All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)

Slides:



Advertisements
Similar presentations
MICE Collaboration MTG IIT – Feb 2002 The Fiber Tracker Option for MICE Spectrometers The D0 Central Fiber Tracker – Experience and Implications for MICE.
Advertisements

Jin Huang Los Alamos National Lab.  Cited from March collaboration Meeting EC group Internal Communication Jin Huang 2 Preshower ID power drop significantly.
KEK beam test H. Sakamoto. Purpose To optimize a concentration of the second dopant for scintillating fibers KEK beam test to study light yields for various.
First Results from Tracker 1  Cryostat Commissioning  AFE/VLSB Firmware and Readout  Cosmic Ray Setup  Tracker Readout  Software  Trigger Timing.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Julia Sedgbeer Mice Collaboration Meeting, June SciFi Tracker – SW Status & Plans General SW status Simulation & Reconstruction Performance Studies.
Prototype Performance in D0 test stand M.Yoshida (Osaka Univ.)
KEK Analysis Report Makoto Yoshida Osaka Univ. 2006/06/10 MICE CM15.
1 Online data quality and monitoring M. Ellis Daresbury DAQ Meeting 31 st August 2005.
MICE Video MTG 9/25/2002 MICE Fiber Tracker Design Update Requirements and Proposed Detector Implementations A. Bross Fermilab.
M. Ellis - 11th February 2004 Sci Fi Cosmic Light Yield 2 views 3 views.
1 Analysis code for KEK Test-Beam M. Ellis Daresbury Tracker Meeting 30 th August 2005.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
Prototype Performance in D0 test stand & fiber intrinsic performance with KEK test beam M.Yoshida (Osaka Univ.) Osaka.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
NuMI MINOS The MINOS Far Detector Cosmic Rays and their neutrinos are being collected now. How does this work, and of what use is this data? Alec Habig,
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Main Injector at Fermilab. Silicon Vertex Tracker Integrated system of barrels and disks ~ 800k total channels.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
1M. Ellis - MICE Video Conference - 15th March 2007 Software Report  New G4MICE Users  TOF Simulation and Digitisation  SciFi Reconstruction  Tracker.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Measurement of 'intrinsic' properties of scintillating fibers H. Sakamoto Osaka University, Japan A.Sato M. Yoshida Y. Kuno Osaka Univ. K. Yoshimura KEK.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
1 SciFi Results and Comparison Malcolm Ellis, for the MICE Scintillating Fibre Group Abingdon, 31 st October 2003.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
January 22, 1999SciFi L1 Trigger Review 1 Analog Hardware Front-end Board (CTT_FE) –Transmit (and split) the VLPC signal to the Multi-chip Modules –Discriminate.
NIU Trigger Workshop CTT Commissioning Trigger Workshop October 22, 1999 WBS & Presented by Fred Borcherding for the D0 Electronics Group.
March 12, 2006R. Abrams LCWS06 Bangalore1 ILC Prototype Muon Scintillation Counter Tests Robert Abrams Indiana University.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
Tracker Summary Alan Bross MICE CM October 10, 2007.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
Don Lincoln, Fermi National Accelerator Laboratory, Instr’99, November 1999 Characterization and Performance of Visible Light Photon Counters (VLPCs)
Hongyu Fu, Trigger group The Monte Carlo for Trigger Design of BES3 Scintillating Fibre BEMC Outline: Introduction to BES3 Scin-fibre BEMC Trigger.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
SciFi Trigger Review: Physics Goals and Algorithms Kin Yip, Fermilab L1 Trigger Review, Jan. 22, 1999  Physics Ingredients  Min. P T  CFT Efficiencies.
DØ Central Tracker Replaced with New Scintillating Fiber Tracker and Silicon Vertex Detector The DØ Central Detector Upgrade The DØ Detector is a 5000.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
Noise and Cosmics in the DHCAL José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
WBS 1.2.8: AFE II Status and Plans Alan Bross for the DZero Central Fiber Tracker Group DZero Run IIb Detector Upgrade Director’s Review July 15, 2004.
SiPM for CBM Michael Danilov ITEP(Moscow) Muon Detector and/or Preshower CBM Meeting ITEP
February 24, DØ’s VLPC Detectors: The Fiber Tracker and Preshowers Greg Davis University of Rochester.
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
1 Light Yield results from the KEK tracker test using G4MICE M. Ellis Tracker Phone Meeting 25 th January 2006.
Summary of final results from MICE note: “ MICE Scintillating Fibre Tracker Prototype - First progress report - ” M.Yoshida (Osaka Univ.) for the SciFi.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
T585 analysis status 2005/12/02 HIDEYUKI SAKAMOTO This analysis was done by RUN# (+1.0 GeV/c normal beam run) For the problem of small light yield.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
The ICD Project Alan L. Stone Louisiana Tech University All D0 Meeting - 7 September 2001.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Scintillator and Fiber Test Measurements with Gluing Clas12 upgrade pcal user group May 13, 2009 Clas12 upgrade pcal user group May 13, 2009 Dustin Keller.
1 Cosmic Ray Physics with IceTop and IceCube Serap Tilav University of Delaware for The IceCube Collaboration ISVHECRI2010 June 28 - July 2, 2010 Fermilab.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
1M. Ellis - Tracker PC - 7th March 2007 VLPC Cassette Characterisation  Third application (as described in past tracker meeting and CM17) is now working.
Gamma-ray Large Area Space Telescope
PCAL Cosmic Ray Tests Progress Report C. Smith μ U V W MODULE 2
Scintillator tile- SiPM systems R&D
Efficiency Study of Prototype Scintillator for INGRID
Presentation transcript:

All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)

All DØ Meeting, 12/01/00 Optical Readout of Scintillating Fibers

All DØ Meeting, 12/01/00  discrimination of signal from Visual Light Photon Counters (VLPC) with SIFT chip: u provides trigger information u threshold of 1 photo electron (p.e.) signal anticipated (mayor challenge)  average p.e. yield measured in Lab3 cosmic ray test: 7 p.e. (with 11m light guide)  contribution of 0 p.e. and 1 p.e. peak (Poisson), i.e. inefficiency of single layer at threshold of 1.5 p.e u 7 p.e. average: 0.7% u 5 p.e. average: 4.0% u Note: CFT has doublet layers!  We cannot afford any additional light attenuation! Optical transmission from SciFi to VLPC has to be optimal! Light Yield and Trigger Efficiency

All DØ Meeting, 12/01/00  Central Track Trigger (CTT) requires a hit in all 8 axial CFT layers (8 out of 8) u for highest p-t bin (p-t > 10 GeV): 7 out of 8  MC simulation based on 7 p.e. yield, not including compromised fibers (Alan Bross): CTT Single Track Efficiencies (-0.5<  <0.5) But: Hit efficiency (doublet layer) in cosmic ray test was estimated to be approx. 98% (Brian Smith). Additional inefficiencies in CR test? Some naïve estimates: single layer eff.98.0%99.0%99.5%99.87% 8 out of 885.1%92.3%96.1%99.00% 7 out of 899.0%99.7%99.93%100.00%

All DØ Meeting, 12/01/ Light Guides on Each Side of CFT CFT installed in central cryostat Light guide with curved connector

All DØ Meeting, 12/01/00 Light Guide Routing 1

All DØ Meeting, 12/01/00 Light Guide Routing 2

All DØ Meeting, 12/01/00 Light Guide Routing 3

All DØ Meeting, 12/01/00 Light Guide Testing 1  Scintillating fibers can be illuminated with LED panels. u Each ribbon (256 fibers) is covered by 3 panels on both ends respectively. u LED panel designed for calibration purpose (no absolute calibration possible, coupling LED panel – SciFi non-uniform and unknown) u provides a measurement of light attenuation (LG quality) Photo peaks in the ADC spectrum of single fibers: Poisson fit (smeared by Gaussians) provides a measure of the average p.e. yield for a fiber channel (scintillating fiber + clear fiber + VLPC chip [quantum efficiency]). p.e. yield with LED system: 0.5–2.5 p.e. depends on light coupling into scint. fibers

All DØ Meeting, 12/01/00  CFT Front-End: 4 production cassettes, any 2 integrated in the read- out (limited by electronics)  LED pulser data taken with primary DAQ (L3) u CFT is currently primary DAQ user s hundreds of runs with millions of events s provides thorough test of DAQ and data logging system  online/offline analysis using examine and stand-alone kumac/fortran code u online: direct feedback to installation team u mapping SVX channels – fibers not provided in DØ offline framework (stereo boards)  LG are tested with 2-3 different LED settings. u provides a partial cancelation of LED panel effects u P.e. yield can be determined with 7% accuracy on average. s But non-uniform coupling LED panel – SciFi can fake losses.  classification of LGs based on uniformity of p.e. yield distributions u can be compared to ribbon and LG QC with radio-active source (Lab3) Light Guide Testing 2

All DØ Meeting, 12/01/00 QC: Light Guide with Uniform Response dead electronics LED panel edge

All DØ Meeting, 12/01/00 QC: Light Guide with Crack Structure The worst LG so far! Even-odd structure indicates crack in curved connector in between doublet layer. To minimize cracks curved connectors (LG to ribbon) are now glued with temporary clamps. Glue is strong enough to stop evolution of cracks (tested independently).

All DØ Meeting, 12/01/00 CFT Curved Connector

All DØ Meeting, 12/01/00 QC Summary: LG on Axial Ribbons  Problematic LGs were detected during QC : u easy: wrong labels, wrong pinning of connectors coupled to cassettes u severe: several LG reglued, 5 LG entirely replaced (cracks)  Classification of the 152 LG (axial side), multiple class. allowed: u low gain means < approx. 75%, LED effects not entirely cancelled, performance of whole system including scintillating fibers u good uniformity:43 u edge fibers with low gain:25 u drop at edge (<20%):30 u drop at edge (>20%):16 u Indication of crack:17 u several (>3) low gain fibers:9 u structure (period 32):21 u bad: 1 (shown in QC example) u marginal:20

All DØ Meeting, 12/01/00 QC Summary: LG on Stereo Ribbons  82 out of 152 LG installed and glued, QC completed for 69 LG  On average LGs on stereo side have a better performance than those on axial side: u due to less handling? initial routing now close to final route u only 1 replacement candidate up to now u Ironically optimal performance is much more crucial for LGs on axial side, since stereo layers are not included in CTT.  Installation and QC anticipated to be finished 12/11  2 additional checkouts of optical/electronic read-out system needed before RunII u after LG connection to final cassette u after installation of AFE boards  What I haven’t mentioned: u only limited QC of CPS LGs possible due to non-uniform LED response (by design to account for large dynamic range) u FPS LGs not yet produced