Jorgen Christiansen, CERN PH-ESE 1.  Spokes persons and Institute chair elected ◦ SP’s: ATLAS: Maurice Garcia-Sciveres, LBNL CMS: Jorgen Christiansen,

Slides:



Advertisements
Similar presentations
Phase 2 pixel challenges  ATLAS and CMS phase 2 pixel upgrades very challenging  Very high particle rates: 500MHz/cm 2  Hit rates: 1-2 GHz/cm 2 (factor.
Advertisements

Report on INFN activities CHIPIX65 - project
Chip Developments of the Bonn Group Hans Krüger, Bonn University -1-
Jorgen Christiansen on behalf of RD53
Power Distribution Studies at Fermilab Aida Todri, FNAL ATLAS/CMS Power WG Meeting March 31 st, 2010.
Design Tools, Flows and Library Aspects during the FE-I4 Implementation on Silicon Vladimir Zivkovic National Institute for Subatomic Physics Amsterdam,
Status of 65nm foundry access for Aida June 2013 A. Marchioro CERN/PH-ESE.
ACES Workshop 3-4 March, 2009 W. Dabrowski Serial power circuitry in the ABC-Next and FE-I4 chips W. Dabrowski Faculty of Physics and Applied Computer.
ATLAS/CMS/LCD RD53 collaboration: Pixel readout integrated circuits for extreme rate and radiation LHCC status and outlook report June Jorgen Christiansen.
WP1 WP2 WP3 WP4 WP5 COORDINATOR WORK PACKAGE LDR RESEARCHER ACEOLE MID TERM REVIEW CERN 3 RD AUGUST 2010 Michał Bochenek Work Package 3: On-Detector Power.
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
AIDA annual meeting,Vienna, 26th March 2014Václav Vrba, Institute of Physics, Prague 1  design of sensors for production submission  design of the readout.
ATLAS – CMS RD collaboration: Pixel readout integrated circuits for extreme rate and radiation The “pixel 65” collaboration 1.
Pierpaolo Valerio.  CLICpix is a hybrid pixel detector to be used as the CLIC vertex detector  Main features: ◦ small pixel pitch (25 μm), ◦ Simultaneous.
CHIPIX65/RD53 collaboration
J. Christiansen, CERN - EP/MIC
FF-LYNX (*): Fast and Flexible protocols and interfaces for data transmission and distribution of clock, trigger and control signals (*) project funded.
C ONSEQUENCES OF 1MH Z, 20 US TRIGGER ON PIXEL DETECTOR Jorgen Christiansen CERN/PH-ESE 1.
Work Package 3 On-detector Power Management Schemes ESR Michal Bochenek ACEOLE Twelve Month Meeting 1st October 2009 WPL Jan Kaplon.
Specifications & motivation 2  Lowering integration time would significantly reduce background  Lowering power would significantly reduce material budget.
CMS Phase 2 Pixel Electronics meeting – 27/01/2015 Status and plans of pixel electronics simulation framework Elia Conti – PH-ESE.
ASIC R&D at Fermilab R. Yarema October 30, Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout.
Advanced Semiconductor Technologies for SLHC A. Marchioro / PH-ESE.
PHASE-1B ACTIVITIES L. Demaria – INFN Torino. Introduction  The inner layer of the Phase 1 Pixel detector is exposed to very high level of irradiation.
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
RD53 Status Report – July 2014 L. Demaria - Report on RD53 - CMSTK week
RD53 IP WG 1 Jorgen Christiansen / PH-ESE. IP WG agenda General Issues IP block matrix (no recent changes) General schedule Specifications of IP blocks.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
System implementation of a power distribution scheme based on DC-DC converters F.Faccio, G.Blanchot, S.Michelis, C.Fuentes, B.Allongue, S.Orlandi CERN.
Development of Pixel Phase 2 chip. Goals New Pixel Chip needed to go beyond the Phase 1 baseline chip – Should be the solution for Phase 2 pixel – Should.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
REQUIREMENTS FOR A NEW PIXEL CHIP L. Demaria - Torino INFN Lino Demaria - New Pixel Chip - Torino 01/06/2011.
INFN Activities on Pixel Phase 2 Electronics L. Demaria on behalf of INFN institutes: Bari, Padova, Pavia/Bergamo, Perugia, Pisa, Torino 1/28/2014 L.Demaria:
65 nm technology for HEP: status and perspectives Pierpaolo Valerio, CERN on behalf of the RD53 collaboration.
RD53 Analog IP blocks WG : developments and plans at CPPM M. Barbero, L. Gallin Martel (LPSC), Dzahini (LPSC), D. Fougeron, R. Gaglione (LAPP), F. Gensolen,
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
MUG meeting Wrap Up A new version of the CMOS8RF (130nm) Mixed Signal Design kit has been developed at CERN and is ready for release.  Based on the foundry.
DC-DC Conversion Studies – Status Report from Aachen Tracker Upgrade Power WG Meeting February 13 th, 2009 Lutz Feld, Rüdiger Jussen, Waclaw Karpinski,
Round Table discussion We prepared single slides covering –Power –Control/links –Tracker Architectures –Technologies –Trigger/DAQ –Design Libraries –Frameworks.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
Electronics Preparatory Group 6 June Events which happened  Meeting of all the conveners of working groups 
Electronics for HL-LHC trackers NB: Only considering silicon trackers Jorgen Christiansen CERN/PH-ESE Acknowledgements to all my tracker colleagues from.
Current “thinking” about CMS phase 2 pixel: Global system and power 1 Jorgen Christiansen, CERN/PH-ESE.
MUX-2010 DISCUSSION : W HAT DO WE NEED NEXT IN HEP.
Introduction to the Electronics and Readout Systems Session Ph. Farthouat, CERN.
Jorgen Christiansen, CERN PH-ESE 1.  EPIX ITN proposal did not get requested EU funding ◦ CERN based proposals did very bad this time. ◦ I better not.
UPDATE ON CLICPIX2 DESIGN Pierpaolo Valerio Edinei Santin
Jorgen Christiansen, CERN PH-ESE 1.  Finally officially part of CERN grey book: Recognized experiments  Spokes persons and Institute chair elected 
Microelectronics for HEP A. Marchioro / CERN-PH-ESE.
Ideas for a new INFN experiment on instrumentation for photon science and hadrontherapy applications – BG/PV group L. Ratti Università degli Studi di Pavia.
RD53 1.  Full/large demonstrator chip submission ◦ When: 2016 A.Early 2016: If chip must have been fully demonstrated in test beams for TDRs to be made.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Ideas on MAPS design for ATLAS ITk. HV-MAPS challenges Fast signal Good signal over noise ratio (S/N). Radiation tolerance (various fluences) Resolution.
Elia Conti on behalf of the RD53 Collaboration RD53: status and main activities for 2016 ACES 2016 – Fifth Common ATLAS CMS Workshop for LHC Upgrades –
R. Kluit Nikhef Amsterdam ET Nikhef Electronics Technology TGL Ruud Kluit 118-Apr-16.
FE-I4 chip development status ATLAS Upgrade, R.Kluit.
Verification Environment for a Simple Pixel Chip Model Pixel Phase 2 Electronics Meeting during TK Week – E. Conti *, P. Placidi *, S. Marconi.
R. Kluit Nikhef Amsterdam R. Kluit Nikhef Amsterdam Gossipo3 3 rd Prototype of a front-end chip for 3D MPGD 1/27/20091GOSSIPO3 prototype.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
SVD FADC SVD-PXD Göttingen, 25 September 2012
RD53 status and plans. Pixel readout integrated circuits for extreme rate and radiation 4th LHCC status report Jorgen Christiansen and Maurice Garcia-Sciveres.
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
Possible contribution of Pisa on pixel electronics R&D
CERN R&D plans and Infrastructures
FF-LYNX (*): Fast and Flexible Electrical Links for Data Acquisition and Distribution of timing, trigger and control signals in future High Energy Physics.
Access to 65nm Technology through CERN
Valerio Re (INFN-Pavia) on behalf of the RD53 collaboratios
SVT – SuperB Workshop – Frascati Sept. 2010
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

Jorgen Christiansen, CERN PH-ESE 1

 Spokes persons and Institute chair elected ◦ SP’s: ATLAS: Maurice Garcia-Sciveres, LBNL CMS: Jorgen Christiansen, CERN ◦ IB chair: Lino Demaria, Torino  We have had our first formal IB meeting ◦ 2-3 times per year  Planning first (2 nd ) RD53 workshop for spring 2014 at CERN ◦ Finding good date is a real pain.  3 additional institutes have requested to become members: OMEGA, Milano, Czech Technical University + institute of physics, (Sevillia ?, Taiwan ?). ◦ We have a preference to get organized before welcoming new institutes.  MOU in the pipeline.  RD53 is getting rather well known as a good example of a focussed ATLAS/CMS R&D: ◦ Now we have to prove that this works efficiently !.  Some working groups have gotten started (to get organized)  Some RD53 institutes have gotten funding (INFN) 2

 Goals: Radiation test and qualification of 65nm ◦ Radiation test procedure -> Report ◦ Test of basic devices -> Report ◦ Test of digital cells (standard cell library) ◦ Spice models of radiated devices ◦ Recommendations to designers ◦ (Evaluation of alternative technologies if required)  Convener: Marlon Barbero (CPPM)  2 meetings held  Coordination of radiation test structures and radiation tests  Radiation test procedure document in the pipeline  If chips kept cold (-20 – 20 deg. C) then signs of problems with PMOS at ~100Mrad radiation levels ◦ Annealing:  -20: None ?  Room: Some annealing, but how much ?  Hot (80 – 100): Good annealing but how much and how fast ? ◦ Annealing will be a critical aspect for pixel phase 2  Running scenario: -20 deg with ~2weeks at room temperature per year ◦ We should soon have more annealing results from CPPM with CERN test structures. We will get 100MRad per year in inner layer ! 3 CPPM

 Goals: ◦ Analog front-end(s)  For different sensors  Different architectures (TOT, ADC, Auto zeroing, etc.) ◦ In the end we will need 1-2 for ATLAS/CMS  Area, power, noise, dead-time, radiation tolerance, linearity, simplicity,,, ◦ Basic analog building blocks (references, bias DAC, etc.)  Coordination with IP blocks WG  Convener: Valerio Re  First meeting with presentation from institutes ◦ Many groups wants to look at “their” specific architecture  To be defined how work across groups and different architectures can be best optimized for our final goal. ◦ Not just individual non-connected designs 4

 Goals: ◦ One common simulation and verification framework ◦ Evaluation of different architectures with this framework ◦ Definition of how to include IP block in simulation ◦ Verification of final designs  Convener: Tomasz Hemperek (Bonn)  First meeting with presentations of groups interested: ◦ Bonn, Perugia, CERN, NIKHEF (mixed signal, DFT), (LBNL, PISA, RAL  Simulation language/tool ◦ System Verilog + UVM (Mini ◦ C++ or other  First goals: ◦ Tool/language ◦ General framework architecture ◦ Shared repository ◦ Defined interfaces ◦ Define who contributes what 5

 Goal: Implement required basic building blocks ◦ Define list of required IPs and who makes what ◦ Standardized requirements for IPs  Use of metal layers, pins, analog/digital isolation,,, ◦ For each IP: Specifications, design, prototyping, test, radiation hardness, documentation, simulation model, available on IP repository for RD53  Convener: Not yet assigned ◦ J.C. will bootstrap until “things” more clear and convener can be found  Short term goal: ◦ List of IPs (20 – 50) and make interest matrix across RD53 groups ◦ Assign an institute(s) to each needed IP 6

 Goals: Define appropriate schemes and tools to integrate complex mixed signal functions into working pixel chip ◦ Layout (e.g. Technology options, layer mapping), powering, noise coupling, Final design verification,  Convener: not yet assigned ◦ M.G.C. will bootstrap until “things” more clear and convener can be found  Short term goals: ◦ Understand what is covers and what is required 7

 Goals ◦ Define standardized I/O interface of pixel chips ◦ Define and implement I/O blocks  Some overlap with IP blocks Standardized pixel chip interfaces also allows to standardize pixel chip test systems  Convener: Not yet assigned 8

 TSV (affects TOP, IO and IP WGs) ◦ Coarse TSV to get power and IO signals out on back side and have much less module overlap caused by wire-bonding.  Standardized/common test systems: hardware, firmware, software ◦ For “near” final pixel chips (not for small block submissions)  High speed readout on low mass cables ◦ Speed, distance, cable,, ◦ Interface to optical links (LPGBT)  Powering ◦ DC/DC versus Serial powering ◦ On-chip power conversion ◦ Off-chip power conversion  Module design/cooling  Other ? 9