1 Sasha Milov DC meeting Nov 9, 2005 HBD upgrade status. Sasha Milov Nov 09, 2005.

Slides:



Advertisements
Similar presentations
Prototype Progress… The Stony Brook Crew & Bob Azmoun, Craig Woody.
Advertisements

1 Stony Brook Update Getting Serious about HBD East T.K. Hemmick for the Tent Crew.
LAPPD status report. 6cm system status  System up and running since July –Temperature profile carefully mapped out in sealing and deposition chambers.
Tent Update 5 Feb 2008 Matt Durham for tent crew.
CsI Photocathode Production and Testing
01/07/08I. Ravinovich1 HBD Update Ilia Ravinovich DC Meeting, January 9, 2008.
1 HBD Update Itzhak Tserruya DC Upgrades meeting HBD, BNL, July 13, 2005 Prototypes  Full scale HBD  Readout board  FEM Final detector  HBD Design.
HBD Tasks Outline Thomas K Hemmick. New News  Second good QE result from Bob.  New quotes on reduced Glove Box:  $39,000 will not work (air lock too.
1 Sasha Milov DC meeting Dec 7, 2005 HBD upgrade status. Sasha Milov Dec 07, 2005.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
1 Searching for the QGT: Quantum Efficiency Gain Transparency TK Hemmick for the HBD Crew.
HBD Meeting 3/14/06 B. Azmoun BNL Testing and Preparation of HBD Full Scale Prototype for Upcoming Engineering Run Puzzling Behavior of GEM’s To Do List.
1 Stony Brook Update Stretching your LEGS T.K. Hemmick for the tent crew.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
Preliminary Results from a Trial Beam Test of the Small HBD Prototype at LEGS Bob Azmoun BNL HBD Working Group Meeting May 10, 2005.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
Sasha Milov HBD upgarde Feb 8, Assembly and testing facility. Sasha Milov Feb 8, 2005 Glove Box Other needs Testing.
1 HBD Update Setback via Gas Accident T.K. Hemmick for the HBD Crew.
1 Update on SB The Stony Brook Crew. 2 QE Reproducible in Addn’l Test Excellent QE again (basically identical). Excellent QE again (basically identical).
1 Stony Brook Update: Keep It Clean T.K. Hemmick for the Tent Crew.
1 HBD Plans for run-6 Itzhak Tserruya DC meeting, BNL, October 12, 2005 HBD status Plans for run 6 ( Back-up: details presented in Upgrades meeting yesterday)
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Sasha Milov EC/DC meeting March 9, Assembly and testing facility. Sasha Milov March 9, 2005 Sequence of operations Glove Box Evaporator Other needs.
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
12/Dec/2012SBS-Meeting1 of 24 Status of the Front Tracker GEM and INFN Electronics 2012 – Dec – 12 SBS Weekly Meeting GEM Assembling SRS – INFN Electronics.
1 Progress on Cathodes Thomas K Hemmick, Richard Hutter, Alberica Toia, Bill Anderson, Jason Kamin.
Status of GEM T2 assembly Outline Status of the GEM components Summary Tests TOTEM Collaboration meeting CERN / Risto Orava for Kari Kurvinen.
12/12/09 MPGD 神戸大学 1 Yusuke Komatsu A B. Azmoun B, C. Woody B, K. Ozawa A University of Tokyo A,Brook Haven National Lab. B.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
Itzhak Tserruya, July 7,  Towards HBD Proposal  Ongoing activities and plans for the next two months Itzhak Tserruya HBD meeting at BNL, September.
1 Sasha Milov DC meeting... March 7, 2007 HBD status Sasha Milov March 7, 2007.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
Status Update Stony Brook Crew. Progress on Glove Box None to report. Bids still out. Have enough $$$ for big one. Expect no surprises.
6-Aug-02Itzhak Tserruya PHENIX Upgrade mini-Workshop1 Boris Khachaturov, Alexander Kozlov, Ilia Ravinovich and Itzhak Tserruya Weizmann Institute, Israel.
HBD Status Craig Woody BNL DC Meeting October 3, 2007.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Itzhak Tserruya, BNL, May13, HBD R&D Update: Demonstration of Hadron Blindness A. Kozlov, I. Ravinovich, L. Shekhtman and I. Tserruya Weizmann Institute,
HBD Status Report C. Woody For the HBD Crew DC Meeting June 13, 2007.
HBD Status for Run 10 C.Woody For the HBD Group Collaboration Meeting January 15, 2010.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
CLAS12 Drift Chamber Prototyping
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
1 Sasha Milov DC meeting Sept 12, 2007 HBD status Sasha Milov Sept 12, 2007.
1 HBD Update Back to the Future T.K. Hemmick for the HBD crew.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
1 Stony Brook Update: Another Frustrating week... However difference is isolated: CF 4 T.K. Hemmick for the Tent Crew.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
1 HBD R&D: Update Itzhak Tserruya (for A. Kozlov, I. Ravinovich and L. Shekhtman) Weizmann Institute, Rehovot DC meeting Feb. 14, 2003.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 HBD Update Itzhak Tserruya Upgrades meeting, BNL, October 11, 2005 Full-scale Prototype status Safety Review Detector box construction GEM production.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
Installation of the T600 at Fermilab CSN2, September 22,
1 HBD: Responsibilities, Cost and Schedule Itzhak Tserruya EC/DC Meeting, BNL, March 9, 2005.
Il Ring Imaging CHerenkov (RICH) detector a Jefferson Lab – Hall A.
1 HBD Update Itzhak Tserruya DC meeting, May 7, 2008 May7, 2008.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
LAPPD Device Processing: Scrubbing, Baking and Sealing Lei Xia.
1 Update from the Tent Thomas K Hemmick for the Tent People.
6/29/2016I. Ravinovich1 HBD status in Run-10 I. Ravinovich WIS.
(On Behalf of CMS Muon Group)
Dept. of Physics and Space Sciences, Florida Institute of Technology
Recirculating CO2 System
Presentation transcript:

1 Sasha Milov DC meeting Nov 9, 2005 HBD upgrade status. Sasha Milov Nov 09, 2005

2 Sasha Milov DC meeting Nov 9, 2005  Mechanical assembly  Photocathode production and measurement  Glove Box modification  GEMs testing  Electronics status  LEGS beam testProgress:

3 Sasha Milov DC meeting Nov 9, 2005  Mechanical assembly is on its way.  Some delays of order of a week were experienced in production of …  Not critical for the current scheduler.  A modification to eliminate divider boxes is considered. Allows to reduce material close to the active volume Reduces number of cables from 7 to 2 per module Reduces mechanical stress on the box Does not cause any delay  Target day to complete the mechanical part of the cage is Dec,XX 2005 Mechanical assembly. Itzhak, please verify

4 Sasha Milov DC meeting Nov 9, 2005  INFN evaporator from JLab is at SUNYSB vacuum down to 8E-8 mbarr capable to produce 4 full size at a time Q.E. control works inside the vessel Residual Gas Analyzer works inside the vessel  Produced several 10x10 cm 2 photocathodes on GEMs (previously used and washed, but fully operational)Photocathodes.  Q.E. of the photocathodes is as in the proposal (as good as it can be) controlled at SUNYSB and measured at BNL  This is a major milestone, we were trying to achieve since a while. Now we have it!

5 Sasha Milov DC meeting Nov 9, 2005  Glove Box bids came out “slightly” (x2.5-x5) higher than originally planned. These options are not considered.  Possible choice of playgrounds for the main assembly can be: INFN Glove Box, currently at SUNYSB, which would require upgrade for much less money well within MRI available budget. It would not provide all luxury we expected and may require changing in the assembly procedure. A reasonable one. A new glove box from a company for less money and with less options. Company representatives (first of them) visited SUNYSB yesterday to meet Tom and Rich. A decision is likely to be know by the end of the week.  Glove Box will require attention in next several weeks, but it will be on time for the main assembly. Glove Box modification.

6 Sasha Milov DC meeting Nov 9, 2005  First 18 GEM foils arrived at the WIS. 16 were successfully framed. one had low resistance in one sector, one was damaged in operation  6 frames were soldered with resistors. 6 were successful, 1 failed HV test, 9 were not yet soldered  2 stack of 3 GEMs were tested with 55 Fe in CF 4 for uniformity. Results are worse than reported by COMPASS. 50% gain variation is seen in both expected 25% or less investigation in on its way GEM testing.  Test box, the same as used at WIS was shipped to SUNYSB this week.  It will be used here to test GEMs after evaporation

7 Sasha Milov DC meeting Nov 9, 2005  Out of 5 boards required for HBD 1 came out of production.  It is currently is used by Chi at NEVIS.  More boards are expected by the end of the week, worst case early next week. They will be tested a.s.a.p.  No more results on that. Electronics remains critical item for HBD. Electronics status.  Backplane will be separate PCB (not a part of HBD panel) that doesn’t cost too much in the radiation length, but allows a lot of flexibility both in time and in design.  First prototype was produced. It had too much Cu deposited on it. Bo Yu was contacted to look into that. FEM FEE

8 Sasha Milov DC meeting Nov 9, 2005 LEGS beam test.  We have new (old cleaned and re-evaporated) GEM with very good photocathode (see plot above) and a stack of 3 GEMs in the vessel ready to go.  The prototype to be installed in LEGS this weekend and put under gas flow.  We might be given beam time on Monday.  Unfortunately the NSLS magnet which was recently repaired was not yet powered on. In case it fails our time will be revoked.

9 Sasha Milov DC meeting Nov 9, 2005  Mechanical assembly is on its way and is likely to be finished on time.  Very good news from INFN evaporator, best Q.E. curve in vacuum was reached. Some issues remain with that in CF 4. Is under study now.  Glove Box price is way above what we can spend. A modification of INFN box is considered with a new box of lower parameters as an alternative.  GEMs testing started with the first bunch of CERN GEMs. Gas gain non-uniformity was observed. The reason is investigated  Electronics remains critical  LEGS beam test may happen next week.Summary:

10 Sasha Milov DC meeting Nov 9, 2005 BACKUPS

11 Sasha Milov DC meeting Nov 9, 2005 Cathode Production Parameters CsI Source: –INFN group uses “pre-melted” full boats. –Changed to “broken crystal” chunks (ala D. Anderson) Heating: –System uses heating of vacuum vessel to eventually heat the cathode (60 o C). –Cylinder heated, not Nose. –New procedure: Bake during pump down (heats all including cathode) Turn off external heat prior to shot. Cathode remains hot longer…shoot! Vacuum Quality: –Run the residual gas analyzer DURING shot. –If “puff” of contamination seen during boat heat-up…wait. Vacuum Value: –8x10 -7 mbar (1 mbar = 0.76 torr) at shot. –After weekend… 8x10 -8 mbar!! (NOTE: CsI on walls helps)

12 Sasha Milov DC meeting Nov 9, 2005 Residual Gas Analyzer Observations: The vacuum has been mostly water!!! –Initially a surprise since the cryo pumps water MUCH faster than N2 or O2 (other major components). –Assumption: Walls are a source of water. Only cylinder region heated (not rectangular nose) Test: Leave pump going for the weekend monitor RGA BINGO: Overnight Friday water dropped by 3 orders!! Present vacuum is mostly H 2 (8x10 -8 mbar) All present shots done PRIOR to complete elimination of water. –Good vacuum means little water even when its mostly water. –We can only improve from previous shots. –We KNOW at all times our exact status (driving a Cadillac)

13 Sasha Milov DC meeting Nov 9, 2005 Cathode History SS: –Old CsI + air exposure (mis-wired of QE device). –Bad. GEM: –Old CsI/no air exposure. –Bad (local system and Bob). SS: –New CsI, no air, good vacuum (unknown composition). –Good (local only). GEM: (pictures are from here) –New CsI, no air, good vacuum, mostly water. –Good (local and Bob). GEM: –New CsI, no air, good vacuum, mostly water. –Good (local…send to Bob soon)

14 Sasha Milov DC meeting Nov 9, 2005 Latest result Causes for celebration: –Equally as good as Amos Breskin. –Equal to assumptions for successful GEM. –Reproducible. –Shot onto GEM. –GEM was cleaned and held voltage prior to shot. –Vacuum value and quality have only improved since this result! I told you so!

15 Sasha Milov DC meeting Nov 9, 2005 Worries about QE are over…now what? How do we MAINTAIN the good QE? Minor transfer box improvements: –Presently gravity-driven Ar fill (2” hole). –Replace hole with electrical feedthrough. No cadillac for the glove box: –Bids came in $100,000 – $200,000. –Budget $40,000 How to survive w/ lesser quality Glove Box? –DUH!!! Vacuum is MUCH better than any Glove Box! –Change procedure to minimize the exposure of cathodes to Glove Box air. –“Upgrade” INFN Glove box to make it good enough.

16 Sasha Milov DC meeting Nov 9, 2005 Procedural Modifications: Old procedure: –New cathode  GB; Cathode rejoins full stack; Gain test in GB; Stack  HBD….repeat… –Multiple openings w/ cathodes already on HBD. –Air Lock…excellent atmosphere ALWAYS required. New procedure: –New cathode  GB; Cathode rejoins full stack; Gain test in GB; Stack  HIGH VACUUM STORAGE (HVS) –When vacuum storage is full, all GEMS  HBD in a single short term operation. –Maybe don’t need airlock? –INFN Box begins to look attractive. How to implement: –Use fraction of original GB money to make HVS. –Work on INFN Glove Box to make it good enough.

17 Sasha Milov DC meeting Nov 9, 2005 INFN Glove Box IT STINKS (quite literally). –Latex gloves…overpowering smell when opened. –Butyl or Hypalon material ($200/pair…16 pairs). Re-pressurizing Dewar –Special LN 2 dewar uses internal bubbling regulator to maintain head pressure ~150 psi. –One fill lasts ~1 week. –Large Oxysorb canister…excellent gas supply. –ROUGH measurement = ppm water after weekend (with latex gloves). –Want to borrow better water/oxygen meters…

18 Sasha Milov DC meeting Nov 9, 2005 Summary The required QE is achieved and almost certainly reproducible. –The QE achievement era is over. –The QE maintenance era begins. We can lessen requirements on GB by changing procedure: –Use high vacuum storage of GEMS. –Assemble GEMS into HBD as single task. We can redirect some original GB funds to: –Establish high vacuum storage facility. –Upgrade INFN glove box.

19 Sasha Milov DC meeting Nov 9, 2005 The procedure The first step of the test is done before framing checking each HV segment of the foil. This step passed 17 out of 18 foils. The second step is testing HV segments after framing. This step passed 16 out of 17 foils, one GEM was damaged. The third step is again testing each HV segment after soldering SMD resistors. This step passed 6 out of 7 foils. The last step is testing the assembled module (triple GEM detector) in the SS vessel in CF 4 with nominal voltage and measuring the signal on each of 56 pads. So far we tested two modules. Since the two tested modules showed a big gain variations (see next slide) we paused the production in order to investigate the possible reason (s) for it.

20 Sasha Milov DC meeting Nov 9, 2005 Gain measurements Gain was measured on two modules on all 56 pads. The gain variations are quite large (~2 from min to max). Does not seem to be a mounting problem. We will measure the holes diameter under microscope. The gain strongly depends on the metal hole diameter. We will measure the gain variations on the single GEM in Ar/CO 2 using collimated source.

21 Sasha Milov DC meeting Nov 9, 2005 Q.E. in CF 4

22 Sasha Milov DC meeting Nov 9, 2005 Q.E. in CF 4