Office of the Federal Coordinator for Meteorology OFCM Assessment of MPAR Capability to Meet Agency Needs Jud Stailey, OFCM Executive Secretary, MPAR EC.

Slides:



Advertisements
Similar presentations
Introduction to Military Certification Office
Advertisements

Introduction to the Joint Capabilities Integration and Development System (JCIDS) CAPT Keith Bowman, Joint Staff, J-8 Hello, I am Captain John Costello.
Capabilities and Acquisition Division
Session 6: Way Ahead to Address MPAR Risk Reduction— Implementation Strategy and Interagency Management Approach Moderator: Dr. Paul D. Try, Science and.
Presented to: Right Sizing Team By: Ken Hamm, AJP-6830 Aviation Weather Office Date: July 14, 2010 v0.1 Federal Aviation Administration Aviation Weather.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
NSS SMC/XR Template SMC April 2008; rev19 Program Management
Presented to: By: Date: Federal Aviation Administration Early Tests of Aircraft Tracking on NWRT PAR Working Group William Benner, Weather Processors Team.
Gate 1 Input Criteria Objectives of Top Leadership Teams/CDR’s Intent Completed CBA Completed Service review of ICD Identification of mutually shared needs.
Presented to: MPAR Symposium By: William Benner, Aviation Weather Group, Operations Planning Date: 12 October 2007 Federal Aviation Administration Multi-function.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
Presented to: MPAR Symposium II By: James Williams – Director, Systems Engineering and Safety Date: 17 November 2009 Federal Aviation Administration Multifunction.
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
MIT Lincoln Laboratory 2007 MPAR-1 JSH 5/2/2007 Session 2: Current State of Military Investment in PAR Panel Lead: Dr. Jeffrey Herd (MIT LL) Panelists:
Multi-function Phased Array Radar Findings of the Joint Action Group
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
Mr. Samuel P. Williamson Federal Coordinator for Meteorology Sponsored by: The Office of the Federal Coordinator for Meteorological Services and Supporting.
MondayTuesdayWednesdayThursdayFriday Time Lunch / PT – 1200 Course Number: X-XX Classroom: 1606 Humphreys Hall.
EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities.
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) E-Business/SPS Joint Users’ Conference November 15-19, 2004 Houston, TX.
Office of the Federal Coordinator for Meteorology 1 Office of the Federal Coordinator for Meteorological Services and Supporting Research (OFCM) Briefing.
1 AIR Lakehurst Services Acquisitions PAO Approved SPR Contractor Support Services Acquisition.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
1 THE NATIONAL SPACE WEATHER PROGRAM Sixth Symposium on Space Weather Session 1: Space Weather Agency Updates AMS Annual Meeting January 12, 2009 Mr. Samuel.
Protecting GPS Transportation Infrastructure – Action Plan Status Report 43rd CGSIC Meeting Washington, DC March 10, 2004  CDR Peter Keane U.S. Department.
Presented to: MPAR Working Group By: Garth Torok, Weather Processors Group, Aviation Weather Directorate Date: 21 June 2007 Federal Aviation Administration.
Maj Richard “Krash” Krasner Directorate of Requirements Headquarters Air Force Space Command Air Force Space Command's Environmental Monitoring Requirements.
DHS Airspace Surveillance Requirements MPAR Symposium Randel Zeller Science and Technology Directorate Department of Homeland Security Director, Interagency.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
National Wildland Fire Weather Needs Assessment National Wildland Fire Weather Needs Assessment Mr. Mike Babcock Senior Staff Meteorologist, OFCM CCAMS.
Meteorological Spectrum Issues- Outcome of the 2003 World Radiocommunication Conference Presented By: David Franc National Weather Service December 2,
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
Update on Multifunction Phased Array Radar (MPAR)
Life Cycle Logistics.
Presented to: By: Date: Federal Aviation Administration Weather R&D Research to Operations 3 rd National Surface Transportation Symposium Gloria Kulesa,
Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver September 11, 2007 Legacy Radar Lifecycle Cost Data Analysis Update Magda Batista-Carver,
Presented to: By: Date: Federal Aviation Administration Multifunction Phased Array Radar PAR Work Group Magda Batista-Carver June 21, 2007 Radar Operations.
Joint Planning and Development Office (JPDO) Col Mark Weadon Air Force Weather Deputy for Federal Programs May 17 th,
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
Moving Towards GEOSS Vice Admiral Conrad C. Lautenbacher, Jr., U.S. Navy (Ret.) Under Secretary of Commerce for Oceans & Atmosphere Future National Operational.
MPAR Symposium / Implementation Strategy MPAR Risk-Reduction Implementation Strategy Fiscal Year RDT&E NSSL, MIT/LL, others.
Presented to: MPAR Working Group By: Jim Williams, Director of Systems Engineering, Operations Planning Date: 11 September 2007 Federal Aviation Administration.
1Office of the Federal Coordinator for Meteorology OFCM OFCM Special Session: Uncertainty in Atmospheric Transport and Diffusion (ATD) Models Setting the.
1 KURT HONDL, NSSL MPAR PROJECT MANAGER OFCM MPAR WORKING GROUP MEETING 19 JUNE 2012 NOAA/NSSL Activities.
Symposium On WEATHER INFORMATION FOR SURFACE TRANSPORTATION “Preparing for the Future: Improved Weather Information for Decision-Makers” December 4 - 6,
Multifunction Phased Array Radar (MPAR) Update 1ICMSSR 12/16/11 ICMSSR Meeting December 2011 Doug Forsyth, Co-chair, WG/MPAR.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of: 3/1/2016 Air Force Weather Agency CEISC Committee Focus Shift - Proposed Modification to.
Office of Major Project Development (OMPD) Overview November 2015.
Douglas E. Forsyth National Severe Storms Laboratory Executive Director for Facilities and Strategic Planning Chief, Radar Research and Development Division.
Summary of the Report, “Federal Research and Development Needs and Priorities for Atmospheric Transport and Diffusion Modeling” 22 September 2004 Walter.
DoD Procurement Conference and Training Symposium May 13, 2010 Peer Reviews Dick Ginman Deputy Director, DPAP.
Business, Cost Estimating & Financial Management Considerations
Acquisition Support New Horizons Consulting Services, LLC’s, premier business unit is an offering of a full range of services and support for acquisition.
Contracting (Product) Considerations
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Life Cycle Logistics.
MNS - Mission need statement
MDD to Milestone A Requirements Management Activities
NSS SMC/XR Template SMC April 2008; rev19 Program Management
Architecture Tool Vendor’s Day
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) Good Morning Today I am going to give you an overview and update on the Analysis.
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Presented to Friends & Partners of Aviation Weather
USMC WARGAMING CAPABILITY
OMNIBUS PROGRAM OVERVIEW
Joint Program Executive Office for Chemical and Biological Defense
The Department of Defense Acquisition Process
Presentation transcript:

Office of the Federal Coordinator for Meteorology OFCM Assessment of MPAR Capability to Meet Agency Needs Jud Stailey, OFCM Executive Secretary, MPAR EC December 14, Multifunction Phased Array Radar (MPAR)

MPAR Risk-Reduction Strategy Fiscal Year RDT&E NSSL, MIT/LL, others NWRT Demo 1 Wx Demo 2 Wx/Acft Algorithm DevAlgorithm & Software Dev Tradeoff Analyses Testing Upgrade to Active Sub-array Scan Strategies FAA IOC for Wx & ASR RFI Concept Def 3 Contractors, FP Solicit Industry Day Award RFP 2 Contractors, CPFF Fly-Off Full RFP Dev Solicit RFP RFP Dev Award Cost-Benefit Study Pre-Prod Model RFP Dev Dev Limited Prod 1 Contractor, CPFF Solicit Award OT&EDT&E Concept Definition / System Development Analysis of Alternatives Siting/Spectrum Site Surveys Site Acq & Prep Spectrum Approvals Spectrum & Siting Requirements Analysis Management Approach Agency Internal Test & Eval Org Ops Support Org Program Council Oversight Joint System Program Office Ops Concept Development Reqts Analysis Reqts Def Definition & Refinement Employment Concept Refinement P3I Dev Tradeoffs – Design to Budget Refinement DOD CPD DOD CDD DOD ICD DOD FSA DOD POM Bld DOD DP KDP1 (Def need, priority, and $) KDP2 (Select design & move to demo/test) KDP3 (Full Scale Dev) KDP4 (Full Prod) DOD DP Mission & Service Needs Analysis and Requirements BASC Study Svc Analysis FAA DP Init Acq Review Wx & Air Replace ASR-8/9? Replace 88D?

Ops Concept Development Reqts Analysis Reqts Def Definition & Refinement Employment Concept Refinement P3I Dev Tradeoffs – Design to Budget Refinement DOD CPD DOD CDD DOD ICD DOD FSA DOD POM Bld DOD DP KDP1 (Def need, priority, and $) KDP2 (Select design & move to demo/test) KDP3 (Full Scale Dev) KDP4 (Full Prod) DOD DP Mission & Service Needs Analysis and Requirements BASC Study Svc Analysis MPAR Risk-Reduction Strategy Fiscal Year RDT&E NSSL, MIT/LL, others NWRT Demo 1 Wx Demo 2 Wx/Acft Algorithm DevAlgorithm & Software Dev Tradeoff Analyses Testing Upgrade to Active Sub-array Scan Strategies FAA IOC for Wx & ASR FAA DP Init Acq Review Wx & Air Replace ASR-8/9? Replace 88D?

MPAR Risk-Reduction Strategy Fiscal Year RDT&E NSSL, MIT/LL, others NWRT Demo 1 Wx Demo 2 Wx/Acft Algorithm DevAlgorithm & Software Dev Tradeoff Analyses Testing Upgrade to Active Sub-array Scan Strategies RFI Concept Def 3 Contractors, FP Solicit Industry Day Award RFP 2 Contractors, CPFF Fly-Off Full RFP Dev Solicit RFP RFP Dev Award Cost-Benefit Study Pre-Prod Model RFP Dev Dev Limited Prod 1 Contractor, CPFF Solicit Award OT&EDT&E Concept Definition / System Development Analysis of Alternatives Siting/Spectrum Site Surveys Site Acq & Prep Spectrum Approvals Spectrum & Siting Requirements Analysis Management Approach Agency Internal Test & Eval Org Ops Support Org Program Council Oversight Joint System Program Office FAA DP Init Acq Review Wx & Air Replace ASR-8/9? Replace 88D? FAA IOC for Wx & ASR Ops Concept Development Reqts Analysis Reqts Def Definition & Refinement Employment Concept Refinement P3I Dev Tradeoffs – Design to Budget Refinement DOD CPD DOD CDD DOD ICD DOD FSA DOD POM Bld DOD DP KDP1 (Def need, priority, and $) KDP2 (Select design & move to demo/test) KDP3 (Full Scale Dev) KDP4 (Full Prod) DOD DP Mission & Service Needs Analysis and Requirements BASC Study Svc Analysis

Office of the Federal Coordinator for Meteorology OFCM 5 Assessment of MPAR Capability Background WG/MPAR challenges to establishing requirements: Number of agencies and relationship Different agency definitions and processes Different potential role of MPAR in terms of meeting discrete versus broad needs Different level of understanding of potential MPAR capabilities Lack of the right resources to do the work

Office of the Federal Coordinator for Meteorology OFCM 6 Assessment of MPAR Capability Background Action Item from MPAR Symposium II: Mission needs assessment Identify current radar-related shortfalls and needed improvements Consider both technology / equipment and services

Office of the Federal Coordinator for Meteorology OFCM 7 Assessment of MPAR Capability Approach Start with potentially easier to define needs: FAA Replacement of ASRs and TDWR Replacement of long range radars (?)

Office of the Federal Coordinator for Meteorology OFCM 8 Assessment of MPAR Capability Approach (Cont’d) Address more complex needs: NWS weather surveillance CORL & Weather Radar 20-Year Vision Planning Report Weather Service Improvements diagram Homeland/National Defense Air Surveillance: IS CONOPS, NORAD input, other available data Air Surveillance Service Improvements diagram

Office of the Federal Coordinator for Meteorology OFCM Multifunction Phased Array Radar 9

Office of the Federal Coordinator for Meteorology OFCM 10

Office of the Federal Coordinator for Meteorology OFCM Assessment of MPAR Capability 11 FAA ASR & TDWR Needs DoD LRR Needs NWS Weather Observing Needs (CORL) DHS Surveillance Needs

Office of the Federal Coordinator for Meteorology OFCM Assessment of MPAR Capability 12 FAA ASR TDWR Needs DoD LRR Needs NWS Weather Observing Needs (CORL) DHS Surveillance Needs MPAR Capabilities

Office of the Federal Coordinator for Meteorology OFCM Assessment of MPAR Capability 13 FAA ASR TDWR Needs DoD LRR Needs NWS Weather Observing Needs (CORL) DHS Surveillance Needs MPAR Capabilities

Office of the Federal Coordinator for Meteorology OFCM 14 Approach Not creating a programmatic document Every agency has a different acquisition system May not have the same documents Even if they have the same documents, the requirements for those documents will not be the same Avoid using a standard name for product Could follow an agency’s template Assessment of MPAR Capability

Office of the Federal Coordinator for Meteorology OFCM 15 Approach (Cont’d) At some point a program office will get agency agreement on a procurement model At this point we should create documentation that meets our needs Understanding what agencies need Helping define technical challenges and prioritize work (input to R&D Plan) Educating decision makers on what needs MPAR can meet Assessment of MPAR Capability

Office of the Federal Coordinator for Meteorology OFCM 16 Recommendation Task WG/MPAR to Consider and define the potential applications for needs assessment Determine the type of needs information that would suit those applications Gather the needs information Assess the capability of MPAR to meet the multi-agency needs Assessment of MPAR Capability