04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona.

Slides:



Advertisements
Similar presentations
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
Advertisements

TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
The procedure to replace CALO rectifier (AC/DC converter) 1.
Yu. Guz 2015/04/211 CALO HV Updated version of the 2012 slides, ** See also Anatoli’s.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
The High Voltage, Monitoring and Control systems of the Hadronic and Electromagnetic calorimeters are essentially slow control based, and therefore are.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
ECS for Front-End crates MARATON. 2 Introduction Front-End crates are powered by MARATON power supplies, located on the platform, at the back of each.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
26JUN08Calo Piquet Training Session - Xvc1 DCS and DSS Xavier Vilasis.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
1 H C A L S.Sergueev, NEC2001, Varna, September 2001 CMS HCAL Slow Control System for the CMS Hadron calorimeter S.Sergueev, FNAL/JINR CMS HCAL.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
Calorimeter Performance Paper Xavier Vilasís-Cardona Calo Meeting - Xvc1.
SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
ECS activities Xavier Vilasís-Cardona Calorimeter Meeting - Xvc.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
1 Summary of Calorimeter LED monitoring, LV & MV power and HV electronics + ECS control Anatoli Konoplyannikov Outline  Software tool of the LED.
Wiener Maraton & Turbines Pascal Perret LPC Clermont 16 April 2008.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
26 MAY 2004Jacques Lefrancois1 PRR for LED SYSTEMS 3 notes distributed + 3 presentations (Anatoli, Ivan, Evgueni) Large amount of work ; many prototypes.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
1 LHCb CALO Anatoli Konoplyannikov Introduction Short recipe of the calorimeter Marathon crates control Step by step explanation Marathon power.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
CALO News Pascal Perret LPC Clermont 22 January 2012.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
The Maraton LV system Michela Lenzi INFN Firenze Thanks to V. Bocci, P. Ciambrone, A. Sciubba LV Power Supply RCM AC/DC converter.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Detector Control System
General aspects: Optical links :
Institute of Nuclear Physics Polish Academy of Sciences
The LHCb Run Control System
Presentation transcript:

04ABR07Calo Commissioning Meeting - Xvc1 Power Supplies Xavier Vilasis-Cardona

04ABR07Calo Commissioning Meeting - Xvc2 Outline Status of ECS for the Global Commissioning test –Power Supplies –Other issues

04ABR07Calo Commissioning Meeting - Xvc3 Status of ECS for Global Commissioning Test HCAL FE card control – see Frederic’s presentation HV-LED System – see Anatoli’s presentation Databases – see Yuri’s presentation DSS – see Laurent’s presentation Power Supplies

04ABR07Calo Commissioning Meeting - Xvc4 Power Supplies – FE systems SystemsPower Supply TypePS location ECAL CrateWiener MarathonBehind Crate HCAL CrateWiener MarathonBehind Crate PRS/SPD CrateWiener MarathonBehind Crate HCAL HV-LED systemAgilentBarrack ECAL HV-LED systemAgilentBarrack PRS/SPD HV-LED systemAgilentBarrack PRS/SPD VFEWiener MarathonTop of FE Crates Monitoring Radiative Source *Wiener MarathonTop of FE Crates LED SystemWiener MarathonTop of FE Crates * Plus dedicated non interruptable 230V AC

04ABR07Calo Commissioning Meeting - Xvc5 Remote Controlled Wiener Marathon Power Supplies Power Supply close to FE/VFE electronics Remote Control Module in the barracks –One RCM can control up to 2 PS –Except for PRS/SPD VFE PS (double) –Each RCM has an IP address Soft Control for RCMs provided by Online Group –for crate PS –one central PC (or PVSS project) to control all –not for LED-VFE ones –Software is not ready for Remote Controlled PS (only for local ones)

04ABR07Calo Commissioning Meeting - Xvc6 Agilent Power Supplies Specific for the Calorimeter Five Agilent PS's will be used for producing middle voltages (100, 150, 30, 18 V) for calorimeter sub-detectors. –ECAL four units PS (100V, 30V,100V, 30V for A and C sides); –HCAL four units PS (100V, 30V,100V, 30V for A and C sides); –PS/SPD one unit PS (150V for side A); –PS/SPD one unit PS (150V for side C); –PS/SPD two units PS (18V, 18V for side A and C); May be will be excluded and on platform Maraton PS will be used Each PS has a control unit working by ethernet (IP address) Control to be provided by us (Calo Group)

04ABR07Calo Commissioning Meeting - Xvc7 Summary Wiener Marathon Agilent CratesHV-LEDVFE Wiener RCMs Agilent RCMs ECAL HCAL PRS/SPD Total

04ABR07Calo Commissioning Meeting - Xvc8 RCMs location Wiener Marathon RCM crates are located in rack B1B01 –Together with 380V PSs –One crate can host 21 RCM –We can use one crate per detector side Agilent PS and controls are located in rack D3B04 PS control PCs shall be located in D2C06 or D2C07 (TBD)

04ABR07Calo Commissioning Meeting - Xvc9 LV Control PCs Calorimeter LV control PCs –Control of Agilent PS –Control of Wiener Marathon for VFE (?) One PC could do it all We keep one PC per TFC partition –ECAL –HCAL –PRS/SPD

04ABR07Calo Commissioning Meeting - Xvc10 GCT – Involved Racks Start testing C-side Inner part of detector –HCAL - crate 23, rack L3A03 –ECAL - crate 14, 13, 12, 11 - racks L3B01, L3B02 –PRS/SPD - crate 2, 3 - racks L3B01, L3B02 –Power Supplies Marathon Control Modules and Primary Power for Marathon Power Supplies on crate B1B01 Agilent Power Supplies on D3B04 –Control PCs for SPECS and CAN on D2C03 –Control PCs for CCPC on D2C07 –Control PCs for Power Supplies on D2C06 or D2C07 tbd –Calo TELL1 and L0 on D3B01 - D3B02

04ABR07Calo Commissioning Meeting - Xvc11 Other issues Ordered Online PCs –SPECS HCAL C-side - hcdaq02w ECAL C-side Rad Source Monitoring –PS Control HCAL - hcdcs01w Created Online Accounts SPECS PCs Operating System –Windows ?