© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 7 – Budgeting and Cost Estimation.

Slides:



Advertisements
Similar presentations
Copyright by John Wiley and Sons, 2006
Advertisements

Cost Estimation and Budgeting
Project Management A Managerial Approach
Project Cost Management Estimation Budget Cost Control
The Comparison of the Software Cost Estimating Methods
Project Management: A Managerial Approach 4/e
Overall Framework Decision Making (Unit 2) -CVP -Special Orders -Make or Buy -Capital Investments Cost Accumulation Systems (Unit 1) Corporate Strategy.
Project Management: A Managerial Approach
Project Management: A Managerial Approach
Scheduling and Budgeting
Project Management Session 7
Master Budgeting Chapter 8
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Forecasting Operations Chapter 12 Roberta Russell & Bernard.
Time and Cost Estimation
MEM 612 Project Management
The Strategic Role of Information in Sales Management
Estimating Project Times and Costs CHAPTER FIVE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Part II Project Planning © 2012 John Wiley & Sons Inc.
Budgeting and Cost Estimation
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Chapter 4 Budgeting the Project
Profit Planning UAA – ACCT 202 Principles of Managerial Accounting Dr. Fred Barbee.
The Pricing Decision and Customer Profitability Analysis
Quick Recap 1Monitoring and Controlling. Project Time Management Summary 2 Monitoring and Controlling.
Copyright © The McGraw-Hill Companies, Inc 2011 PROFIT PLANNING Chapter 8.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Review network diagram Forward/backward pass Critical path/activities Float Funding a project Costs estimates Type of costs Financial reports 7-1.
IBS 540 Week 8. Budgeting and Cost Estimation The budget serves as a standard for comparison It is a baseline from which to measure the difference between.
Cost Estimation and Budgeting. Cost management Data collection & cost estimation Cost accounting Cost controll Copyright © 2010 Pearson Education, Inc.
CS-411W VIII – Budgeting, Costing, and Pricing. Definitions Cost - the value of inputs that have been used to produce something. Inputs are typically.
Dr. Jana Jagodick Polytechnic of Namibia, 2012 Project Management Chapter 10 Project Cost Management.
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
7-1 Profit Planning Master Budget Chapter 7 Adapted by Cynthia Fortin, CPA, CMA Cost Management, Eldenburg, Wolcott, Chen and Cook.
Part 2 Support Activities Chapter 3: Planning McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc., All Rights Reserved.
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.4-1.
Management & Development of Complex Projects Course Code - 706
In Chapter 4: Budgeting the Project Budgeting: the process of forecasting what resources the project will require. Cost estimating process: evaluating.
Chapter 7 Budgeting: Estimating Costs and Risks © 2012 John Wiley & Sons Inc.
Project Cost Management
4-1 Chapter 4 Budgeting the Project. 4-2 Introduction 4 Budgets are plans for allocating organizational resources to project activities. –forecasting.
 2001 Prentice Hall Business Publishing, Accounting Information Systems, 8/E, Bodnar/Hopwood Systems Implementation, Operation, and Control Chapter.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 7 – Budgeting and Cost Estimation.
Copyright 2013 John Wiley & Sons, Inc. Chapter 8 Capacity, Scheduling, and Location Planning.
Estimating Project Times and Costs CHAPTER FIVE Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter – 1 Nature and Scope of Cost Accounting
Production and Operations Management Forecasting session II Predicting the future demand Qualitative forecast methods  Subjective Quantitative.
MEM 612 Project Management
Project Management in Practice, Fourth Edition
© 2013 John Wiley & Sons, Ltd, Accounting for Managers, 1Ce, Ch 14 1.
(6) Estimating Computer’s efficiency Software Estimation The objective of Software Estimation is to provide the skills needed to accurately predict the.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
F5 Performance Management. 2 Section C: Budgeting Designed to give you knowledge and application of: C1. Objectives C2. Budgetary systems C3. Types of.
Budgeting An important Project Management Tool. What is a budget? A Plan A Limit A Schedule A Reality Check An Allocation.
1 Copyright © 2008 Cengage Learning South-Western. Mowen/Hansen Profit Planning Chapter Seven Fundamental Cornerstones of Managerial Accounting.
Copyright 2015 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Profit Planning Master Budget Chapter 7
Budgeting and Cost Estimation
Cost Estimation and Budgeting
Project Management: A Managerial Approach 4/e
Chapter 4 Budgeting the Project.
Budgeting: Estimating Costs and Risks
Master Budget and Responsibility Accounting
Copyright 2012 John Wiley & Sons, Inc. Chapter 7 Budgeting: Estimating Costs and Risks.
Budgeting: Estimating Costs and Risks
Cost Estimation Chapter 5
PERFORMANCE AND TALENT MANAGEMENT
Project Management: A Managerial Approach
PowerPoint presentation
Presentation transcript:

© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 7 – Budgeting and Cost Estimation

© 2006 John Wiley and Sons, Inc. Overview Estimating Project Budgets –Top-down –Bottom-up Work Element Costing Budget Iteration Activity Budgets Continuous Budget Improvement

© 2006 John Wiley and Sons, Inc. Budgeting and Cost Estimation The budget serves as a standard for comparison It is a baseline from which to measure the difference between the actual and planned use of resources Budgeting procedures must associate resource use with the achievement of organizational goals or the planning/control process becomes useless The budget is simply the project plan in another form Chapter 7-1

© 2006 John Wiley and Sons, Inc. Estimating Project Budgets In order to develop a budget, we must: –Forecast what resources the project will require –Determine the required quantity of each –Decide when they will be needed –Understand how much they will cost - including the effects of potential price inflation There are two fundamentally different strategies for data gathering: –Top-down –Bottom-up

© 2006 John Wiley and Sons, Inc. Top-Down Budgeting This strategy is based on collecting the judgment and experiences of top and middle managers. They estimates overall project cost as well as the cost of the major subprojects. These cost estimates are then given to lower level managers, who are expected to continue the breakdown into budget estimates This process continues to the lowest level

© 2006 John Wiley and Sons, Inc. Top-Down Budgeting Advantages: –Aggregate budgets can often be developed quite accurately –Budgets are stable as a percent of total allocation –The statistical distribution is also stable, making for high predictability

© 2006 John Wiley and Sons, Inc. Top Down Budgeting –Small yet costly tasks do not need to be individually identified. The experience and judgment of the executive accounts for small but important tasks to be factored into the overall estimate. i.e., it is not ignored.

© 2006 John Wiley and Sons, Inc. Bottom-Up Budgeting In this method, elemental tasks, their schedules, and their individual budgets are constructed following the WBS or project action plan The people doing the work are consulted regarding times and budgets for the tasks to ensure the best level of accuracy Chapter 7-5

© 2006 John Wiley and Sons, Inc. Bottom Up Budgeting Initially, estimates are made in terms of resources, such as labor hours and materials Bottom-up budgets should be and usually are, more accurate in the detailed tasks, but it is critical that all elements be included

© 2006 John Wiley and Sons, Inc. Bottom-Up Budgeting Advantages: –Individuals closer to the work are apt to have a more accurate idea of resource requirements –The direct involvement of low-level managers in budget preparation increases the likelihood that they will accept the result with a minimum of aversion –Involvement is a good managerial training technique, giving junior managers valuable experience (??) Chapter 7-6

© 2006 John Wiley and Sons, Inc. Bottom up Budgeting Top-down budgeting is very common True bottom-up budgets are rare ( Disadvantages) –Senior managers see the bottom-up process as risky –They tend not to be particularly trusting of ambitious subordinates who they fear may overstate resource requirements –They are reluctant to hand over control to subordinates whose experience and motives are questionable Chapter 7-7

© 2006 John Wiley and Sons, Inc. Work Element Costing The actual process of building a budget - either top-down or bottom-up - tends to be a straightforward but tedious process Each work element in the action plan or WBS is evaluated for its resource requirements, and then the cost Direct costs for resources and machinery are charged directly to the project. Labor is usually subject to overhead charges. Material resources and machinery may or may not be subject to overhead. There is also the General and Administrative (G&A) charge Chapter 7-8

© 2006 John Wiley and Sons, Inc. An Iterative Budgeting Process Resource estimates and actual requirements are rarely the same for several reasons: –The farther one moves up the organizational chart, the easier, faster and cheaper the job looks –Wishful thinking leads the superior to underestimate cost (and time) because the superior has a stake in representing the project as a profitable venture Chapter 7-9

© 2006 John Wiley and Sons, Inc. An Iterative Budgeting Process IN AN IDEAL WORLD!!! –Usually the initial step toward reducing the difference between the superior’s and the subordinate’s estimates is made by the superior –The superior agrees to be “educated” by the subordinate in the realities of the job –The subordinate is encouraged by the superior’s positive response and then surrenders some of the protection of the budgetary “slop” –This is a time consuming process, especially when the project manager is negotiating with several subordinates Chapter 7-10

© 2006 John Wiley and Sons, Inc. Category/Activity Budgeting vs. Program Budgeting The traditional organization budget is either category oriented or activity oriented Often based upon historical data accumulated through an accounting system With the advent of project organizations, it became necessary to organize the budget in ways that conformed more closely to the actual pattern of fiscal responsibility Chapter 7-11

© 2006 John Wiley and Sons, Inc. Category/Activity Budgeting vs. Program Budgeting Under traditional budgeting methods, the budget could be split up among many different organizational units This diffused control so widely that it was almost nonexistent This problem gave rise to program budgeting which alters the budgeting process so that budget can be associated with the projects that use them Chapter 7-12

© 2006 John Wiley and Sons, Inc. Program Budgeting Program budgeting aggregates income and expenditures across programs (projects) Aggregation by program is in addition to, not instead of, aggregation by organizational unit These budgets usually take the form of a spreadsheet with standard categories disaggregated into “regular operations” and charges to the various projects Chapter 7-13

© 2006 John Wiley and Sons, Inc. Program Budgeting Project Budget by Task and Month Chapter 7-14 Task I J Estimate Monthly Budget (£) A B C D E F G H I J

© 2006 John Wiley and Sons, Inc. Activity-Oriented Budgets

© 2006 John Wiley and Sons, Inc. Improving the Process of Cost Estimation There are two fundamentally different ways to manage the risks associated with the chance events that occur on every project: –The most common is to make an allowance for contingencies - usually 5 or 10 percent –Another is when the forecaster selects “most likely, optimistic, and pessimistic” estimates Chapter 7-15

© 2006 John Wiley and Sons, Inc. Funding Non profitable Projects There are several reasons that firms would choose to fund a project that is not profitable: –To develop knowledge of a technology –To get the organization’s “foot in the door” –To obtain the parts or service portion of the work –To improve a competitive position –To broaden a product line or a line of business Chapter 7-16

© 2006 John Wiley and Sons, Inc. Learning Curves Studies have shown that human performance usually improves when a task is repeated In general, performance improves by a fixed percent each time production doubles More specifically, each time the output doubles, the worker hours per unit decrease to a fixed percentage of their previous value That percentage is called the learning rate The project manager should take the learning curve into account for any task where labor is significant Chapter 7-17

© 2006 John Wiley and Sons, Inc. Other Factors (reason of failure) Anywhere from about three-fifths to five-sixths of projects fail to meet their time, cost, and/or specification objectives There are several common causes: Arbitrary and impossible goals Scope creep Wildly optimistic estimates in order to influence the project selection process Changes in resource prices Failure to include an allowance for waste and spoilage Bad luck Chapter 7-18

© 2006 John Wiley and Sons, Inc. Types of Estimation Error There are two generic types of estimation error: –Random error - where overestimates and underestimates are likely to be equal –Bias - a systematic error where the chance of overestimating and underestimating are not likely to be equal Chapter 7-19