Refurbished Booster RF John Reid December 12, 2012.

Slides:



Advertisements
Similar presentations
Months of the year December January November October February
Advertisements

DOT 1 January , 1990 DOT 2 July 23 - August 3, 1990.
Chubaka Producciones Presenta :.
Fermilab New Tuner J. Reid M. Slabaugh August 6, 2014 J. Reid 1.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
January 2012 Monday Tuesday Wednesday Thursday Friday Sat/ Sun / /8 14/15 21/22 28/
/3024/ SUN MON TUE WED THU FRI SAT JANUARY 2011 February 2011 SMTWTFS
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Chicas, este calendario si es pa' nosotras !!!!!.
Fermilab Cavity Refurbishment Status J. Reid M. Slabaugh November 19, 2014 J. Reid 1.
6/23/11 FAIS,LLC Five Apple/Inpatient Specialist Case Study Patient Volume/LOS/ Payor Source Data.
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSAT/SUN Note: You can print this template to use as a wall calendar. You can also copy the slide for any month to add.
2007 Monthly Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.

Fermilab Booster Cavity Temperature Measurements – 15Hz Operation January 28, 2015 J. Reid 1.
Booster 15Hz Operation John Reid March 4, Fermilab March 4, 2014J. Reid 2 Scope Brief History of Booster RF systems RF system description Modifications.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Refurbished Booster RF John Reid October 24, 2012.
Calendar for 2011 Months of the Year with Holidays.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Agenda MC Aug 13.
Safety Department Fire Drills.
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
TIMELINES PHOTOS This is an example text
TIMELINES PHOTOS This is an example text
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
13-block rotation schedule
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
The SAT will be given at ECHS on the dates below!
McDonald’s Kalender 2009.
January Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
January MON TUE WED THU FRI SAT SUN
McDonald’s calendar 2007.
1 - January - Sun Mon The Wed Thu Fri Sat
Teacher name August phone: Enter text here.
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
The Transformation of A Small Company Into A Golden Legend
Tropical cyclones movement
February 2007 Note: Source:.
| January Sunday Monday Tuesday Wednesday Thursday Friday
January MON TUE WED THU FRI SAT SUN
MONTHS OF THE YEAR January February April March June May July August
S M T W F S M T W F
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
McDonald’s calendar 2007.
PLAYMATES LEARNING CENTER CALENDAR
1 January 2018 Sun Mon Tue Wed Thu Fri Sat
Habitat Changes and Fish Migration
January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30 31
2015 January February March April May June July August September
Habitat Changes and Fish Migration
S M T W F S M T W F
S M T W F S M T W F
Presentation transcript:

Refurbished Booster RF John Reid December 12, 2012

f Fermilab 4 Booster Cavities Refurbished to Date –S/N 2002 – Removed St 8 – August 2011 ? Refurbishment started – August 26, 2011 Refurbishment completed – February 2012 Electrical testing completed – March 5, 2012 Installed in tunnel – April 2, –S/N 1011 – Removed St 7 – May 21, 2012 Refurbishment started Refurbishment completed – June 6, 2012 Electrical testing completed – July 18, 2012 Installed in tunnel - –S/N 1008 –Removed St 5 – June 14, 2012 Refurbishment started June 2012 Refurbishment completed Sept 6, 2012 Electrical testing completed Sept 24, 2012 Installed in tunnel – November 14, 2012 –S/N 1017 – Removed St 6 – June 14, 2012 Refurbishment started – September 17, 2012 Refurbishment completed – October 29, 2012 Electrical testing completed – November 13, 2012 Installed in tunnel – November 14, 2012 December 12, 2012John Reid2

f Fermilab Summary Cavity S/NRadiation Tin ShimsRework Cone CoolingVacuum Class0.005FlangesConfigWork 20022YesNoParallelYes 10113Yes3SeriesNo 10083Yes3SeriesNo 10172Yes3SeriesNo December 12, 2012John Reid3

f Fermilab Tuner Stem Temperatures December 12, 2012 John Reid4 Cavity S/NCavity running on standard Booster curve at 15 Hz TunerAnode Stem Temp F15 kV18kV21 kV23.5 kV 2002 Back - Label Back - Probe Bottom - Label Bottom - Probe Front - Label Front Probe Back - Label Back - Probe Bottom - Label Bottom - Probe Front - Label Front Probe Back - Label Back - Probe Bottom - Label Bottom - Probe Front - Label Front Probe Back - Label Back - Probe Bottom - Label Bottom - Probe Front - Label Front Probe

f Fermilab December 12, 2012 John Reid5 Fitting stem to cavity center flange

f Fermilab December John Reid6

f Fermilab December 12, 2012John Reid7 Stem to cavity interface problem Area marked where stem does not fully contact cavity surface

f Fermilab December 12, 2012John Reid8 Finished flange after resurfacing Partial flange facingAdded weld material to flange surface

f Fermilab December 12, 2012 John Reid9 Original cavity flange surface Added weld material to flange surface Finished flange after resurfacing

f Fermilab December 12, 2012 John Reid10 Original cavity flange surface Added weld material to flange area Finished flange after resurfacing

f Fermilab December 12, 2012 John Reid11 Finished mating Flange on Cavity Finished tuner Flange

f Fermilab CONCLUSION December 12, 2012 John Reid12 4 Cavities refurbished, tested, & installed Between 50 % to 70 % of the cones had to be stripped and rebuilt due to burnt or damaged fingers. Cavities from stations 1 and 3 (which will be cavities 5 & 6 to be refurbished) have been pulled from beam line and are waiting to be worked on.