ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.

Slides:



Advertisements
Similar presentations
Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Advertisements

CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012.
© 2007 E.ON Nexus AQ Requirements To support the current business processes We need to maintain performance and enable market operation as is using current.
PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Nexus Workgroup CSEP Transition Topic June
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
PN UNC Workgroup iGT Services 7 th February 2012.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
PowerPoint presentation title Presenter’s name and date Put a visual here.
Double click here to add event title Double click here to add event date Double click here to add event time Double click here to add event location.
PN UNC Workgroup Read Validation 4 th October 2011.
Slide presentation title to go here Secondary information to go here Date to go here.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
PN UNC Workgroup Settlement Issues 1 st November 2011.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
ScottishPower, Energy Retail Gas Long Term Vacant (LTV) Proposal February 2010 Karen Kennedy ScottishPower.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Project Nexus UNC Workstream Consolidation of High-Level Principles Fiona Cottam 19 May 2010.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
CONFIDENTIAL - Modification Proposal 0395 © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
Rolling AQ – Initial Calculation
Supply Point Register 7th December 2011
UNC Modification Proposal 0202 National Grid Distribution
RBD NOTIFICATION PROCESS
Options for Mod 640 Replacement
Project Nexus Workgroup
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Impacts of Project Nexus Implementation Date to AQ17
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
Project Nexus Workgroup
Mod Proposal 0268 : AQ Backstop Date
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
Actions for Mod209 Workgroup
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
PROJECT NEXUS FUNDING – THE CUSTOMER’S VIEW
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Deferral of Retrospective Updates Functionality
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
MOD 640 INVOICING VALIDATION RULES
UNC Modification Performance Assurance Framework Incentive Regime
AQ Review System Calculation Overview
CONFIDENTIAL - Inter Shipper Discussion Process Initial Discussions © 24 November 2009 EDF Energy plc. All rights Reserved.
Modification Proposal 136
Actions Updates Action 0282/006 – Exclude from AQ process
Meter Read Rejections ..
Slide presentation title Secondary information
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
REVIEW GROUP 178 – AN ALTERNATE SOLUTION
PN UNC Workgroup (AQ topic)
Annual Quantity (AQ) 45.
Slide presentation title Secondary information
Presentation transcript:

ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights reserved. METER READ REPLACEMENT STEFAN LEEDHAM 29 December 2009

METER READ REPLACEMENT Stefan Leedham 29 January 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 3 CURRENT ARRANGEMENTS UNC prevents Shippers from replacing a meter read if a subsequent read has been submitted (M 3.7.4) For annual read sites this provides a window of at least 63 days For monthly read sites this provides a window of at least 7 days In electricity suppliers are able to replace meter reads even if a subsequent read submitted LSP sites can undertake a consumption adjustment Inaccurate meter readings can create issues when calculating AQs

METER READ REPLACEMENT Stefan Leedham 29 January 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 4 OBJECTIVES Replace a meter read were a subsequent meter read has been submitted Should be a simple solution Mimics arrangements in electricity Ensure accurate AQ Probably User Pays Focus on SSP

METER READ REPLACEMENT Stefan Leedham 29 January 2009 © Copyright EDF Energy plc. All rights reserved. PAGE: 5 ISSUES Project Nexus Appetite to incorporate LSP solution Requirement for a close out window Costs

ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights reserved. THANK YOU