DSS  Informal review Tuesday 24 th October 10:00 Room 2 1-034, organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
M.N Minard SPD cabling overview SPD cable chain & tray SPD cable chain & tray Motorisation PS/SPD Motorisation PS/SPD Work on PS Work on PS.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
Problems with UPS racks last week... During the DSS tests on the weekend Jun 1-2 all racks connected to „interruptable“ UPS were cut by DSS at some point.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
The procedure to replace CALO rectifier (AC/DC converter) 1.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
Point 5 - Cooling Network - Key Primary Water Chilled Water Mixed Water Eau Bruite Standard Power Diesel Backup Comp Air Primary Water at 20-25C – Produced.
May Exp-Area meeting1 Safety Systems Installation status Flammable Gas Detection System Fire Detection System in SG8 ODH Detection System CO2 Detection.
André Augustinus 16 September 2002 Safety issues.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Electric Circuits For a continuous flow of electrons, there must be a complete circuit with no gaps. Electric Circuits.
J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.
Gas Coordination Panel 24/08/2004 Flammable Gas Installation Requirements, Interlocks, etc. F.H.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Ken Wyllie, CERN Upgrade infrastructure, Feb LHCb Upgrade Electronics Infrastructure K. Wyllie & L. Roy.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
CALO News Pascal Perret LPC Clermont 26 November 2014.
Muon System Safety Issues Burkhard Schmidt.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
15-16/3/04 DCS workshop G. De Cataldo, A,.Franco and A. Tauro 1 Answers from the HMPID to the ACC questions 1.Concerning global DCS overview drawing 2.Concerning.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
26JUN08Calo Piquet Training Session - Xvc1 DCS and DSS Xavier Vilasis.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
Ion Sources – Hardware and Operation MACS Week Friday 8th October 2010 PP a-LPE, 8 th October 2010, MACS Week 2 Liviu Penescu, „Ion Sources.
André Augustinus 9 October 2006 Interlocks update.
E.Gushchin (INR,Moscow) 09 March 2009 Shutdown Calo meeting CERN Status PS/SPD of LED tuning Status of tuning on A-side. Some problems Results of tuning.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
FPD SOFTWARE TEST MOTIONS / CONNECTIONS / CONFIGURATION / SOFTWARE / TESTS / CONCLUSION Lionel Peyrichoux 14 March 2001.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
TC meeting P2 planning wks 3&4 A.Tauro
CALO News Pascal Perret LPC Clermont 22 January 2012.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
E.Guschin (INR,Moscow) 20 January 2006PS/SPD meeting CERN PS/SPD LED monitoring system status In December 2005: –All splitters and drivers are delivered.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
23MAY07Xvc - Calo ECS Working Group1 Calo FSM hierarchy and structure Xvc.
David BAILLEUX On behalf of the Caltech group Issues for the Laser Monitoring System M&O - US CMS ECAL IB meeting 19 March Chilled water supply.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
Tracker cooling loop “check out” draft for discussion
M.Tavlet, H.Taureg - ALICE
Presentation transcript:

DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends if DSS is not installed and running.  We must present our thoughts on  equipment needed  alarms  actions

- Probe for water leak detection (Mixed Water) on the bottom of the HCAL and ECAL Racks : How many, fixation, cables used, where chaining is done, when they will be ordered and installed, tests... - Thermo switch for PS and SPD : How many, types, switching temperature value, position, cables used, where chaining is done, when they will be ordered and installed, how to test them... - Link between DSS and the demineralized Water PLC (cooling for PS/SPD): Are there two circuits side A and side C?, PLC location, connection types to the PLC. - Other equipement safety points without links foreseen today with DSS: 100V,30V,18V Voltage shut down, 'Switch off' function directly on the HV ? "monitoring source"-->interlock, parking position when electrical power cutting ?... - When will DSS need to be fully operational for Calorimeter ?

Then, the Alarm-Action Matrix could also be discussed during that meeting. The Calorimeter can be divided in two parts (DSS point of view), my proposition for each side is the following: * One PS/SPD Thermo switch open --> Alarm: Temperature too high in PS or SPD 'boxes' side x --> Action: shut down electrical power for Calorimeter side x (x = A or C). * No Flow (mixed water) during 10 seconds OR water Temperature too high OR water Temperature too low --> Alarm: Mixed water cooling not ok --> Action: shut down electrical power for Calorimeter side x AND? close valve of the circuit side x. * Detector fire detection (Sniffer system) in a calorimeter part side x --> Alarm: Fire detection in Calo side x --> Action: shut down electrical power for Calorimeter side x. * Rack fire detection (Smoke detector in Turbine)--> Action: shut down electrical power for Calorimeter side x AND CO2 Gas injected in the rack concerned. * Rack Thermo switch in Turbine open --> Alarm: Temperature too high in a rack side x --> Action: shut down electrical power for Calorimeter side x. * Water leak detection in a rack side x --> Alarm: water leak in a rack side x --> Action: shut down electrical power and close valve of the circuit side x. * Water leak detection in a PS or SPD 'boxes' side x --> Alarm: water leak in a PS/SPD boxes side x- -> Action: shut down electrical power for Calorimeter side x AND open a contact ('stop the cooling')links to the demineralized water PLC. * Contact open from the demineralized water PLC --> Alarm: demineralized water not ok --> Action: shut down electrical power for Calorimeter side A and/or C ? (The D3 and B1 Calo racks follow a common Counting House racks Action-Matrix) DSS documentation (in french):