1 BNL report ~ the history of Run7 start up ~ Yoshihide Nakamiya
2 BBC hardware work Interlock test - one ADAM module was not worked -> replace it to a new module - one thermocouple broke (S2-4) -> will fix after run7 External charge scan - Adc conversion factor (BbcCalib.adc) - find one Adc to lost linearity (Adc[72]) -> replace QVC + ADC Internal charge & timing scan - Tdc conversion factor (BbcCalib.tdc0 & tdc1) - one of test pulse injector was not worked (Adc[85]) -> replace discriminator for Tdc0&Tdc1 - Adc[126] was not worked properly -> replace QVC + ADC for Adc[126] Measurement of noise rate - a few thousand Hz at most (th = 30 mV)
3 Interlock test [結果] ZOOM 交換した ADAM ⇒ Fixed ! 壊れている熱電対 ⇒ run7 の後に修理
4 External charge scan ~ Before replacement ~ ~ After replacement ~ We got proper gain curve for Adc[72] after replacement of two daughter cards (QVC+ADC).
5 Internal charge & timing scan ~ Before replacement ~ ~ After replacement ~ Adc[85] was fixed after replacement of discriminators Tdc0&Tdc1). Adc[126] was fixed after replacement of two daughter cards (QVC+ADC).
6 Calibrations and Time-in Calibrations and Time-in Time-in - Adjust global timing offset ⇒ position delay : 170 fine delay (ch 7) : 60 Pedestal scan - Adc pedestal (BbcCalib.pedstal) HV optimization - magnetic field off ⇒ Run7/070323/opHV_run7_bon_ pdf - magnetic field on ⇒ Run7/070402/opHV_run7_boff_ pdf Gain calibration - PMT gain (BbcCalib.pmtgain) Slewing calibration - slewing parameter (BbcCalib.slewpar0&slewpar1) Update LUT & Data Base
7 Global timing offset was adjusted on v124. Collision events are in the middle of Tdc window. V124 Blue Beam Sync -position delay : 170 -fine delay (ch 7) : 60 Time in
8 pedestal was extrapolated by using gain curve as a function of threshold. run list ========================== Threshold of Tdc0 run # ========================== 5mV run mv run mv run mv run mv run ========================== Pedestal scan
9 BBC play a role of not only trigger but centrality determination. We have to optimize HV to satisfy both requirements. 1) Trigger : MIP peaks must not be cut off by threshold since BBC play a role as trigger. 2) Centrality : We must assure linearity of Centrality. We need to pay attention to overflow of Adc under high multiplicity environment like Au+Au collision. I consider these criteria, especially about PMTs which belongs to the inner ring. HV optimization
10 We optimized HV for B ON. Tdc<2600 Isolation cut HV was optimized ~30 V decrease overflow Tdc<2600 Isolation cut Run Run Tdc<2600 HV optimization : B ON
11 HV optimization : B OFF We optimized HV for B OFF. Tdc<2600 Isolation cut Tdc<2600 Run
12 - tdc0 < isolation cut gain calibration was done. Gain calibation Run (B ON) - tdc0 < isolation cut Run (B OFF)
13 slewing calibration was done. Slewing correction Slewing calibarion Run (B ON) Slewing correction Run (B OFF)
14 LUT : We made LUT ⇒ need z offset from DC guys to finalize it. DB : version 4001 & 4002 were updated ⇒ need z offset from DC guys to finalize it. LUT and DataBase We are waiting for getting z offset calculated by DC&PC.
15 other problems, solutions, remaining tasks other problems, solutions, remaining tasks Laser offset calculation HV mainframe 16 - problem 1 : HV module was tripped - problem 2 : HV mainframe was tripped ⇒ 1) fix 5 fans since 5 fans were not worked 2) replace the HV mainframe 16 Remaining tasks - LUT will be updated (the final version) - Data Base will be updated (ver 4001, ver4002) ⇒ We are waiting for getting z offset calculated by DC&PC in order to finalize calibrations
16 Laser offset calculation Laser offset calculation The special connector were attached in laser fiber of North-bottom. -Laser signal could get delayed. -Laser intensity could decrease.
17 Before correction Affter correction Laser offset calculation Laser offset calculation - Delay depended on laser intensity were automatically fixed by slewing correction - Delay by connection of the connector were fixed by manually as shown above.
18 Laser offset calculation Laser offset calculation Black : before correction Red : after correction We calculated Zvertex offset by laser after corrected systematical delay of North-Bottom.
19 1) HV became Disable. for HV_BB_N-1 & HV_BB_N-1 2) Status indicator shows.. HV_BB_N-1 : 10 HV_BB_N-2 : 40 **status 10 means “Trip -- Violation of supply limits” I'm not sure for status 40 HV mainframe 16 : problem 1 HV mainframe 16 : problem 1
20 1) HV mainframe looks like OFF but actually ON. 2) Measured voltage went to 0V. But HV is “Enable” for HV_BB_N-1 & HV_BB_N-1 HV mainframe 16 : problem 2 HV mainframe 16 : problem 2
21 HV mainframe 16 : Solutions? HV mainframe 16 : Solutions? N4 N3 Slot 0 Slot Slot 11.. N2 N1 0 1 Cable N1 and N2 are separated. ⇒ problem 1 was disappeared Fix fans on the HV crate since 5 fans (total 12 fans) broke HV mainframe 16 was replaced ⇒ problem 2 is not seen so far
22 Remaining tasks Remaining tasks LUT will be updated as the final version Data Base will be updated (ver 4001, ver4002) We are waiting that DC guy’s work has finished for the final update.