Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.

Slides:



Advertisements
Similar presentations
Amitava Mitra, Solution Architect, Oracle Primavera, TCS
Advertisements

Building Information Management (BIM)
The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex.
Models. The Future of Building Services Model Content.
Slide 2.1 4E1 Project Management Defining the Project.
EMPA Forum 2015 Workshop 3 - Endeavour BIM (Building Information Modelling) (2nd Lesson) & Using Augmented Reality February 2015.
BIM Management – A Strategic Approach
BIM Me Up, Scottie! The Next Generation in Construction Technology.
QUALITY MANAGEMENT DEFINITIONS AND CONCEPTS QUALITY MANAGEMENT TOOLS QA / QC PROCESS COMPUTERS AND PROJECT QUALITY.
INDUSTRIAL & SYSTEMS ENGINEERING
Comprehensive Building Modeling Presented By: Bariham Hossny Gheith by Larry Rocha
©© 2013 SAP AG. All rights reserved. Scenario/Processes Make-to-Stock Scenario Overview Planning Supply Initiating Production Executing Production Processing.
Building Information Modeling
Expanding Roadmap Opportunities Deke Smith, FAIA Executive Director buildingSMART alliance National Institute of Building Sciences Hotel Monteleone New.
January 2013 BIM the cost of sustainability BIM And the cost of sustainability Delivering sustainability.
BIM Overview. B uilding I nformation M odeling What does BIM Stand For?
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
The BIM Project Execution Planning Procedure
Introduction to BIM BIM Curriculum 01.
Emerging Trends in Electronic Design and Construction April 2013.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Course Number Course Name Faculty Name University Logo T. Sulbaran & M. Shiratuddin - BIM for Construction Using ArchiCAD – Thomas Delmar Learning – ASC.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Construction Project Management: Technology driven answers for schedule and budget savings.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Change Management “Getting from where you are, to where you want to be”
From Research Prototype to Production
Cost Segregation Study Proposal Overview Analysis ABC Company.
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
The Benefits of Using BIM Software in Building Design and Construction By Jared Heber.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
The Influence of BIM on Quantity Surveyors Presented by: Syukri Zulkipli Alex Lim.
Overview of Building Information Modeling What does it mean for Civil Engineering?
Electronic Data Interchange Systems
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part I.
Graphical Detailing in Construction and the Built Environment
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
6 th Annual Federal Environmental Symposium: National BIM Standard June 5, 2007 Dana K. “Deke” Smith, AIA Executive Director, buildingSMART Alliance.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
Chapter 7 Computer-Aided Design and Drafting in Architecture.
© 2011 Autodesk Autodesk ® Sustainability Solutions Buildings and Infrastructure Name Title.
Dana K “Deke” Smith FAIA Birgitta Foster Executive Director Assisting Director buildingSMART alliance 1.
eSPL Innovative Management Technology
DESIGN TOOLS UPDATE.
Design – BIM – Build – Operate
Make-to-Stock Scenario Overview
7D 6D 5D 4D 3D bIM Dimensions bIM Services ESTIMATING
Definition of CIM “CIM is the integration of the total manufacturing enterprise through the use of integrated systems and data communications coupled.
BIM EXECUTION PLANNING PROCESS
EXTRA SLIDES.
Intracompany Stock Transfer Scenario Overview
Make-to-Stock Scenario Overview
Intracompany Stock Transfer Scenario Overview
ChE 473K Plant Design R. Bruce Eldridge.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
BIM EXECUTION PLANNING PROCESS
Intracompany Stock Transfer Scenario Overview
Adoption of Building Information Modeling Top Benefits of BIM data for Facilities Managers.
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
Dominant Improvements of BIM Modeling Services and Building Information Modeling Firms BIM Modeling Services Building Information Modeling Firms.
DBIA Manual of Practice
CIC BIM Competition Presentation Template & Content Guide
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings

Unit 18: CADD in Construction Building Information Modelling Click to view Basic overview to BIM

Unit 18: CADD in Construction Background to BIM Increased competitive pressure Time Cost Quality Industry alignment Integrated practices Greater control over supply team Lean Practices Waste reduction Off site construction Building Information Modelling

Unit 18: CADD in Construction What are the aims of BIM? Faster and more economic delivery of projects with less environmental impact Create value in every stage of the process (Plan – Design – Build – Manage) User analysis to optimise sustainability of the life cycle. Visualise design ideas Simulate multiple alternatives -Ability to simulate projects before they are built (higher quality outcome) Identify clashes Communicate intent - Accurate documentation Improve productivity - Savings in time and money with improved coordination Building Information Modelling

Unit 18: CADD in Construction Click to view Visualisation of the BIM advantage Building Information Modelling

Unit 18: CADD in Construction Manufacture Model Color Link to specification BREEAM Information Building Information Modelling In a BIM model the software objects are intelligible to computer programs as representations of real-world building components.

Unit 18: CADD in Construction Building Information Modelling

Unit 18: CADD in Construction 8 Building Information Modelling BIM is not software!

Unit 18: CADD in Construction Software is a ‘Tool’ not BIM Building Information Modelling

Unit 18: CADD in Construction Autodesk –Revit –Autocad –Navisworks Graphisoft –Archicad Bently –Bently Arcitecture –RAM Steel Onuma –OPS Principal software companies… Building Information Modelling

Unit 18: CADD in Construction BIM is a methodology of gathering and maintaining information about a building for quick decision making throughout the life cycle or facility cycle of the building. BIM is a Methodology Building Information Modelling

Unit 18: CADD in Construction Click to view What is BIM –Autodesk overview Building Information Modelling

Unit 18: CADD in Construction Pre design Design Construction Operation BIM focus: Facility Cycle Building Information Modelling

Unit 18: CADD in Construction Who uses the information from BIM? Owners Planners Realtors Appraisers Mortgage Bankers Architects Engineers Cost & Quantity Estimators Specifiers Contracts & Lawyers Construction Contractors Sub-Contractors Fabricators Code Officials Facility Managers Maintenance & Sustainment Renovation & Restoration Disposal & Recycling Scoping, Testing, Simulation Safety & Occupational Health Environmental & NEPA Plant Operations Energy, LEED Space & Security Network Managers CIO’s Risk Management Occupant Support First Responders Building Information Modelling

Unit 18: CADD in Construction What is information Modeling? 3d Model Energy Model 4d Model - time 5d Model - time and cost Business Model Financial Model Safety plan Maintenance plan Building Information Modelling

Unit 18: CADD in Construction Types of Models Design Models –Architecture –Civil –Structural –Mechanical –Plumbing –Electrical Construction Document Models –Architecture –Civil –Structural –Mechanical –Plumbing –Electrical –Specification BREEAM Models –Energy –Day lighting Contractor Models –Architecture –Civil –Structural –Mechanical –Plumbing –Electrical –Shop drawing –Material literature Facility Management Models Building Information Modelling

Unit 18: CADD in Construction BIM Standards National BIM Standard UK BIM Standard GSA - 3D-4D Building Information Modeling AGC - The Contractors Guide to BIM U.S. National CAD Standard Building Information Modelling

Unit 18: CADD in Construction Running a BIM Project  Guidelines for the development and use of the models  Guidelines for Information Management  Guidelines for a BIM Execution Plan  Project Participants  Models to be used & content  Contract & Record Documents  Areas of the project  Schedule (delivery and updates)  Protocols for submission  Coordinate system & dimension accuracy  File format, naming, structure  Software to be used Building Information Modelling

Unit 18: CADD in Construction  Protocols  Coordination and Conflicts  Model Ownership & Requirements  File Formats  Responsibilities  Cost Estimating  Scheduling  Level of Development defines content requirements and authorised use  Level 100-”used for understanding the requirements ” (Programming)  Level 200-”elements modeled as generalized assemblies” (Schematic Design)  Level 300- “elements modeled as specific assemblies” (Construction Documents)  Level 400-”fabrication, assembly and detailing information (Construction)  Level 500 -”elements modeled as constructed” (O&M) Running a BIM Project Building Information Modelling

Unit 18: CADD in Construction BIM Execution Plan Set clear goals & objectives across organization & teams Increase accountability and productivity Standardize your communication methods Define roles and responsibilities Bind all parties early in the Request For Proposals process Control your project costs, schedule, scope and quality Building Information Modelling

Unit 18: CADD in Construction Communication Building Information Modelling

Unit 18: CADD in Construction Building Information Modelling

Unit 18: CADD in Construction Integrated Project Delivery Building Information Modelling

Unit 18: CADD in Construction Clash Detection Building Information Modelling

Unit 18: CADD in Construction Building Information Modelling

Unit 18: CADD in Construction Facility Data that Could Be Included in BIM  Planning scenarios and site information  Architectural Program  Floor plans  Space Functions  Classified areas, vaults etc.  Area calculations  Specifications  Contract documents  Legal description  Change orders  Supporting documentation for litigation  Shop drawings  Procurement documents  Progress photographs  Alarm diagrams  Warranty data  Cost Estimates  Invoices  Purchases requests  Organizational occupants  Personnel lists  Seating plans  Handicap designation  Network diagrams  Hazardous materials  Operating manuals  Maintenance records  Inspection records  Electronic 3d model  Simulations  Continuation of operations plan  Disaster Recovery Plans  Contingency plans  Furniture inventory Building Information Modelling

Unit 18: CADD in Construction Building Information Modelling Task In groups of 2/3 list the advantages and disadvantages of using BIM. List the advantages and disadvantages of using a 2D CAD package. Identify who benefits in the team

Unit 18: CADD in Construction Click to view Visualisation of the BIM advantage Building Information Modelling