Adders in drawer Test of TileCal Level 1 Interface drawer patch panel trigger cable ca 70 m receiver pre-processor TileCal patch panel RP patch panel TileCal.

Slides:



Advertisements
Similar presentations
Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
Advertisements

TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
D EVELOPMENT & T ESTING : ADC BOARD FOR THE P ROMETEO T EST - BENCH MATTHEW SPOOR University of the Witwatersrand HEPP 2015.
Scintillation counter installation on EBC cryostat scintillators gap scintillators location of MBTS scintillators MBTS counters will be plugged into fiber.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Commissioning TileCal with Cosmic Ray Muons J. Pilcher University of Chicago.
LKr readout: present and future R. Fantechi 30/8/2012.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
The ATLAS Tile Calorimeter: Commissioning and Preparation for Collisions Presented by Oleg Solovyanov On behalf of the Tile Calorimeter Collaboration of.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
ECL trigger for Super Belle B.G. Cheon (Hanyang U)‏ KEK 1 st open meeting of the Super KEKB Collaboration.
HBD FEE test result summary + production schedule 16mv test pulse result –5X attenuator + 20:1 resistor divider at input (to reduce the noise on the test.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
24/03/2010 TDAQ WG - CERN 1 LKr L0 trigger status report V. Bonaiuto, G. Carboni, L. Cesaroni, A. Fucci, G. Paoluzzi, A. Salamon, G. Salina, E. Santovetti,
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
Final FED 1 Testing Set Up Testing idea and current status Preliminary results Future development Summary M. Noy
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
28 June 2004ATLAS Pixel/SCT TIM FDR/PRR1 TIM tests with ROD Crate John Hill.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
K. Jon-And, Stockholm University1 Tilecal Team 5 meeting 8 November 2005.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
US TileCal Meeting at UTA Possible Electronics Evolution J. Pilcher University of Chicago.
BPM stripline acquisition in CLEX Sébastien Vilalte.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
L1Calo Installation Status Murrough Landon, QMUL Level-1 Calorimeter Trigger (University of Birmingham, University of Heidelberg, University of Mainz,
MobiDAQ progress Paulo Vitor da Silva, Gerolf Schlager.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Within ATLAS both TILECal and LAr are planning upgrades to the readout systems - current systems will reach limits on radiation exposure aging of components.
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
MobiDick4 progress report Carlos Solans. Introduction MobiDICK is a complete test bench for super-drawers Will be used during the maintenance in the long.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
Rainer Stamen, Norman Gee
Front-End Electronics of ATLAS Tile Calorimeter and its Commissioning
PreShower Characterisations
Calibration Status Energy Calibration Stabilities/instabilities
LKr status R. Fantechi.
Rack Design Proposal as of 01/03/2013
ECAL Front-end development
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Coherent sets of equipment Magnus Hansen
TileCal upgrade EVO meeting Demonstrator tesks
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
The ELENA BPM System. Status and Plans.
Mini-drawers, FE-ASIC , Integrator
Status of upgrade works at Clermont-Ferrand
Online Software Status
EMC Electronics and Trigger Review and Trigger Plan
Front-End Electronics of ATLAS Tile Calorimeter and its Commissioning
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Test of Link and Control Boards with LHC like beam, CERN, May 2003
RPC Front End Electronics
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
BUCKEYE has internal shift register which controls calibration
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Presentation transcript:

Adders in drawer Test of TileCal Level 1 Interface drawer patch panel trigger cable ca 70 m receiver pre-processor TileCal patch panel RP patch panel TileCal Lvl1

The task is to test the information transfer between the TileCal adder boards and the Level 1 preprocessor. test the trigger cables the receivers the patch panel connections the pre-processor Serve as a test bench for the first level trigger. The tests should preferably also be compatible with the similar LAr tests

MobiDAQ VME test crate developed at CERN to test data from 8 drawers at a time. MobiTrig We suggest to have a standalone crate to test the trigger signals. Develop this in Stockholm. Tests should check for continuity, absence of shorts, cross talk, noise levels, pulse shapes and attenuation.

Components of MobiTrig VME-crate (borrow) VME processor, CCT (CERN pool?) ADC 8 channels, 12 or 14 bits, sampling (borrow?) MUX (to be bought) TTC receiver module Functionality TCP/IP controlled: initialize, set MUX Reports settings and data to COOL (POOL) Activated by TTC fiber, L1a

Test environment in Stockholm Digitizer test bench with adders Software Parts of digitizer test bench s/w, Baltazar MobiTrig software (Karl) Test data analysis software (ATHENA?) (Elin)

Time scale Tests working in Stockholm by July Tests at CERN in August Massive tests of barrel September - November Tests of extended barrels