E. GschwendtnerMDI, 18 Feb 20111 Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.

Slides:



Advertisements
Similar presentations
Lau Gatignon / CERN for MDI team. MDI is very different between ILC and CLIC:  Organization wise (ILC in experiments, CLIC on machine side)  QD0 technology.
Advertisements

An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
Machine Detector Interface Lau Gatignon / CERN-EN.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
CLIC Cost & Schedule WG: mandate, organization, activities 2009 Ph. Lebrun CERN, Geneva, Switzerland TILC’09 Tsukuba, Japan.
CLIC Post-Collision Line and Dump
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Status of MDI+BDS Cost Estimate Lau Gatignon. Summary ItemkCHFComments 4 QD0 magnets1340But replaceable item! IP feedback system610Preliminary Pre-alignment.
Beam Physics Work D.S List of Workpackages Area packages Main beam electron source (Steffen Doebert) Main beam positron source (Steffen.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Agenda : CLIC Civil Engineering and Services (CES) WG.
Draft MDI Action plan Presented by Lau Gatignon 25 September 2009.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
CLIC Beam Physics Working Group D. Schulte
Recent news from CLIC C&S WG and CLIC-ILC WG on General Issues Ph. Lebrun CLIC Project Meeting 1 June 2011.
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
CLIC MDI STATUS Lau Gatignon / CERN On behalf of the MDI Working Group LCWS13, Tokyo, 12 November 2013.
REMOTE-HANDLING OVERVIEW I. Bailey Cockcroft Institute / University of Liverpool.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
H.Schmickler, 4th ACE meeting May 2009 Update on CDR issues; Organization of technical work towards CDR 1.CDR vs TDR 2.CDR schedule 3.Highest priority.
CLIC Post-Collision Line and Dump Edda Gschwendtner, CERN for the Post-Collision Working Group Rob Appleby (CERN & Cockcroft Institute), Armen Apyan (CERN),
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
MDI towards technical design Lau Gatignon. Very preliminary ! To trigger discussions.
Introdcution to Workpackage/Activity Reflection D. Schulte.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
MDI Action plan Presented by Lau Gatignon 6 October 2009.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Electromagnetic Background From Spent Beam Line Michael David Salt (Cockcroft Institute – Optics, Backgrounds) Robert Appleby (CERN.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
CTC Work Packages ver 2.1 HS for CTC. CTC-001SC wigglers Cooling design, hor. or ver. Racetrack coil Nb3Sn or NbTi cable Prototypes construction Experimental.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
FCC-ee Interaction Region design
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
1st FCC Infrastructure & Operation meeting
Installation of an Instrument on a CERN machine
LHC schedule.
CLIC / ILC Collaboration for CFS works
Beam Delivery Systems and the Machine-Detector Interface Terms of Reference for the CLIC-ILC Collaboration Working Group B. Parker (BNL), D. Schulte.
CLIC Study Aim Conceptual design report in 2010
CLIC Post-Collision Line and Dump
CLIC-ILC BDS & MDI work.
Future Collider Projects at CERN
BG - SPS BDF - PBC WS March 2017
STFC Contributions to the FCC Study
Beam Dump outline work plan (UK perspective)
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
HIE-ISOLDE Project: Planning & Resources
CLIC Detector CERN Status + plans
CLIC damping rings working plan towards the CDR
Laser Und XFEL.EU Experiment
Presentation transcript:

E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work on the post-collision line, the main dumps and the drive-beam dumps. The PCLD Working Group shall oversee the detailed work needed for the conceptual design report (CDR) of the PCLD until mid The WG is responsible for documenting the concept of the post-collision line and dumps in the CDR write-up and in form of parameter specification documents in the CLIC PBS on the EDMS repository. The main topics are: – Conceptual design of the CLIC main beam dumps, based on the ILC main beam water dumps proposal. – Conceptual design of the drive beam dumps, based on the SLAC 2.2 MW water dump. (N.B. The drive beam optics to the dumps is the responsibility of BE-ABP.) – Cost estimates of the drive beam dumps and main dumps. – Conceptual design of the post-collision line (magnets, vacuum, absorbers and intermediate dump). – Conceptual luminosity monitoring – Beam background backsplash from the post-collision collimators and dumps into the detector

E. GschwendtnerMDI, 18 Feb Work-packages and issues that will be treated in the PCLD Working Group in the technical design phase : Designs/Studies: – Optimization of the post-collision beam optics with respect to the design of the main beam dump. – Optimization of the drive beam dump. – Dump Instrumentation for luminosity monitoring and machine protection. – Radiation environment, radiation shielding, impact on environment and safety issues in the post-collision line and dump regions. – Beam pipe, beam vacuum, vacuum infrastructure and vacuum windows. – Follow-up of beam background backsplash from the post-collision collimators and dumps into the detector. – Evaluation of temperature and pressure behavior in the dumps, water circuit layout, window integrity and cooling as well as isotope production in the dumps. – Proposal for Tritium and hydrogen management in dumps. – Window, water circuit and dump tank maintenance, remote handling, automated window replacement. – Integration of the dumps (link to CLIC Civil Engineering and Services (CES) Working Group). Experimental/Construction work: – Engineering Design for a 10 MW dump ready for use with beam, when under the name of “CLIC0” a full drive beam accelerator demonstrator is planned to be built at CERN in the period

E. GschwendtnerMDI, 18 Feb Meetings – The PCLD Working Group meets about every 6 weeks. Reporting – The PCLD Working Group reports to the CLIC Technical Committee (CTC). For certain topics the Working Group shall propose speakers for CLIC Friday meetings, the Machine and Detector Interface (MDI) meetings or the Linear Collider Detector (LCD) meetings. – The PCLD Working Group shall report to the CLIC Cost and Schedule Working Group on request. Milestones – The PCLD Working Group must have submitted the Conceptual Design Report (CDR) of the Post- Collision Line and Dumps until mid The Composition of the Post-Collision Line and Dumps Working Group – Appleby Robert (Cockcroft Institute), Apyan Armen (EN-MEF), Deacon Lawrence (EN-MEF), Gatignon Lau (EN-MEF), Gschwendtner Edda (EN-MEF), Jeanneret Bernard (BE-ABP), Lefevre Thibaut (BE-BI), Losito Roberto (EN-STI), Maglioni Cesare (EN-STI), Modena Michele (TE-MSC), Salt Mike (Cockcroft Institute), Tomas Garcia Rogelio (BE-ABP), Veness Raymond (TE-VSC), Uythoven Jan (TE-ABT), Vlachoudis Vasilis (EN-STI), Vollaire Joachim (DGS-RP). – Possible collaborations with e.g. ILC, Indian or Polish institutes. – Chairperson: Gschwendtner Edda