LIGO-G060432-00-P The Document Control Center: Introducing the New Document Management System Powered by Linda Turner - Caltech.

Slides:



Advertisements
Similar presentations
Copyright, UCL LEADERS: Linking EAD to Electronically Retrievable Sources Developing a Generic Toolkit: Architecture and technology issues ALLC/ACH Conference.
Advertisements

Corporate Interface Architecture George Palios. Contents Outlines the activities undertaken to enhance the quality of service of the Corporate interfacing.
TechStat Presented By, Agency Seal. TechStat Thesis 2 Point 2 Point 1 Point 3.
RFP #R13-FHP0826 for Financial/HR/Payroll Software Why did the WNYRIC decide to do an RFP now? Preparing for the Future WNYRIC currently supports 90 districts.
Chapter 3 Project Initiation
Community & Open Source Software in Cultural Heritage Institutions CNI December 2012.
OCLC Online Computer Library Center OCLC ILL / ILLiad Users Group Meeting 2005 ALA Annual Conference June 26, 2005.
Demonstration of the use of browser extensions in Mozilla to link from a Google Scholar item to a European Library object.
Class of ‘55 Room, Van Pelt Library - August 26, 2011.
FileMaker Services and Resources Departmental Consulting and Application Development Team ITAG Lunchtime Seminar February 7, 2007.
UCLA Digital Library Technical Architecture June 13, 2002 UCLA Digital Library Presenter: Curtis Fornadley, Senior Programmer/Analyst.
Caminhos de Ferro Portugueses E.P. European Datacomm NV IVU Traffic Technologies AG National Technical University of Athens Prometni Institut Ljubljana.
LIGO G PLIGO Laboratory1 Change Request CR Replace LIGO Document Management System Philip Lindquist, Caltech August 5, 2005.
Component Specification Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
© 2003, Educational Institute Chapter 11 System Selection Managing Technology in the Hospitality Industry Fourth Edition (469T or 469)
EE496A Senior Design Project I Dr. Jane Dong Electrical and Computer Engineering.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
State of Oklahoma Information Services Division Contracts and Purchasing Unit 1.
Torrance Public Library Electronic Collection Map April 2011.
EPIC Web 3.0 Demonstration United States Department of Agriculture Office of the Chief Financial Officer National Finance Center June 26, 2008.
A Lessons Learned Discussion of Digital Control Upgrades How to Make Sure Your Digital Upgrade is Over- Budget, Over - Schedule, and Everyone’s Vacation.
Dependencies on NETS Presented by UCAR Technical Security.
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
Resource Management and Accounting Working Group Working Group Scope and Components Progress made Current issues being worked Next steps Discussions involving.
Doing More with TeamTrack May 1, /17/2015 6:14 PM Goals and Objectives Increased Reuse of Critical Assets Increased Productivity and Effectiveness.
Welcome to the Minnesota SharePoint User Group February 11 th, 2009 Back to Basics: MOSS Wes Preston Raymond Mitchell Meeting.
Asset Record Does Not Equal CI: The confusion between Asset and Configuration Management Christine M. Russo Manager, IT Asset Management and Property.
Chapter 14 Information System Development
SWHISA 5th Year Work Plan Session, Bahir Dar, 06 Aug 09, COA SWHISA Finance & Accounting System Project: SWHISA Presenter: COA This presentation will probably.
AccessAMS – Laserfiche FAQ’s September 24 th, 2014.
Eurostat F - Break-Out Sessions SDMX RI User Group Luxembourg, September 2013.
Welcome to the Minnesota SharePoint User Group. Agenda Quick Introduction Announcements and News 2007 Microsoft Office System Licensing and Pricing Real-World.
LIGO-G9900XX-00-M PROCEDURE for REQUESTS FOR APPROVAL (RFQ’S) and CONTRACTS/PURCHASE ORDERS LIGO-G P 29 October 2008 Linda Turner LIGO II1.
UN/CEFACT XML Schema Status and Data Exchange Requirement Guidelines Joan Ugljesa NDIA PMSC August 26, 2010.
1 DLESE-IMS Metadata, ADN Metadata and the DLESE Catalog System.
HANDLING RAW MATERIAL MSDS. PROJECT TO IMPLEMENT A SOLUTION TO REPLACE AN EXISTING OUT-SOURCED MSDS SYSTEM FOR RAW MATERIALS.
The FCLA Digital Archive Joint Meeting of CSUL Committees, 2005.
LSC Meeting March 2006 LIGO-G Z 1 It’s Coming! A new DCC Document System Linda Turner Caltech.
LIGO-G P LIGO Laboratory1 WELCOME! Dr. Ken Libbrecht.
Summary Report Project Name: IHTSDO Workbench Brief Project Description: Development of a collaborative tool to allow maintenance of terminology, mapping.
Planned Document Management Improvements Rob McKercher, Iain Goodenow, George Angeli.
Network design Topic 6 Testing and documentation.
Communicating Visually with Visio Gini Courter Annette Marquis.
LIGO-G P LIGO Laboratory1 THE D OCUMENT C ONTROL C ENTER Linda Turner 14 November 2002.
Don’t Duck Metadata March 2005 Introducing Setting Up a Clearinghouse Node Topic: Introduction to Setting Up a Clearinghouse Node Objective: By.
2015 Advanced Seminar Kim Horton, CAE – Durham County & John Burgiss, RES – Forsyth County.
Dynamic Languages Initiative Silverlight ASP.NET Web Services Summary.
PEOPLESOFT UPDATES PeopleSoft Support and Sustainment Center PeopleSoft Support and Sustainment Center.
CU Student Organizer Trey McAlhany CPSC 482 Mobile Software Development Clemson University April 7, 2015.
O SharePoint 2013 Remote Event Receivers Speaker.
Joint Meeting of CSUL Committees,
Software & Technologies: an overview
Testing the System.
Business Management Techniques
Efficiently Searching Schema in SQL Server
IHTSDO SNOMED CT Tooling
Enterprise Content Management Owners Representative Contract Approval
Implementing Listening Producers in IBM Sterling Filegateway
Implementation and Introduction to Users
Software Engineering I Fall 2017
Database Connectivity and Web Development
Introduction to Digital Libraries Assignment #4
Software Engineering Practices
THE HISTORY OF EVERGREEN IN ARMENIA
Enterprise Content Management (ECM) Project
Purpose: Delphi Migration means migrating from old versions to latest versions. Delphi migration process becomes something of a living document, which.
Request for Change and Release of Funds
Presentation transcript:

LIGO-G P The Document Control Center: Introducing the New Document Management System Powered by Linda Turner - Caltech

LIGO DCC Project Background Project Started 2005 Requirements Vendor demonstrations Selection Contract award to FileHold – Vancouver, B.C. Milestones Achieved Document schemas designed and metadata defined Every document allocated from present system into the new Conversion database designed and developed to verify accuracy of migration

Upcoming Milestones – Blackout of old system – Scheduled for Thursday, August 24 th – New system to go live – Scheduled for Tuesday, August 29 th

Topics Covered in this Presentation Different types of documents & Metadata Requesting a DCC Number Adding a document to the library with a DCC number Versioning document Linking documents Searching for documents

Document Types Publications Technical Notes MOU’s Budgets and Financial Change Requests Drawings Contractual Engineering Multi-Media Presentations Human Resources Management Travel

Product Demonstration Document & Record Lifecycle Software This is a live product demonstration of the LIGO DCC system hosted on a demo server in Vancouver B.C. Canada. The documents on this system are for demonstration purposes only.

Q&A Questions ????