Software Common Task Group Meeting Akiya Miyamoto 6-June-2011.

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

ILD Resource Survey 2014/9/9 Y. Sugimoto 1. Committee under MEXT ILC Task Force in MEXT Academic experts committee Particle-Nuclear physics WG Members.
Higgs branching ratios study Oct Hiroaki Ono (NDU) Oct ILC Physics WG general meeting.
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
RD’s Report on the status of physics/detector activities ILD Sakue Yamada May 23, 2012 Sakue Yamada.
Computing plans for the post DBD phase Akiya Miyamoto KEK ILD Session ECFA May 2013.
Status of ILC Computing Model and Cost Study Akiya Miyamoto Norman Graf Frank Gaede Andre Sailer Marcel Stanitzki Jan Strube 1.
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
ILD meeting Welcome/Introduction 2015/4/23 Y. 1.
Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.
Discussion/ Planning Session -ILD organisation: status and plans -Concrete plans -Report from the R&D group: Jan Strube -Report from the parameter group:
Report from Physics and Detectors Sakue Yamada Beijing March 26, 2010 The activity of the two detector groups IDAG monitoring Common Task groups.
Vvh 1TeV study for DBD ILC Physics and software meeting Nov H.Ono (NDU) Nov ILC physics and software meeting 1.
Computing for ILC experiments Akiya Miyamoto KEK 14 May 2014 AWLC14 Any comments are welcomed.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
ACFA Summary Akiya Miyamoto, KEK KILC12 26 April, 2012.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
A brief report of tth A.Miyamoto, 16-June-2011 Physsim update Tauola : modified to use DESY_TAUOLA ISR function: Modified to use same ISR function as Whizard.
Sim/Recon DBD Editors Report Norman Graf (SLAC) Jan Strube (CERN) SiD Workshop SLAC, August 22, 2012.
Computing Resources for ILD Akiya Miyamoto, KEK with a help by Vincent, Mark, Junping, Frank 9 September 2014 ILD Oshu City a report on work.
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
Norman Graf (SLAC) Software Software KILC12, Daegu, Korea.
ILC DBD Common simulation and software tools Akiya Miyamoto KEK ILC PAC 14 December 2012 at KEK.
Authoring Technical Books ATUL KAHATE Project Manager, i-flex solutions limited, Pune 28 June 2003.
SiD Simulation & Reconstruction Norman Graf (for the sim/reco team) LCWS 2010, Beijing March 28, 2010.
Status of tth analysis 1. √s=500 GeV 2. √s=1 TeV 3. MC requests R. Yonamine, T. Tanabe, K. Fujii T. Price, H. Tabassam, N. Watson, V. Martin ILD Workshop,
CLIC CDR in relation to SiD Lucie Linssen SiD discussion at IWLC CERN October 18 th LL, SiD meeting at IWLC, 18/10/2010.
Software Overview Akiya Miyamoto KEK JSPS Tokusui Workshop December-2012 Topics MC production Computing reousces GRID Future events Topics MC production.
Lcsim software: status and future plans ECFA-LC DESY May 28, 2013 Norman Graf (for the sim/reco group)
Summary of Software Pre-Meeting Akiya Miyamoto 25-May-2011 KEK ILD Workshop LAL.
Taikan Suehara, Belgrade, 7 Oct page 1 Hybrid ECAL: optimization and related developments Taikan Suehara H. Hirai, H. Sumida, Y. Sudo, T.
Report from Software Workshop before TILC09 (16-April) Akiya Miyamoto, KEK 21-April-2009 ILD Meeting.
Software Common Task Group Report Norman Graf (SLAC) PAC, Vancouver May 10, 2009.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
Summary of Software and tracking activities Tokusui Workshop December 2015 Akiya Miyamoto KEK.
Software Common Task Group Report Akiya Miyamoto ILC PAC POSTECH 3 November 2009.
Next Step Akiya Miyamoto, KEK 17-Sep-2008 ILD Asia Meeting.
1 ILD Workshop purpose and scope Yasuhiro Sugimoto May 23,
1 Software tools in Asia Akiya Miyamoto KEK 18-March-2005 Simulation and Reconstruction Session LCWS2005 Representing acfa-sim-j activity M.C.Chang 1,K.Fujii.
Tim Barklow (SLAC) Mar 23,  DBD Benchmarks with Baseline Detector  DBD Benchmark Event Generation  CLIC Benchmarking Participation by SiD 
Benchmarking Production Jan Strube (CERN) for the SiD Production team.
Computing Resources for ILD Akiya Miyamoto, KEK with a help by Vincent, Mark, Junping, Frank 9 September 2014 ILD Oshu City a report on work.
Introduction to the seminar ILC Detectors: Status and Prospects Akiya Miyamoto KEK IPNS 18 July
SiD LOI Benchmark Simulation and Reconstruction Norman Graf (SLAC) LCWA09, Albuquerque September 30, 2009.
RD’s Report Sakue Yamada May 23, /05/231 Sakue
Accelerator Systems TAG Leaders’ Meeting PM Report –Planning for ALCPG –TDR preparations: Area System Baseline Technical Reviews –Recent e+ workshop experience.
Summary of MC requests for DBD benchmarks ILD Workshop, Kyushu University May 23,
Report from SB2009 Working Group Akiya Miyamoto 8-July-2010 DESY ILD Software and Integration Workshop.
General news LCD monthly meeting 12/8/2013 L. Linssen, LCD monthly meeting, 12 Aug August 8 th 2013.
Tau polarization LoI Benchmarking Study Tim Barklow Ron Cassell Subhendu Chakrabarti Ray F. Cowan Cosmin Deaconu Rich Partridge SiD Collaboration Meeting.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Lcsim software: status and future plans ECFA-LC DESY May 30, 2013 Norman Graf (for the sim/reco group)
Whizard2 test at KEK report of work in progress Akiya Miyamoto 27 October 2015 Contents: Comparison with DBD sample Recoil mass distribution of e + e -
Physics performance with SB2009 Progress report of a study by QuickSimulator Akiya Miyamoto 15-Jan-2010 KEK SB2009 WG Meeting.
Generator status Akiya Miyamoto KEK 23 February 2016.
Asian Physics and Software meeting Akiya Miyamoto KEK 3-September-2010.
KEK Computing Resources after Earthquake Akiya Miyamoto 30-March-2011 ILD Software WG meeting Status as of today.
Computing requirements for the experiments Akiya Miyamoto, KEK 31 August 2015 Mini-Workshop on ILC Infrastructure and CFS for Physics and KEK.
ILD MCProduction with ILCDirac
ILD Soft & Analysis meeting
ILD Soft & Analysis meeting
Akiya Miyamoto KEK 1 June 2016
Brief summary of discussion at LCWS2010 and draft short term plan
Top and WW final states Harry Weerts For LC working group
Computing in ILC Contents: ILC Project Software for ILC
Sakue Yamada March 19, 2011 RD’s Report Sakue Yamada March 19, /03/19 Sakue
ILD Ichinoseki Meeting
ILD Optimisation: towards 2012 University of Cambridge
Beam Delivery System Schedule at ILC2010
Presentation transcript:

Software Common Task Group Meeting Akiya Miyamoto 6-June-2011

Agenda LCIO-V2 : Status and open issues  Frank will show slides MC Production plan of ILD and SiD Next face-to-face meeting Next WebEx meeting AOB 2 6 June 2011 Akiya Miyamoto, Software CTG meeting

Issues regarding MC Production plan Generator Samples:  Last generator group meeting (Tim, Mikael, Akiya) : May 19 Test samples of WW at 1 TeV were prepared by Mikael and available Higgs 1 TeV samples will be prepared by Tim soon ttH 1 TeV: technical problem in using Whizard. Akiya is trying to prepare samples by another generator, Physsim. Next meeting is scheduled in June 16  ILC PEB(1/June) GDE will finalize the 1TeV parameter for DBD studies by LCWS2011 PEB agreed a plan to prepare generator samples by Christmas, assuming ~2 months to generate samples 3 6 June 2011 Akiya Miyamoto, Software CTG meeting

Issues regarding MC Production plan -2 Data address on GRID ILC VO. Suggestion ? Preference ? Examples :  /grid/ilc/mc-2011/generated  ILD may put simulated/production samples as /grid/ilc/mc-2011/simulated, …  /grid/ilc/generated : already used Do we keep using GRID catalog ? If so, ne possibility would be  /grid/ilc/DBD/generated/1TeV/wnnnnnn/wnnnnn.stdhep /1TeV-log/wnnnnn/wnnnnnn-log.tar.gz /1TeV-bkg/aa-hadron/ /1TeV-bkg/pairs/ /500GeV /wnnnnn/wnnnnnn.stdhep Need discussion among generator group Question to SiD: Is SiD planing to use GRID catalog to for Sim/Reco data ? 4 6 June 2011 Akiya Miyamoto, Software CTG meeting

Issues regarding MC Production plan - 2 ILD plan  ILD WS : still many issues for the software baseline  Aiming to converge by LCWS2011. Meanwhile test productions using new samples will be made.  Begin to form analysis group. Interest to re-do 500 GeV production. But detail plan is yet to be discussed and decided. SiD plan  Report from Norman 5 6 June 2011 Akiya Miyamoto, Software CTG meeting