Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting Liverpool, 28 August 2013 LAV construction & installation status.

Slides:



Advertisements
Similar presentations
GUIDELINES FOR THE PACKAGING AND TRANSPORTATION OF INSERTS & SUPPLEMENTS The printer must ensure that all inserts are free from set-off and that the ink.
Advertisements

FF-650 Repair Procedure—CMP 30 Frame Reason for Repair—CMP 30 models with Serial Numbers in the range of 2453 through 3354 in Lot 9587, 0008 through 0120.
MP Prototype 2 1IWF-EXP/ÖAW GRAZ  Smaller Size  Outcome of the test results with MP-P1 was the need for a reduced cross section  Rectangular Shaped.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 25 May 2011 Overall.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Stability of Mechanical Systems S. Sharma and V. Ravindranath.
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
Chamber Construction QC at CIEMAT B. de la Cruz CIEMAT (Madrid) CMS Week June 2002.
Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 December 2013 LAV construction & installation status.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
ICARUS Cold Vessels Thermal insulation Project progress report.
LAV construction status Matthew Moulson (Frascati) NA62 Photon-Veto Working Group Meeting CERN, 27 May 2009.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
Tracker QA Paul Kyberd Quality Assurance A status report: A procedure for ensuring the quality of the finished tracker has been designed following our.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
15 October 2013 CHANTI Status Report F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino Università.
LAV damage and repair – M. Moulson (Frascati) – Photon Veto WG – CERN – 5 April 2011 Damage to A3 during transport 2 10 blocks were broken during transport.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
LAV Software Status Emanuele Leonardi – Tommaso Spadaro Photon Veto WG meeting – 2015/03/24.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
FETS meeting Beam Profile Measurement Tank By P. Savage 13th June 2007.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 14 December 2010.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 23 May 2012 Notes on A8 transport 2 ShockLog malfunction: fresh batteries consumed.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 July 2012 LAV construction & installation status.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
Lav meeting F. Raffaelli INFN – Sezione di Pisa C. Capoccia LNF, A. Cecchetti INFN – Sezione di Frascati CERN, Dec13 th, Feet friction studies. -Installation.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Update on CHANTI F.Ambrosino, M.B. Brunetti*, F. Canfora*, T. Capussela**, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 4 June 2013 LAV construction & installation status.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – Siena – 28 August 2012 A11 transport 2 Departure for CERN 24/07 with delivery originally.
LAV HV repair status – M. Moulson (Frascati) – Photon Veto WG – CERN – 09 February 2016 Vaqtec feedthoughs with PEEK base 2 Air side Vacuum side 3 prototypes.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
Pinhole Camera.
SPL RF coupler: integration aspects
LAV HV repair plans Matthew Moulson
Service channels between Tracker and PP1
Roadmap for triplet cryostats
Service channels between Tracker and PP1
NA62 LAV Anti1 REMOVAL & TESTS
Manufacturing of the first FCC-hh beam screen prototype for ANKA
CNGS horn / reflector in 2005: The story of the glass ring insulator
NPS mechanical design 01/31/2019 Jlab meeting
Presentation transcript:

Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting Liverpool, 28 August 2013 LAV construction & installation status

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June 2013 A10 at a glance: Where we stand 2 2 layers installed; cabling of layer 2 in progress

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June Considerations for A10 Vessel arrived at Frascati 12 Jul with significant construction delays Layers 3 and 2 installed – currently cabling layer 2 All blocks and bananas ready for installation A10 ready for shipping by beginning of October Signal flange missing! Loaned to CHANTI – currently mounted on vacuum chamber in ECN3 3 signal connectors apparently leak Needs to be fixed and brought back to Frascati ASAP

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June A9 transport Standard packaging procedures: rock wool insulation + thermal blankets Exceptionally good thermal stability Alarm from thermal blanket at 35°C – alarm set point too low ShockLog data recorders work will with 3.6 V LiSOCl 2 batteries Storage in Gran Sasso night before transport Start of transport Mont Blanc tunnel Repeated alarms afternoon of 18/06 Recorders dismounted − vessel − truck

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June A9 transport Acceleration data [g] − transverse − longitudinal − vertical Truck Vessel Loading Storage Transport Offloading No suprises!

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June 2013 A12 wrapping: Conclusions from last time 6 Current status: Verified that material can be laser cut Ordered 2m sample cut from roll to develop wrapping technique Next steps: Try to wrap a block with new samples, fewer seams Compare count rates to block with original OPAL wrapping Need to develop test stand for light-tightness tests in production Need to develop block-processing techniques with a mind to minimizing scuffs and tears Will almost certainly need to provide an additional layer of light tightness by closing or draping the A12 volume

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June 2013 Trial wrapping for A12 7 Obtained 810 mm × 2 m sample of dyMat T to make trial wrapping with 1-piece template

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June 2013 Trial wrapping for A12 8 Critical issue for wrapping: sealing to stainless steel mounting flange Tape and/or wrapping material cannot occupy area on top of flange Surface must be flush with A12 frame for mechanical precision Reinforcement plates create small channels at corners of block where light can enter Attempted solution: 1.Tightly wrap reinforcement plates with black tape to create inner layer 2.Seal wrapping to inner layer of black tape with more black tape Must test to verify light tightness

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June 2013 A12 wrapping patterns for laser cutting 9 Single-piece wrapping: 190 covers/100-m roll 2 rolls needed - 40 m left over Two-piece wrapping: 350 covers/100-m roll 1 rolls needed – 15 m left over Plan to make 300 covers dyMat T available in rolls: 810 mm x 100 m = 81 m 2 Cost: €9/m 2 = €729/roll

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June 2013 Summary 10 A9 transport successful A10 ready for shipping by beginning of October Urgently need to repair missing A10 signal flange and deliver to Frascati Progress on A12 wrapping, but various aspects still need work: Final details for cut-out pattern (e.g. 1 piece or 2) Assembly tools and procedure Test stand for light leaks and test procedure Local meeting at Frascati next week to discuss A12 wrapping

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June 2013 Notes on wrapping for A12 11 A12 wrapping must: Provide light tightness for operation in ambient light Present a (diffusively) reflective surface to interior of glass Separate black and white wrappings can be used if necessary, but a single laminate would be a simpler solution Be resilient against scuffs and tears Be able to be folded around the block Usually means the material has to be thin Be able to be laser cut, ideally Commercial solution: dyMat T (Coveme, Italy) 37.5 μm black PVF + 75 μm PET μm white PVF Not halogen free, requires a safety derogation Good opacity Effectiveness of 37.5 μm black PVF (Tedlar) well established Reasonable price: 810 mm x 100 m roll = 81 m 2 ~ €700 Total thickness ~175 μm: Somewhat difficult to crease, but possible

LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 4 June 2013 Validation of wrapping material 12 Try to wrap a block using A4-size samples Initial observations: Bad idea to try to tape together A4 sheets to do this Photo tape will never work – need derogation request for PVC tape Try to measure count rates with oven (scaler_main) and oscilloscope, with various lights shining on block About 300 Hz with 6 mV threshold (oven), but not highly reproducible Dark rate in closed oven ~ 1-3 Hz Conclusion: material is probably sufficiently light tight, but need to develop high-quality, reproducible wrapping procedure