How do we know the present in-line patch panel size (25 x 25 x 2.5 cm**3) will fit in the available space? ECAL Barrel In-line optical patch panel sketch.

Slides:



Advertisements
Similar presentations
Kevin Coke ID#: Rochede Sibblies ID#: Sandrene Haughton ID#:
Advertisements

12-Jan-2009 / S.KunoriCMS HCAL / JTerm31 CMS HCAL - Hadron Calorimeter - Shuichi Kunori U. of Maryland 12-Jan-2009.
Volume.
What Is Volume ? The volume of a solid is the amount of space inside the solid. Consider the cylinder below: If we were to fill the cylinder with water.
Fisica Generale - Alan Giambattista, Betty McCarty Richardson Copyright © 2008 – The McGraw-Hill Companies s.r.l. 1 Chapter 16: Electric Forces and Fields.
1 After completing this lesson, you will be able to: Add a header and footer to a worksheet. Change margins and center a worksheet. Change the orientation.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
CERN – March 10, 2006TAN Installation Workshop - The LHCf experimentOscar Adriani The LHCf experiment Measurement of Photons and Neutral Pions in the Very.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
RBX PRR - March 1-2, H C A L HCAL RBX PRR Readout Box (RBX) PRR Dan Green HCAL Project Manager.
Anatomy of a Cabinet. Pick a cabinet now! A) A freestanding display space B) A counter section no longer than 48” (you may “cut” a counter to do this)
Example 6: Electric field on disk’s axis z Example 2 Consider a constant, vertical electric field somehow created in a limited region of space. An electron.
Graphing with SULTAN Scale Units Labels Title Axes Neatness.
Objective: find the area of geometric figures and shaded regions. What area formulas must be memorized?
LHCb Upgrade Optical Fibers from Cavern to the Surface - what has been done ? - prototypes status and next coming steps - what is missing for final installation.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Volumes Of Solids. 7cm 5 cm 14cm 6cm 4cm 4cm 3cm 10cm.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Projectile Motion - Horizontal launches The scale on the left is 1cm = 5m Draw the positions of the dropped ball every second that it is in the air. Neglect.
Wed. Feb. 11 – Physics Lecture #29 Magnetic Forces 1. Magnetic Forces on Charged Particles 2. Motion in Magnetic Fields 3. Magnetic Forces on Current-Carrying.
Vaccon Vacuum Pump 2” Diameter flexible tubing to fit inside U-Bolt (not shown) will be used to attach tubing to framework. Vaccon Inline Venturi Vacuum.
Test Beam Oriented CMSSW Tutorial Sergei Gleyzer Professor Harrison Prosper FIU CMS Workshop.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
1.To begin click: File, New, then select Design 2.Draw a circle, then use the dimension tool to set it’s size to 84 diameter or 42 radius. 3. Next draw.
Volume of a Rectangular Prism
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
Area of a circle Radius r (m) Area A (m 2 ) when r = 2.5 A = 20 (to 2sf) when A = 30 r = 3.1 (to 2sf)
Force Fields Objective: TSW understand and apply the concept of a force field by calculating the field, the force and motion of a particle in a field.
BL1U at TRIUMF UCN Beamline Septum & Dipole Magnets (April 12, 2010)
Year 9Dice. Select “New” Select “Metric” Standard (mm).ipt 1 2.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Stacking chart example -Show a chart like the one in detail information file - Stacking charts Horizontal -Limit the Height to the min and max for that.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
ADOBE INDESIGN CS3 Chapter 4 WORKING WITH FRAMES.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
MEMS for Adaptive Optics
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
Birdhouses In 2 Point Perspective.
AP Physics Summer Institute Free-Response-Questions MAGNETISM.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
A moving particle has position
Area of a Region Between 2 Curves
Service channels between Tracker and PP1
Service channels between Tracker and PP1
Gradients.
Chapter 24 Geometric Optics
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
Chamber Design and Integration RE3/1 and RE4/1
Pictures and comments from Vitali Smirnov August 2010
Tell a Story with the Data
Building Construction I
4x5 SC array for the test beam in Apr 2007
Turn to Page S.76 Describe what you know about the triangle listed to the left. What type of triangle is it? What are the labels A , B , and C ? What are.
Who do you think got more popcorn for $4.00? What is your evidence?
Dee1 View from back of back plate
Rick Salcido Northern Illinois University For CALICE Collaboration
Core Chemistry Revision Questions
Duct numbering for EE- 09/06/2008 Wolfgang Funk - CERN CMS 1 06.B 07.B
Who do you think got more popcorn for $4.00? What is your evidence?
Microsoft Windows 7 Basics
Four Jaw Collimator.
Update on POLA-01 measurements in Catania
Presentation transcript:

How do we know the present in-line patch panel size (25 x 25 x 2.5 cm**3) will fit in the available space? ECAL Barrel In-line optical patch panel sketch and considerations J. Grahl and W. Funk 23 March 2004 Questions this report addresses: What is the vertical and horizontal path of the fiber from the bottom of the patch panel box to the SM feedthrough? Will that path violate the 3cm (ideally 4cm) bending radius restriction?

Horizontal plate Inside SM 4 cm 14 cm 25 cm MEM box Feedthrough r =4 cm L = 10 cm In-line patch panel box Location of the EB In-line patch panel box and fiber route from there into the SM (not to scale). Measurements taken from design files: 2.5 cm To be determined: what protects and holds fiber in place in this region? crystals electronics fiber, patch panels, etc. Tracker HCAL

Some photos of the TK/EB mock-up in Building 186: Measurement of vertical space between inline patch panel box and MEM box (horizontal plate)…~5cm MEM box (note in the correct EB configuration this would be below the horizontal plate) Inside SM Feedthrough In-line patch panel box

The present in-line patch panel size (25 x 25 x 2.5 cm**3) will fit in the available space. Conclusions: The fiber travels out the bottom of the box, in a 4cm-radius curve, then 10 cm horizontally to enter the SM feedthrough. It is not yet known what will protect and hold the fiber in place in this region.