C1 inspection results T. Meighan. C1 Lead Block Area Upper chill plates bowed upwards from side pressure (?) Top fingers pulled away from winding pack.

Slides:



Advertisements
Similar presentations
Tie rods or Tie bolts To understand the role played by tie rods, it is necessary to appreciate what is happening inside the cylinder of the engine. When.
Advertisements

Sectional Assembly and Installation
Crimping Get the pinouts for the desired connector and application. 2.Identify the proper connector and the associated pins for your application.
CARTRIDGE SEAL INSTALLATION. CHECK PUMP SHAFT FOR BURRS CHECK GLAND BOSS FOR NICKS LUBRICATE SECONDARY SEALS SLIDE SEAL ONTO PUMP SHAFT ASSEMBLE PUMP.
Replacing the Maintenance Kit HP Printers OIT lab services.
James Rasmussen.  Original dash was made from sheet metal, foam, and vinyl  Was too heavy for its purpose  Didn’t offer standard gauge sizes  Didn’t.
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Optical Manufacturing Solutions 1 Probe Assembly.
Trinity Highway Products Properly Installed SRT Post HBA System-Slotted Rail Terminal
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
MyLock 644D Service Seminar.
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
Cleaning out the stable for the girls. Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
Steps to Insert or Remove Spikes From Pall Blood Bags
清华阳光 TSINGHUA SOLAR JB Series Solar Water Heater Assembly Manual Tsinghua Solar Ltd. Yangfang County, Changping District, Beijing, , China Tele:
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Objectives : ANALYZE home maintenance techniques.
Making Coverslips by Steve Smith, Cheng-Zhong Zhang and Amy Xu.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
SQXF Coil 2 Impregnation Status & Plan Fred Nobrega 09/09/2014.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
DISASSEMBLE ENGINE Teknik Kendaraan Ringan Semester 3 th Class XI Kompetensi Kejuruan SK-KD 6 TH.
How to Change Windshield Wipers. Why is it that we never seem to remember to change our windshield wipers? You know you need 'em, you know they're cheap,
School Name Date Volunteer Name Electric Generator SEEDKIT Workshop.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
Remanufacturing the HP 1200 Tom DiPasquale Diamond Tech Associates
ARCH-432 Vapor Retarders and Air Barriers Attendance In what modern day country was the first cavity wall developed and used? For what purpose? A. Spain.
INTRODUCTION Definition:
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
Coil Cooling Workshop Summary June 10, Electrical Isolation: Cladding is isolated from the T by Kapton. The chill plates electrically connect at.
SUMMARY FROM ACI 224.1R-93. When anticipating repair of cracks in concrete, it is important to first identify the location and extent of cracking. The.
Automotive Engines: Theory and Servicing, 6/e By James D Halderman © 2009 Pearson Education, Inc. Pearson Prentice Hall - Upper Saddle River, NJ
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Types of Threaded Fasteners.  Used to hold parts together  Clearance holes in parts  Nut on other end  Can also be used with a threaded hole.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
General Instructions for “KidWind Light” wind tunnel.
Modular Coil Electrical Joint1 NCSX Peer Review Modular Coil Electrical Joint James Chrzanowski April 24, 2006.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
Twisted Racetrack Manufacturing & Metrology. Winding/metrology prototype chronology Various keystoning tests – Completed. –Established keystone effect.
NCSX A. Brooks, P. Fogarty, G. Lovett, D. Williamson June 3, 2005 Modular Coil Type-C Final Design Review – Part II.
Thomas Jefferson National Accelerator Facility Page 1 Clear Mold VPI Visualization D. Kashy S. Christo May 14, 2014.
NCSX NCSX TF Coil Procurement 1 February 3, 2006 Michael Kalish NCSX TF Coil Procurement.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Note location of different length bolts
Processes Used to Form Composite Materials
NCSX David Johnson August 18, 2004 Discussion of Co-Wound Flux Loops.
Model 12 Intek Horizontal OHV
Clarinet Assembly Best assembly to prevent unnecessary repairs.
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Modification of the 11T Dipole impregnation mould Impact on impregnation parameters Remy Gauthier,
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
Fabrication of test coil for D1 2m model Michinaka SUGANO KEK WP3 meeting 08/10/2014.
Wayne, The upper and lower guides are now small enough in mass so they can be made directly from the CAD models by stereolithography, and at a reasonable.
Machine Safety Review. Areas for safety review Identify this machine.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
Build A Motor You must follow the directions step-by-step!
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
METHODS OF CRACK REPAIRS
Coil Design and Fabrication
Step 1: Load paper Before you replace the ink cartridges and begin the alignment process, load paper in the printer. 1) Raise the input tray. 2) Remove.
Assembly instructions for M-K all bolt together hoppercone kit.
1/17/2019.
Reader Swap out Guide.
A lidded box with a snug fitting lid
Presentation transcript:

C1 inspection results T. Meighan

C1 Lead Block Area Upper chill plates bowed upwards from side pressure (?) Top fingers pulled away from winding pack Pinched/torn insulation

Chill plate deformation and impregnation Upper chill plates bowed upwards from side pressure (?) Lack of epoxy under chill plate but glass is wet – may be due to leak during VPI

Chill plate tabs touch across septum

Glass not completely wetted in lead block

Insulation tear Tear in insulation

Insulation tear

Proposed changes Only light pressure to be used to assemble lead block while lining up bolt holes. Slotting bolt holes on top plate should be considered to accommodate larger builds. –Avoids pinching insulation –Avoids bowing top chill plates –Avoids pushing top chill plate tabs together –Avoids too much compression on glass leading to resin starved areas Undersize rib (narrow the width and perhaps height and add chamfer) in top plate to avoid pinching insulation Remove top plate following installation to verify condition inside lead block Care continues to be needed when sealing conductors penetrating the bag mold Long fingers on top chill plates already removed via ECN Improved technique for bending chill plate tabs following C1 should pay dividends on subsequent coils

Proposed Repair of C1 Lead Box Area Rotate C1 on end so that box is facing upward. Machine box lid in some areas to take pressure off pinched areas. (Dry fit lid) Paint epoxy on torn glass and resin starved areas. Insulation Resistance = (15K 7.5KV) Do a wet lay up of glass and epoxy. (CTD 540 Rm Temperature Cure)

More photos