ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
22 September 1998 LAr WeekM. Lefebvre Signal Feedthrough Progress Report Pin Carriers FEA Update Presented by Terry Hodges TRIUMF and University of Victoria.
EMB PAR, 23 nov P. Perrodo, LAPP, Annecy1 ATLAS EMB SERIE MODULE CABLING Experience started with three successive prototype modules (module 0) in.
Forward scintillators in ATLAS: cryostat and MBTS CERN Dubna Michigan State University University of Texas-Arlington presented by J. Huston Michigan State.
Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Improvements for next parts PIMS production meeting February 2013 Rolf Wegner.
LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Challenges and Overview From Technical Coordination 27/08/2013 -FH1.
19 May 1999 LAr WeekM. Lefebvre Endcap Signal Feedthrough Steel Order –Order fully coordinated with BNL –The order was ready to go Monday May 10th to lowest.
ASSO HEC 2001 Organisation & Responsibilities Chris Oram Oct 2001.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
Signal Feedthrough Progress Report New FEA Results on Pin Carriers Vacuum Cable Development in Canada Leak Test Station and Assembly Station in Victoria.
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report April 26, 2001 N. Hartman, E. Anderssen, M. Gilchriese, F. Goozen, T.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
EuCARD WP 7 – High Field Magnets Task – Radiation certification Status report EuCARD WP 7 – High Field Magnets Task 2 – Support studies Task
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
Dec
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Installation of the T600 at Fermilab CSN2, September 22,
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box & Capacitor Status Chiho Wang Duke University.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
Single Phase ProtoDUNE TPC QA/QC Plans The SP TPC Team Jan. 13, 2016.
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
ELENA installation progress F. Butin / ELENA collaboration.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
1 Results of TDR Measurements in EC-C  TDR measurements  Calibration lines waveforms and parameters  Results for calibration lines  Signal lines waveforms.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Planning for Proto-DUNE PD Installation and Cabling at CERN
Teleconf ACS – FREIA 28th March 2017
Installation of the T600 at Fermilab
He Plant, LN2 Systems and Commissioing
Production at Victoria University of Victoria
Cabling for LHCb Upgrade
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Teleconference ACS – FREIA 18th April 2017
Teleconference ACS – FREIA 10th May 2017
Warm structure requirements :
Far Detector Activities Late 2017 – Early 2018
Update on development of consolidated insulation system and procedures C. Scheuerlein, 4th DISMAC meeting,
Parts exchange for HL-LHC AUP Q1&Q3
ATLAS Canada Collaboration
Teleconference ACS – FREIA 19th June 2017
ATLAS Liquid Argon Calorimeter Signal Feedthroughs
SNS PPU Cryomodule Instrumentation
Presentation transcript:

ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at CERN Feedthrough Installation Michel Lefebvre University of Victoria Physics and Astronomy ATLAS LAr week 18 November 2002

M. LefebvreATLAS LAr week, 18 Nov Overview VCR Glands Heater and T probes Ambient Flange Bolt Ring (not shown) to attach to warm vessel Bellows Seal Ring Pin Carriers Bellows Bellows Cuff Ring Vacuum Cables Cold Flange Cold Box or Funnel Pigtail Cables 1920 channels to detector patch panels in the cryostat CF Flange for tests Funnel cut here before welding on cold vessel bi- metallic junction Seal ring OD = mm Total height = mm

M. LefebvreATLAS LAr week, 18 Nov Responsibilities Design Fabrication  Signal Pigtails purchased from Orsay Commissioning Transport Reception  Electrical and ambient vacuum testing  Leak tester provided by ATLAS CERN Electrical tests after installation Assistance during installation  Assistance during welding on the cryostat  Manpower to connect warm cables to ambient flange

M. LefebvreATLAS LAr week, 18 Nov Pin Carrier Procurement Summary JAN01 FEB02 special thanks to Tom Muller

M. LefebvreATLAS LAr week, 18 Nov Feedthrough Production Production at the University of Victoria All 55 feedthrough units produced (last on 25 Oct 2002) vacuum cable installation

M. LefebvreATLAS LAr week, 18 Nov Feedthrough Production Production at the University of Victoria All 55 feedthrough units produced (last on 25 Oct 2002) last welds last dye penetrant tests last cold test

M. LefebvreATLAS LAr week, 18 Nov Feedthrough Production Last feedthrough produced at UVic on Oct in Dec 01 we predicted 15 Oct 2002 !! radiation tests on last pigtails took place Nov 7-8. Awaiting results. The successful production of the endcap signal feedthroughs would not have been possible without the help of many…. TRIUMF (Chris, Alan, …) Orsay (Daniel, Laurent, Aboud, Pierre, Christophe, …) BNL (Howard, David, Dave**2, Tom, Bob, Ken, …) CERN (Pierre, Allain, Patrick, Martin, …) UBC (Dave, electronics shop) UVic (Physics and Astronomy Dept, machine and electronics shops)

M. LefebvreATLAS LAr week, 18 Nov Quality Assurance / Quality Control QA/QC was critical to the success of the project Very detailed document available (QA/QC version 5, Mar 02) All information stored in a purpose-built database material traceability production and reception test results available on the web:

M. LefebvreATLAS LAr week, 18 Nov Quality Assurance / Quality Control production status summary

M. LefebvreATLAS LAr week, 18 Nov Quality Assurance / Quality Control cross talk measurements at UVic and at CERN

M. LefebvreATLAS LAr week, 18 Nov Quality Assurance / Quality Control resistance measurements at UVic

M. LefebvreATLAS LAr week, 18 Nov Shipment to CERN crated feedthroughs last produced feedthrough in crate (Oct 2002) Each feedthrough has its own crate 4 feedthrough crates are then crated together for shipment 50 feedthrough units now at CERN remaining 5 to be shipped as soon as new pigtail connector material has passed irradiation pollution tests

M. LefebvreATLAS LAr week, 18 Nov Reception Tests at CERN Feedthrough units are tested upon reception at CERN: visual inspection leak test (ambient temperature) electrical test (cross-talk) The electrical testing equipment will also be used on the cryostat after feedthrough installation 46 units tested at CERN, the rest to be tested soon

M. LefebvreATLAS LAr week, 18 Nov Feedthrough Installation The endcap signal feedthrough are very important and expensive components of the LAr system ECC: 16 standard, 4 special, 4 HEC, 1 FCAL = 25 ECA: 16 standard, 4 special, 4 HEC, 1 FCAL = 25 Others: 3 standard, 1 special, 1 HEC = 5 They are handed to ATLAS tested and clean There are 4 types of endcap feedthroughs. There are very few spares and very few spare parts (except pin carriers). We only have 3 spare FCAL pigtails. One damaged pigtail = a feedthrough to rebuild at UVic More than 3 damaged FCAL pigtails = 6 months delay for LAr We now have less resources to build feedthroughs.

M. LefebvreATLAS LAr week, 18 Nov Feedthrough Installation Two persons at CERN for assistance during installation foresee 1.5 months for installation on ECC foresee 1.5 months installation on ECA about 1.5 months for warm cable installation and final electrical tests Special testing equipment has been developed for the warm cable insertion bent pin indicator (to give early warning of bent pins while installing a warm cable) a short-to-ground indicator a cross-channel-short indicator (to check for cross-channel shorts in the warm cable after installation) a pigtail ATI / baseplane interface for use during the post-installation cross talk tests (BNL was using a warm cable for their TDR test interface, which caused problems since the warm cables are not designed to stand up to many plugins)