ERCOT Operational Audit 2005 August 1 - August 19, 2005.

Slides:



Advertisements
Similar presentations
Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
Advertisements

Teacher Evaluation Model
ISO 9001 : 2000.
Concerns with RUC Capacity Short Charge and Energy Trades.
Recent ERCOT Events Lessons Learned
Data Validation Documentation for Enrollments. Learning Objectives As a result of this training you will be able to: Describe the data validation process.
Columbia University IRB IRB 101 September 21, 2005 George Gasparis, Executive Director, CU IRB Asst. V.P. and Sr. Asst. Dean for Research Ethics.
1Welcome TNKids Financials TNKids Financial System Changes to Placement Change Notification Computer-Based Training EXIT.
PERSONAL CARE AND NURSING SERVICES PROVIDER MEETINGS 2014.
Audit & Compliance Tips Jagan Mandavilli Senior Compliance Engineer.
CHAPTER 6 ELECTRONIC DATA PROCESSING SYSTEMS
Verification Visit by the Office of Special Education Programs (OSEP) September 27-29, 2010.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
AGENDA Welcome and introductions Brief introduction to PSI Mobile Technical Overview Demonstration Q and A Next Actions.
WELCOME 2014 AmeriCorps Program Director Training Saratoga Springs, NY October 20, 2014.
ENVIROTRAC: A Premier Chamber Monitoring and Data Acquisition System Envirotrac A Guided Tour.
Providing Best Practice Compliance Solutions for Employer Groups.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
NSRS deployment April John Adams ROS – May 12, 2005.
Peak RCCo Performance Metrics Draft –November 2013.
Reliability Requirements Bill Blevins Manager of Operations Support ERCOT.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
0 District Self-Monitoring October 2015 Web-based Monitoring System (WBMS) for the Tennessee Department of Education Division of Consolidated Planning.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
CALIFORNIA DEPARTMENT OF EDUCATION Tom Torlakson, State Superintendent of Public Instruction Special Education Self Review (SESR) Activity Three: Corrective.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
Test and Review chapter State the differences between archive and back-up data. Answer: Archive data is a copy of data which is no longer in regular.
Continuous Auditing at Unibanco Washington Lopes
Rob Connell May 1, 2002 Retail Sub-Committee Update.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
Lead from the front Texas Nodal 1 EDS 3 R6.2 Testing Overview Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 LFC WebEx.
NCLB Monitoring September 19, 2012 Webinar.
Supervision SICOR Securities, Inc.. Why? NASD 3110 requires the firm to “…establish and maintain a system to supervise the activities of each registered.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
New Form Approval Process. Background New Process is effective April 1, 2014 Published in the March 2014 Cities and Towns Bulletin, pages 7 and 8 Changes.
Internal Auditing ISO 9001:2015
MISUG Meeting Materials Jackie Ashbaugh/Jamie Lavas ERCOT 1/13/2011.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
Compliance Update Larry Grimm ERCOT Compliance To The ERCOT Board of Directors September 20, 2005.
Test Delivery System (TDS) & Online Reporting System (ORS) for ELPA21 Online Testing Training Webinar Copyright © 2014 American Institutes for Research.
Confidential and Proprietary. Copyright © 2012 Educational Testing Service. All rights reserved. 2/20/2016 District and Site Coordinator Responsibilities.
WMS Update Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
January 2012 Mississippi Department of Education Office of Instructional Enhancement and Internal Operations/Office of Special Education 1 Noncompliance.
WESTERN PA CHAPTER OF THE AMERICAN PAYROLL ASSOCIATION – NOVEMBER 4, 2015 Risk Management for Payroll.
QSE Managers Working Group Meeting Notes 9 June, 2009 Report to WMS 17 June, 2009 David Detelich - Chairperson.
Lead from the front Texas Nodal 1 Nodal Transitional Qualification Approach to Qualifications for the Nodal Market August 16, 2007.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Retail Workshop ERCOT Nodal Update October 06, 2010.
= © Property of ERCOT 2001 ERCOT Response to the Nov. 5, 2002 Operational Audit Briefing to ERCOT Board of Directors November 19, 2002.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
December 8, 2006 PUCT DR Workshop Status of LaaR Participation in RPRS.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
PRS Workshop- NPRR755/NOGRR154 WAN communications of Critical Market Data and Agency-Only QSE Feb 29, 2016.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Request for Information (RFI) for the provision of a Turnkey Project for an Enhanced Unattended Transmission Substation CORP3430 Date: 4th March 2016.
Risk Assessment Beginning an Analysis Date by Jim Bowman.
TAC Report to the ERCOT Board
Phase Angle Limitations
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Test Administration & The TA Sites.
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
Managing Rosters Screener Training Module Module 5
Reimbursement Training
Coordinate Operations Standard
How Students Log In and Start a Test
Presentation transcript:

ERCOT Operational Audit 2005 August 1 - August 19, 2005

Overview There were a total of 251 items assessed – 241 compliant – 10 non-compliant Compliant Score of 96% Solutions to the 10 non-compliant items are provided in the following slides.

Conclusions The 10 non-compliant findings in the audit have been addressed and solutions are provided. The beneficial aspects of an Operational Audit are demonstrated by the improvements observed in this year’s performance. Actions taken as a result of previous audits contributed to this year’s success.

Issue 1: Steps performed out of sequence on Day Ahead Replacement Day Ahead Desk Section 2.12: Initiate ERCOT Day Ahead Replacement Capacity Market. Steps not performed in sequence Solution: – It was determined that performing these steps out of order did not have an adverse impact on the desired result. The procedure was changed to remove the sequential requirement. Expected Completion Date: Completed

Issue 2: Time delay before executing Hour Ahead Study not observed Operating Period Desk Section 2.1.1: Execute Hour Ahead Study Solution: – The note is being changed to instruct the system operator to verify the real-time balancing market has cleared by utilizing a message screen in the MOI. This will be covered in Continuous Training Cycle 2. Expected Completion Date: October 13, 2005

Issue 3: Omitted step recalling NSRS without recognized exception Operating Period Desk Appendix 3.4: How to deploy NSRS Solution: – The two steps that were omitted were not needed to recall NSRS. The recall is only needed for one market participant who believes they have corrected the issue. The appendix will be changed to include one procedure for deploying NSRS and one for recalling NSRS. Expected Completion Date: October 13, 2005

Issue 4: Steps performed out of sequence when issuing an Alert Transmission and Security Desk Section 2.5.3: Issue an Alert Solution: – It was determined that performing these steps out of order did not have an adverse impact on the desired result of the procedure. A note has been added to inform the operator the sequence is only a recommendation. Expected Completion Date: Completed

Issue 5: Did not print Hot Line call log Transmission and Security Desk Section 2.5.3: Issue an Alert Solution: – It is an Operating Guide requirement (Section 2.3.2) to record or file all written or electronic dispatch instructions and acknowledgements as soon as practicable after the issuance of the dispatch instruction. The importance of the hot line call log will be covered in Continuous Training Cycle 2. Expected Completion Date: October 13, 2005

Issue 6: Did not ensure MP or RAP available Transmission and Security Desk Section 2.1.2: RTCA Congestion Management and 2.2.6: Mitigation Plans Solution: – There is a RAP-C Enhancement Project which is due in production in mid-November. When this tool is delivered, all RAPs, MPs, PCAPs, and RAPCs that are posted will be modeled; eliminating this issue. Expected Completion Date: November 15, 2005

Issue 7: Steps performed out of sequence when issuing an Alert Frequency Control Desk Section 2.6.3: Issue an Alert Solution: – It was determined that performing these steps out of order did not have an adverse impact on the desired result of the procedure. A note has been added to inform the operator the sequence is only a recommendation. Expected Completion Date: Completed

Issue 8: Did not check ENS or MIS notifications Frequency Control Desk Section 2.6.3: Issue an Alert Solution: – It is imperative that the system operators have checks and balances during real time operations. When a situation arises that requires the posting of a message, system operators should verify the posting occurred by either viewing the message system or by consulting with other system operators. The importance of this verification will be covered in Continuous Training Cycle 2. Expected Completion Date: October 13, 2005

Issue 9: Logging error Frequency Control Desk Section 2.4.1: Monitor SCE for each QSE Solution: – It is required that system operators log any pertinent information regarding an event in the electronic logs. The importance of the logging requirement will be covered in Continuous Training Cycle 2. Expected Completion Date: October 13, 2005

Issue 10: Unscheduled Generator Testing Frequency Control Desk Section 2.3.1: Unscheduled Generator Testing Solution: – This procedure was removed from the Frequency Desk and the Shift Supervisor’s procedure was enhanced to govern the process in the future. Expected Completion Date: Completed

Conclusion The Operations Department showed improvement from the last Operational Audit. In the last three years we have improved on the Compliance Operational Audit We understand the benefit of the audit and welcome the input to better our operational readiness

Questions