Substitutions Review Questions. 1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda.

Slides:



Advertisements
Similar presentations
Construction Contracting
Advertisements

Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Ensuring that building products meet code requirements ICC Evaluation Service, Inc. The ICC-ES Evaluation Committee conducts open public hearings on proposed.
1 Bid And Proposal Evaluation Bill Shelton Scott Norton
Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Presented by: Kathryn Hodges, NH
Writing Proposals for Oak Ridge National Laboratory Women-Owned Small Business Day Sonny Rogers Contract Services Group Manager Oak Ridge, TN August 24,
Marcy Mealy Procurement Specialist CDBG Program
ESTIMATING By Laith Jacob.
Construction Engineering 221 Drawings and Specifications.
Office of Business Development Training
Partnership Agreements Delegation of SBA’s Contract Execution Authority to other Federal Government Agencies.
Construction Engineering 221 Cost Estimating and Bidding.
Construction Contracts
Construction Contract Documents
Sole Source Training.
What Are Construction Documents Construction documents serve as a means of obtaining bids from contractors and are used by contractors to obtain price.
The Importance of the Qualifications Based Selection (QBS) Process
Federalwide Assurance Presentation for IRB Members.
Construction Specifications
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
Construction Documents Review Questions. 1.The procurement (bidding) requirements are a.a part of the construction documents, but not the contract documents.
Methods of Specifying Review Questions. 1.The four methods of specifying are: a.Performance, descriptive, proprietary and alternate b.Descriptive, performance,
Debarment and Enjoinment Procedures for Construction Steve Owens Senior Assistant Attorney General and Chief Real Estate and Land Use Section Bert Jones.
Warranties Review Questions. 1.The person who becomes secondarily liable for another’s debt or performance is called the: a.Guarantee b.Warrantor c.Guarantor.
Methods of Specifying ACT Objective Recognize the language, proper preparation, and appropriate situation for the four methods of specifying. 2.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Formats Review Questions. 1.Which organizational system is used in the preliminary stages of a project? a.MasterFormat b.UniFormat c.PageFormat d.All.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Project Phases Review Questions.
Drawings Review Questions. 1.The type of line used to represent the extent of the property boundary for site is called the: a.Regulating line. b.Property.
Trivia Certification Program Trivia Mark Foster ODOT Region 1 Liaison and Federal Aid Specialist March 12, 2010.
Gaining a Competitive Advantage Cindy Alligood, Pam Truitt, Mary Alice Applegate  December 3, 2014.
Contractor Alternate Design Serving the Public’s Best Interest.
Conditions of the Contract Review Questions. 1.General Conditions and Supplementary Conditions make up the: a.Specifications b.Bidding Requirements c.Conditions.
UGA Restricted Account Management and Closeout May 10th, 2007.
Contracting Process Overview Agenda Item #12 July 2007.
Specification Language Review Questions. 1.The word “any” when used in specifications means: a.A limited number selected at the discretion of the Contractor.
In September of 2012 the RA Government made amendments in the Resolution No 168 on ‘Regulation of Procurement Procedures". 1. It is the responsibility.
Product Evaluation Review Questions. 1. Product evaluation begins when: a.The characteristics of specific products are examined and assessed b.Final bids.
Division 1 – General Requirements Review Questions.
Geometry Section 2-1 Inductive Reasoning. Then/Now You used data to find patterns and make predictions. Make conjectures based on inductive reasoning.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
Conservation Development and Planning Department Code Compliance Flow Chart for County Code (Zoning & Land Use) Violations COMPLAINT RESEARCH AND PRIORITIZE.
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
SP 11 – CONTRACTOR PERFORMANCE RATING and OTHER CONSTRUCTION RELATED ITEMS UFOMA APRIL 2011.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
NAPA COUNTY Conservation Development and Planning Department Code Compliance Flow Chart Building Code Violations 1 COMPLAINT Written complaint (form, letter,
Shariq Husain, PE INDOT Roadway Review Engineer Highway Design and Technical Support Proprietary Materials – Approval Process.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
Allowances, Alternates, and Unit Prices Review Questions.
Licensing Determinations and Contractor Licensing Responsibility Licensing Determinations The Housing Authority will specify the classification(s) of a.
US Army Corps of Engineers BUILDING STRONG ® Building and Preserving Alaska’s Future Alaska District Design-Build Contracts Moolin Seminar November.
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
Bidding Requirements Review Questions.
Methods of Specifying Review Questions.
(Additional materials)
Product Evaluation Review Questions.
Department of Community Development
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Request for Proposal & Proposal
Demystifying Article 15A – MWBE Requirements
PROJECT DELIVERY METHODS
Manajemen Konstruksi Bidding & Award
GACCP SPRING TRAINING Presentation to: GACCP NOW / COMP Providers
Presentation transcript:

Substitutions Review Questions

1.The correct method to notify that a substitution has been approved during the Bidding phase is by: a.Modification b.Addenda c.Telephone d.Letter

b.Addenda 1.The correct method to notify that a substitution has been approved during the Bidding phase is by:

2.Substitution Procedures are: a.Defined by law b.Specified in Division 1 c.Only allow requests during the bidding phase d.Provide for requests by telephone

2.Substitution Procedures are: a.The General Services Administration b.Specified in Division 1 c.The CSI d.All of the above

3.Substitutions may do all of the following EXCEPT: a.Limit competition b.Increase the specifier’s workload c.Be conductive to permitting products of lower quality d.Increase maintenance replacement costs

3.Substitutions may do all of the following EXCEPT: a.Limit competition b.Increase the specifier’s workload c.Be conductive to permitting products of lower quality d.Increase maintenance replacement costs

4.A method of opening proprietary specifications to alternate products is to: a.Request alternate proposal in specifications b.Permit contractor to submit requests for substitutions c.Define the procedures for controlled substitutions in Division 1 of the Project Manual d.All of the above

4.A method of opening proprietary specifications to alternate products is to: a.Request alternate proposal in specifications b.Permit contractor to submit requests for substitutions c.Define the procedures for controlled substitutions in Division 1 of the Project Manual d.All of the above

5.The construction phase is not the best time to entertain substitutions because: a.It may be difficult to appraise quickly the full effect of the proposed substitution or fully evaluate and research the proposed product b.Substituted items have not been subjected to the competitive bidding process and the cost may not reflect true market conditions. c.When specified items are not available the A/E and Owner feel pressured to approve substitutions with which they have little experience and with which they are not comfortable. d.All of the above

5.The construction phase is not the best time to entertain substitutions because: a.It may be difficult to appraise quickly the full effect of the proposed substitution or fully evaluate and research the proposed product b.Substituted items have not been subjected to the competitive bidding process and the cost may not reflect true market conditions. c.When specified items are not available the A/E and Owner feel pressured to approve substitutions with which they have little experience and with which they are not comfortable. d.All of the above

6.All of the following statements are true concerning the proprietary method of specifying termed open or closed EXCEPT: a.The open proprietary specification allows for substitutions on an as approved basis b.The closed proprietary specification does not allow for substitution c.The terms open or closed do not refer to substitutions.

6.All of the following statements are true concerning the proprietary method of specifying termed open or closed EXCEPT: a.The open proprietary specification allows for substitutions on an as approved basis b.The closed proprietary specification does not allow for substitution c.The terms open or closed do not refer to substitutions.

7.When an item is shown on Shop Drawings that is clearly a substitution that has not officially been requested, the designer should: a.Return the shop drawing without review b.Review the shop drawing and approve everything except the substituted item

7.When an item is shown on Shop Drawings that is clearly a substitution that has not officially been requested, the designer should: a.Return the shop drawing without review b.Review the shop drawing and approve everything except the substituted item

8.Which is a true statement concerning substitutions proposed during the construction phase: a.They are unfair to the unsuccessful bidders. b.They should be considered only to replace unavailable products or to remedy a situation where a specified product has proven unsuitable

8.Which is a true statement concerning substitutions proposed during the construction phase: a.They are unfair to the unsuccessful bidders. b.They should be considered only to replace unavailable products or to remedy a situation where a specified product has proven unsuitable

9.All of the following statements are true regarding the A/E’s substitution policy EXCEPT: a.It should be described in every specification section b.It should be described only in Division 1, section c.Specification section in Division 2 through 14 should direct the reader to the appropriate Division 1 section.

9.All of the following statements are true regarding the A/E’s substitution policy EXCEPT: a.It should be described in every specification section b.It should be described only in Division 1, section c.Specification section in Division 2 through 14 should direct the reader to the appropriate Division 1 section.

10. The A/E might want to restrict substitutions because of which of the following reasons: a.Concerns that proposed substitution are inferior to the items specified because they are unknown. b.Significant amounts of additional time and expense may be required to evaluate the proposed product. c.The concern that proposed substitute product will not perform in all respects the same as the specified product ie.., appearance, performance, fire rating, code compliance, maintenance and lifespan. d.All of the above e.None of the above

10. The A/E might want to restrict substitutions because of which of the following reasons: a.Concerns that proposed substitution are inferior to the items specified because they are unknown. b.Significant amounts of additional time and expense may be required to evaluate the proposed product. c.The concern that proposed substitute product will not perform in all respects the same as the specified product ie.., appearance, performance, fire rating, code compliance, maintenance and lifespan. d.All of the above e.None of the above

11.During the bid phase, substitutions may be proposed by: a.Prime Bidders only b.Subcontractors only c.Suppliers d.Contractors and Subcontractors only

11.During the bid phase, substitutions may be proposed by: a.Prime Bidders only b.Subcontractors only c.Suppliers d.Contractors and Subcontractors only

Answers 1.bb 2.bb 3.aa 4.dd 5.dd 6.cc 7.aa 8.aa 9.aa 10.dd 11. aa