7.5 x cm -2 s -1 Phase II upgrades prepares CMS for HL-LHC Technical Proposal for the Phase-II Upgrade of the CMS Detector:

Main Outer Tracker requirements: 3 Up to pile up = 200 Contribution to Level 1 decision L1 rate = 750 KHz L1 Latency = 12.8 us Reduce Material Pixelated sensor Larger bandwidth Larger buffers P T modules New technologies + POWER - POWER

4 P T module discriminates particle Pass Fail Stub Particle are discriminated according to their transverse momentum The module is composed by two sensor layers

Outer Tracker working principle: 5 Stub Finding Outer Tracker Front-End Stubs only Trigger-less readout: The electronics provides the stubs found at each event. Triggered readout: The electronics stores the full frame at each event.

6 Stub Finding Track Find Readout Outer Tracker Front-End Tracker Back-End Stubs only Outer Tracker working principle: Dedicated talk: “Track Finding in CMS for the Level-1 Trigger at the HL-LHC”, M. Pesaresi

7 Stub Finding Track Find CMS Level 1 CMS DAQ Outer Tracker Front-End Tracker Back-End CMS Level 1 accept Stubs only L1 accept rate = 750 KHz Latency = 12.8 us Full Frame Outer Tracker working principle: Readout

2 x P T modules: mm 70 mm 130 mm Z Ф 2 Strip module Strips ~ 5 cm x 90 um r > 40 cm TID ~ 40 Mrad Inner Tracker (RD53) Pixel Detector Pixel + Strip module Pixels ~ 1.5mm x 100um Strip ~ 2.5cm x 100um 20 cm < r < 40 cm TID ~ 100 Mrad

Pixel + Strip module exploded view 9 ShortStripASIC x 8 Concentrator IC (CIC) Data aggregation MacroPixelASIC x 16 Pixelated Layer ~ 32k pixel LP-GBT and VTRx+ Data transmission through the optical link DC-DC converters PS module is fully integrate entity Strip Layer ~ 2k strips

Pixel Strip module Front-End ASICs 10 MPA (1.2 cm x 2.5 cm) FEFE SRAM Data Formatting I/O Binary Readout Stub Finding Logic I/O FE Binary Readout I/O SHORT STRIP ASIC Full Frame Stubs only Strips Pixels Level-1 accept Power budget < 100 mW / cm 2 (Total for both Front-End ASICs)

MPA-Light: the MPA prototype 11 Analog FE circuitry in 65 nm Development of the sensor Module assembly MaPSA-Light MPA-Light

MPA-Light ASIC floorplan * 100 μm mm 2 mm 3 x 1446 μm z X Analog Pixel FE Digital Pixel Logic Analog Bias Digital Periphery Logic Bump Bonding Pads I/O Driver Row 1 Row 2 BB connection to PCB/hybrid/detector periphery WB connection to PCB/Hybrid (staggered) BB connection to detector pixels BB connection to detector GND 1.7 mm

MPA-Light functional description FE Hit Counter Binary Readout Sample Clock (40 MHz) 3 modes of operation available Stub finding Digital-to-analog Converters (DACs) Calibration pulses Threshold Trimming (per pixel) Input Test results are obtained without sensor i.e the input are from calibration capacitances 13 Memory Components for testing

Analog Front-End schematic 14 designed by J. Kaplon Preamplifier ShaperDiscriminator Current consumption < 30 uA / channel

Calibration DAC measurement 15 Calibration pulse [fC] 8.7 fC 0 fC DAC code Nominal step = fC Measured step = fC Offset = fC On purpose for Radiation hardness

Pixel Threshold spread Nominal Step ~ 1.5 mV Threshold DAC Hit Counter Trimming DAC steps = 7.5 mV Best trimming with the 5-bits trimming DAC Pulse Injected ~ 3 fC Hit Counter

Gain and Noise from S-curves (1) fC … 1.05 fC Nominal Step ~ 1.5 mV Threshold DAC Optimization region Calibration pulse amplitudes Hit Counter 2.45 fC

Gain and Noise from S-curves (2) fC2.25 fC Calibration pulse amplitude Threshold [mV] 30 mV 190 mV Hit Counter Threshold DAC 0 80 sigma(cerf) = ENC mean(cerf) = Threshold Complementary error function fitting

MPA-Light functional description FE Hit Counter Binary Readout Sample Clock (40 MHz) 3 modes of operation available Stub finding Digital-to-analog Converters (DACs) Calibration pulses Threshold Trimming (per pixel) Input Test results are obtained without sensor i.e the input are from calibration capacitances 19 Memory Components for testing

Binary readout allows FE studies: fC 2.2 fC 1.1 fC Peaking time ~ 24 ns 0 ns 140 ns 0 mV 310 mV Peak Gain ~ 91 mV/fC Shaper Output [mV] Injection time [ns] Shaper output for different charge 1 fC 9 fC ΔWalk Time [ns] Max delay < 10 ns Injected Pulse [fC] FE walk time (Threshold = 0.5 fC) 0 ns Simulations value: Time walk: < 14 ns from 0.5 fC to 12 fC Peaking time = 24 ns

Z X From Binary readout MPA-Light digital logic testing 1. No Processing mode: Used to test Binary readout and Pixel Clustering 21

Z X From Binary readout + Pixel Clustering MPA-Light digital logic testing 1. No Processing mode: Used to test Binary readout and Pixel Clustering 22

Z X From Binary readout + Pixel Clustering Centroid List X = 3, Z = 1 X = 2, Z = 3 MPA-Light digital logic testing 1. No Processing mode: Used to test Binary readout and Pixel Clustering 2. Data Processing mode: Used to test Encoding and Stub Finding Logic 23

Z X From Binary readout + Pixel Clustering Centroid List X = 3, Z = 1 X = 2, Z = 3 Stub List X=3, Z=1, B=0 X=2, Z=3, B=-1 or MPA-Light digital logic testing Tested with pattern from FPGA 1. No Processing mode: Used to test Binary readout and Pixel Clustering 2. Data Processing mode: Used to test Encoding and Stub Finding Logic 24 Further details on the Stub finding logic:

Z X From Binary readout + Pixel Clustering Centroid List X = 3, Z = 1 X = 2, Z = 3 Stub List X=3, Z=1, B=0 X=2, Z=3, B=-1 or MPA-Light digital logic testing Tested with pattern from FPGA 1. No Processing mode: Used to test Binary readout and Pixel Clustering 2. Data Processing mode: Used to test Encoding and Stub Finding Logic 3. Strip Emulator mode: Tested with oscilloscope 25

Total Ionizing Dose (TID) with X-ray 26 PS module TID < 100 Mrad 0 Pre rad value -15 % Total Ionizing dose [log TID] 150 Mrad Annealing - 11 % Threshold DAC variation with TID Mrad ∆ Threshold Step [%]

Conclusion and future plans MPA-Light fully functional MaPSA-Light ready MaPSA-Light Testing MPA & SSA design Final size MPA and SSA 27

Thanks to all the CMS TRACKER PHASE II ELECTRONICS TEAM 28 Davide Ceresa, A. Caratelli, R. Francisco, J. Kaplon, K. Kloukinas and A. Marchioro. PH-ESE-ME, CERN TWEPP ‘15, Wednesday the 30 th September, 2015

Backup slides 29 Davide Ceresa, PH-ESE-ME, CERN TWEPP ‘15, Wednesday the 30 th September, 2015

30 Reduced thanks to: Bend bits reduction Tight Stub threshold Different LP-GBT transmission mode Good stub losses lower than 0.5% in all the tracker at Pile Up 200 Stub transmission to tracker back- end is clearly critical for the first barrel layer simulation and studies by S.Viret Tracker Back-end data transmission

Tracker power budget is limited 31 Working temperature cooling: ~ -30C Total Power Allocated per 16 MPAs and SSAs: 4W Total Power Allocated per MPA + SSA: 250 mW Rough Power Estimation: Analog70 mW L1 Memory70 mW SSA40 mW Remaining70 mW I/O Clock Distribution Data Transport Stub Finding Logic L1 Data Logic Output Interface

Powering reference scheme – 1V used to power digital logic which can work also at low voltage slide and studies from G. Blanchot, F. Faccio and S.Michelis

Stub Finding logic efficiency results 33 Module efficiency Layer Efficiency Layer efficiency with interconnection VertexZ -Z

Stub Finding logic efficiency results 34 X V Module A Module B VertexZ Recovered Without an interconnect technology (ex: TSV) between the two sides of the module, tracks crossing the middle will not be identified as stubs

Stub Finding logic efficiency results 35 V V Module A VertexZ V Tilted layout solves the problem and decrease the number of modules, but complicates mechanics

Flipped MaPSA concept 36 Only bump bonding in MPA design No extra material between sensors Better cooling of MPA Digital IO through sensor periphery Temperature gradient across the sensor surface Larger sensor can create problem in final production STRIP SENSOR MPA SSA MPA SSA EXTENDED PIXEL SENSOR Cooling BASELIN E STRIP SENSOR PIXEL SENSOR SSA MPA Cooling PROPOSA L

MPA-Light test system overview 37 Power Supply Ethernet Cable MPA-Light Test system controlled by Python routines Communicates with IP bus Interface Board Voltage and Current generator and monitors designed for the CLICpix readout by Szymon Kulis FPGA Handle configuration, readout and control the interface board Load board Exchangeable board for the ASIC wire bonding and decoupling developed by A. Caratelli

Analog Front-End simulation results 38 designed by J. Kaplon Other simulation results: Gain from S curves: 85 mV/fC Time walk :< 14 ns with threshold at 0.5 fC and signal from 0.75 to 12 fC Noise(Worst case): > 20) Spread 90 mV pk-pk Peaking time 24 ns Montecarlo simulations 100 runs for 2.5 fC

Binary readout allows FE studies MHz Clock Hit detector output Discriminator Output Shaper Output Changing the calibration injection point and using the synchronous readout we can characterize the shaper of the analog FE Observing when the time stamp change we can extract the rising time of the shaper from zero to the set threshold Threshold

Service Board with Staged DCDC scheme 30/SEP/2014G. Blanchot, F. Faccio, S. Michelis - 2S and PS Powering Meeting Input power: low profile Molex Picoblade 2 poles connector (stands our current rating). The filters will stay out of the shield area, must be on sides. Wirebond based IO implemented so far. The same low mass ECCA based coil is used for the 3 converters. The new LV DCDCs still based on teh FEASTMP geometry. However we can consider a smaller package for this chip. The 3 DCDC stages can be fitted in the available board space without excessive compromise. Wirebonds Input Filters 16V caps FEASTMP LV caps New DCDCs Filters Wirebonds

PS module Forum 2014: Tilted Barrel for CMS Phase 2 Upgrade Silicon strip sensor 2.Silicon pixel sensor 3.Macro-Pixel ASIC (MPA) 4.Al-CF sensor spacer 5.CFRP base plate 6.FE Hybrid 7.Opto-Link Hybrid 8.Power Hybrid 9.Short-strip ASIC (SSA) 10.Concentrator IC (CIC) 11.Hybrid CF support 12.Al-CF Hybrid spacer Support and cooling via a large-area base plate

42 More realistic tilted geometry Forum 2014: Tilted Barrel for CMS Phase 2 Upgrade Z = 0 Short cylindrical section in the center Constant tilt angle in several successive rings o Helps avoiding clashes o Also, reduces support structure variants.

43 Material budget full tracker Forum 2014: Tilted Barrel for CMS Phase 2 Upgrade S. Mersi at al., Performance of Tilted Inner Barrel, CMS Upgrade Workshop 1 April 2014