City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.

Slides:



Advertisements
Similar presentations
Public Informational Meeting North Street Wood Avenue to St Joseph Avenue Plan no Project Nos , , & City of Marshfield,
Advertisements

Hot Springs Public Meeting Reconstruction of US 18 & US 385
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
THE “INs AND OUTs” OF ALLEYS FOR THE CITY OF HOUSTON.
Evaluation of Private Property I/I Sources for Sanitary Sewer Evaluation Study City of Grand Rapids – E. Leonard Heights Area Presenter: Jay Zawacki, CDM.
2009 Wyoming Street and Utility Improvements Neighborhood Informational Meeting December 18, :00 P.M. – 8:00 P.M. 6:00 P.M. – 8:00 P.M. Mark A. Erichson,
South Maple Street Sanitary & Storm Sewer System Improvements Project October 14, 2014.
EA204 Environmental Technology Pavement Drainage Stormwater Sewer Design.
Welcome Learn more about upcoming construction activities on Cedarvale Avenue and Oak Park Avenue View display boards and speak one-on-one with staff Building.
2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
6 th Street Water Main And Street Reconstruction 2013.
Welcome to the Plumb Lane 2 nd Community Workshop November 28, 2011.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
S.R. 1 Intersection Improvement Project Wells County Public Library, Bluffton, IN 6:00 p.m. Presentation Thursday, April 24, 2014.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
Borough of Madison Samson Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Federal Aid SRTS Application Reconstruction.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 3 / South State Street Added Auxiliary Lanes Project in North Vernon Wednesday, June 29, :30pm Presentation Jennings County High School.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Golden Triangle Blvd. Progress Report March 27, 2007.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Air Estates/Bald Eagle Estates) Improvement Project December 13, 2010.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
SR 1 BLUFFTON Public Hearing September 25, INDOT Mission: INDOT will plan, build, maintain and operate a superior transportation system enhancing.
Neighborhood Meeting Falcon, 124 th, Europa, 126 th, Gallivan (Lake Aires Estates/Bald Eagle Estates) Improvement Project October 11, 2010.
38th ½ Street Improvements (between Grayson and Airport) Group 10: Jordan Alvarez Emily Tat Charles Yamashiro.
Phase 2: 30% Design Plans September 4 th, 2012.
Quality Avenue “Safe Streets” Improvements City of Lakeland, Minnesota Paul Pinkston Hamline University August 18, 2015.
Whitney Park East Annual Meeting October 18 th, 2011.
STA Safety Project PID #76439 December 12, 2006.
Outline  Board Direction  Tasks Completed  Recommendation.
PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
PUBLIC INPUT SESSION NOVEMBER 10, 2015 City of Asbury Birchwood Drive Reconstruction Project.
RECONSTRUCTION OF MONTGOMERY STREET Capital Improvements Budget Committee March 24, 2015 Hilary Holmes, Planning & Economic Development (PED)
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Proposed Budget Amendments Disposition of $410,745? 9/8/2010Strohmaier Budget Proposal.
City of Belmont Pavement Reconstruction Project October 15, 2014.
ITEM 9B Authorize a Commercial Developer Agreement with Keller Watermere, L.P., for South Village at Watermere, located south of West Southlake Boulevard.
To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd.
Comprehensive Thinking and Planning
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
City of Johnston East of Merle Hay Road Infrastructure Improvements Council Meeting – NW 55 th Avenue Street Special Assessment February 17, 2015.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
Proposed Storm Water Utility Fee July Proposal for future Drainage Improvement: Faith Presbyterian Church Estimated Cost: $35, *Install three.
Presented by Kelsey Lang, Planning Associate June 27, 2016
2nd Street Drainage and Paving Improvements
Town of Brighton, Department of Public Works
City of Johnston East of Merle Hay Road Infrastructure Improvements
Location Map.
DICKINSON AVENUE RECONSTRUCTION
IA 122 RECONSTRUCTION PRE-BID MEETING
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
SW Gage Blvd - Street Repair Project
SE 12th Street Roadway Improvements February 8, 2005.
PROJ. 566(17) LOR PID MAJOR WIDENING
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
1200 West Widening and Reconstruction Project
Walker Street Reconstruction Project 25% Design Public Hearing
Larimer County: engineering
Presentation transcript:

City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane Turner Drive Sidewalk Assessment District-2010 Pflaum Road to 200’ North

City of Madison Engineering Division Outline Existing Conditions Proposed Improvements Construction Assessment Policy Questions

City of Madison Engineering Division Existing Conditions Street ItemValue Last Surfaced1958 Pavement Rating5 Curb Rating0 Width32’ (Pflaum to Tompkins) 31’ (Joylynne to Herro)

City of Madison Engineering Division Existing Conditions Utilities WaterInstalled 1950 to T/BlGr 6” SPCI_UL Sanitary SewerInstalled 1955 by T/BlGr 8” VP main Storm Sewer Installed ” RCP in rear yard E of Joylynne N of Douglas 36” CMP in rear yard E of Joylynne S of Douglas 36” CMP on Douglas

City of Madison Engineering Division Proposed Improvements Street –Install concrete curb & gutter and new pavement –Install sidewalk on both sides of Joylynne from Pflaum to Douglas and on east side of Joylynne from Douglas to Tompkins –Install sidewalk, on Turner Ave, from Pflaum to bus stop –Replace rural type roadway with urban roadway Water –Replace main w/ 8” Ductile Iron –Replace services and curb stops, relocate curb stops within ROW and not on private property.

City of Madison Engineering Division Proposed Improvements Sanitary Sewer –Spot repairs –Lateral replacement if requested by property owner Storm Sewer –Extend 24” pipe, installed on Camden Rd in 2010, along Pflaum Rd to Joylynne Drive. Upsize to 36” between Maher and Joylynne on Pflaum –Continue down Joylynne, upsize 36” to 42” between Pflaum & Douglas –Install 36”-48” on Douglas between Herro and Joylynne

City of Madison Engineering Division Proposed Improvements –Extend 12” on Douglas, from Joylynne/Douglas to East to pick up existing backyard pipe between Joylynne & Maher –Install 60”, on Joylynne, from Douglas to Tompkins, connecting to 60” pipe at Joylynne/Tompkins in –Leave backyard storm in place, but will take only flow from private connections.

City of Madison Engineering Division What storm runoff problems does this project help address? oFlooding at Camden/Linda Vista oFlooding at Douglas/Herro oDeteriorating CMP backyard storm sewer between Joylynne & Maher oErosion at pavement edges

City of Madison Engineering Division Flooding at Camden/Linda Vista

City of Madison Engineering Division Camden/Linda Vista oExisting outlet to Stoughton Road (behind Farm & Fleet) inadequate capacity, silts in, difficult access. oLooked at whole neighborhood in ‘90’s, decided to bring flow to the south. 60” pipe stubbed at south end of Joylynne for future connection. oLast year’s Camden project stubbed pipe at Camden/Pflaum, but need to build “the missing link”

City of Madison Engineering Division Flooding at Douglas/Herro

City of Madison Engineering Division Flooding at Douglas/Herro

City of Madison Engineering Division Flooding at Douglas/Herro

City of Madison Engineering Division Douglas/Herro oPictures from 1991 oThis project would allow us to increase capacity of downstream storm sewer system as well as install inlets with greater capacity. oWould allow for potential future extension of storm sewer toward the west.

City of Madison Engineering Division CMP Backyard Storm Sewer

City of Madison Engineering Division Backyard CMP oDeteriorating Condition oUndersized (36” vs. 60”) oThis project would allow us pick up the flow into this main at Pflaum Road and reroute to street, leaving only very minor flow (1 private connection) in concrete backyard main, and no flow in CMP.

City of Madison Engineering Division Construction Scheduled to begin late April 2011 –Expected to last until mid-Summer 2011 Traffic –Pflaum Rd will maintain 2-way traffic –Joylynne &Douglas will be open to local traffic –Access to driveways will be maintained, as much as possible. Up to 20 days without access to allow for curb, sidewalk and drive apron const.

City of Madison Engineering Division Trees Limit construction around trees –Hand-form curb –Work with owners for sanitary lateral locations Trees were reviewed, with Forestry, to assess impact of construction on trees. 55 existing trees and 1 stump. Anticpate removal of 16 trees and the stump due to construction or existing poor condition. Up to 5 trees could be saved but would require a 4-5’ PLE from homeowner.

City of Madison Engineering Division Assessment Policy Owner –100% curb & gutter, sidewalk, aprons –Cost equivalent to 4’ of roadway –Assessment Policy adopted in 2001, reduced property share from 14’ of roadway to 4’. –Res ID No –25% sanitary lateral, only when replaced in conjunction with street construction or sanitary main replacment. City pays all remaining items

City of Madison Engineering Division Questions???