Mac Mestayer DC12 Status: as of Feb., 2008 Decide on endplate, feedthrough, wire material –guidance from small prototype chambers mainly electrical stand-off.

Slides:



Advertisements
Similar presentations
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Advertisements

Zebulun Krahn Advisor: Curtis Meyer Technician: Gary Wilkin Carnegie Mellon University Straw Tubes and Hall D December 11-13, 2003 GlueX Collaboration.
TRD status meeting GSI Clemens Adler TRD (Pre-)Production Status New Results/Experiences Problematic issues Production Plans Timescale.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
© 2012 Pearson Education, Inc. { Chapter 25 Current and Resistance.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chambers for CLAS12 - Mac Mestayer Context: how does it fit within CLAS12 ? Specifications:
June 9, 2008What’s a Drift Chamber? Mac Mestayer Drift Chambers: The Science behind the Art What are they? how do they work? ionization of the gas by particles.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
PSI-21-january-2004MEG Drift chambers1 1)Hardware Foils Hood Inner cathode Prints and preamps 2)Software and analysis Malte‘s Garfield isochronal Lines.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
TPC Design Concept: From MicroBooNE to LAr20
DQHDS Upgrade: Status of Hardware Design. Approach to implementation of the new heater measurement system. 08/06/2011V. Froidbise.
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
ANSYS Calculations: DC Distortions Sense Wires with Varying Tension Shortest wire (m)0.3 Longest wire (m)4 Difference between short and long wires3.7 Division.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
SR NSLS prototype magnets. Dipoles 90 mm aperture dipole Pole Ends will be matched to achieve the magnetic field quality ( )
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
Construction of Prototype B for the COMPASS-II Polarized Drell-Yan Experiment James Mallon of Abilene Christian University for the UIUC COMPASS Collaboration.
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
CLAS12 Drift Chamber Review Mechanical Engineering Presented by David Kashy – Hall B Lead Engineer.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.
PSI-21-january-2004MEG Drift chambers1 1)Hardware Foils Hood Inner cathode Prints and preamps 2)Calibration Malte‘s Garfield isochronal Lines and drift.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
CLAS12 Drift Chamber Prototyping
DC12: Tracking/simulation needs CLAS12 Drift Chambers – Physics specifications high efficiency at large solid angle (5 o to 40 o ; 50% f coverage.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer CLAS12 Drift Chamber Construction - Mac Mestayer Technical Details of Construction —buy endplates.
Momentum Corrections for E5 Data Set R. Burrell, G.P. Gilfoyle University of Richmond, Physics Department CEBAF The Continuous Electron Beam Accelerating.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Review of Micromegas Tracking Detectors for CLAS12 – May 7, 2009 Reviewers: Madhu Dixit, Mac Mestayer Presentations covered the following topics: –detector.
March 7, 2007 CLAS12 Drift Chamber Review Mac Mestayer Drift Chambers for CLAS12 - Mac Mestayer Context: how does it fit within CLAS12 ? Specifications:
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
Closeout. Sharing 2010 Straw production – Material study: CERN – Procurement (CERN) – Straw production: Dubna Electronics (CERN) Simulations, analysis.
Hall-B Meeting : July 17, 2006 Mac Mestayer Problems in the CLAS Drift Chambers We’ve had a couple of problems: ~60 severe* / year 16 broken wires 5 -
Drift Chamber Review Jefferson Lab 6-8 March 2007 CLAS12 Drift Chamber Electronics R. Chris Cuevas Group Leader -- Fast Electronics Jefferson Lab Physics.
1 PANDA FWD Meeting, GSI-Darmstadt, Preparation of the TDR for the forward tracker University Ferrara + Jagiellonian University, Cracow Main.
Physics requirements  mapping spec’s Strategy: analyze measurements to get field Mapping plan: where/how to map Engineering design: sensor, fixtures,
Physics Requirements Sensitivity to Manufacturing Imperfections Strategy  where to map field  measure deviation from ideal model  fit to error tables.
BABAR  &  L. de Brunhoff Drift Chamber System BABAR Drift Chamber Project Co-System Managers D.B.MacFarlane, McGill University A.J.S.Smith, Princeton.
Status of TRIUMF Prototype Studies Christopher Hearty University of British Columbia/IPP May 31, 2010.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
PCB Assembly. INTRODUCTION  PCB abbreviation is a printed circuit board,also known as a printed wiring board.  For electronics PCB is used to build.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Drift Chamber Prototyping Plans at ODU Gail Dodge, Tom Hartlove, Mac Mestayer Nov. 18, 2005 Goals for FY06: Design 144 cell prototype of R1 Drift Chamber.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
Charged Particle Tracking for CLAS12
News from Cracow on the forward tracking
new straw end plug: D=10.6 mm straws support frame Levan option
HO correctors update Massimo Sorbi and Marco Statera
Structure and etc Shoji Uno (KEK) at B2GM
WBS: : Tracking for CLAS12
Drift Chambers for CLAS12 -Mac Mestayer
Region I: stringing 1/3 done on 1st chamber!
CLAS12 Tracking Design (ca. 2005) a basic design parameters
Design of the He and HB ODU
Feb. 2, 2007 CLAS12 Upgrade Workshop Mac Mestayer
Warm-Up 12/19/13 Draw a 3 frame cartoon strip that shows the series of events that may cause you to receive a shock from a metal door knob on a dry winter.
CDC Structure S. Uno KEK
DC monitoring - calibration - simulation - corrections
TPC Development at Cornell
Drift Chamber Monitoring
BESII Vertex Chamber and MDCII Feedthroughs
Presentation transcript:

Mac Mestayer DC12 Status: as of Feb., 2008 Decide on endplate, feedthrough, wire material –guidance from small prototype chambers mainly electrical stand-off and noise issues Decide on frame designs –guidance from Reg. 2 prototype –constructability and accuracy of pre-bowed endplates Large prototype tests –improve procedures, look for unknown problems Proceed with drawings, vendor qualification, … Feb. 21, 2008CLAS12 Drift Chambers: Status Report

Mac Mestayer Prototype tests Wire-test chamber at ODU, Idaho St. –smaller diameter field wire ok; no extra noise –metal-tipped feedthroughs less noisy than all plastic Full-scale Reg. 1 prototype –long wires ok; small electrostatic deflections –large temperature variation of wire tensions –many procedures to fine-tune –small modifications to electronics boards –no new problems May. 29, 2008CLAS12 Drift Chambers: Status Report

Mac Mestayer Decide on endplate, feedthrough and wires Endplate material  aluminum (reg. 1): minimize dead area  G10 (reg. 2): no eddy current if torus quenches  steel-foam (reg. 3): very stiff structure Feedthrough material  glass-loaded Noryl with metal “trumpet” inserts Wire choices  30  m W, 80  m Cu-Be, 140  m Cu-Be for s, g, g  less wire tension, thinner endplates May 29, 2008CLAS12 Drift Chambers: Status Report

Mac Mestayer Decide on frame designs  pre-bowed endplate-in-a-frame May. 29, 2008CLAS12 Drift Chambers: Status Report

Mac Mestayer Status: drawings, vendor qualifications drawings for Reg. 2 ~ 90% done Reg. 2 endplate prototype – this summer procurement strategy: –feedthroughs: main vendor can help choose “inserts” –wire: specifications known, ready for procurement –endplates/frames: reg. 1&2 – ready at end of summer –assembly fixtures: ready at end of summer –Reg. 3: stay with standard “steel/foam” design? (or go to a “reg2-type” design?) May. 29, 2008CLAS12 Drift Chambers: Status Report