TOC & HPR Data Acquisition SM18 Raul Valera Teruel Rev 12015-05-26.

Slides:



Advertisements
Similar presentations
Click to edit Master subtitle style Wireless Irrigation Control and Monitoring.
Advertisements

VSH2 Nitrogen Over Hydraulic Unit
Air and Water Chiller Basic Class
MCS LWC MAGNUM ORIGINAL CONCEPTS  Designed to Control Loop Systems  Build to be generic and handle many configurations of Loop Controllers  Type of.
Ultrasonic washer and HPR The 3nd IHEP-KEK SC collaboration meeting Ultrasonic Washer and HPR device for 9-cell 1.3GHz Cavity Zhongquan.Li, Jiyuan Zhai,
Chapter 7 Discrete Control Using Wireless Field Devices.
6200 Calorimeter Operation Colby College Version Parr Instrument Company.
Heat pumps and their economics. There has been fluctuations before Johnson Controls2.
The Life Safety Surveyor Facility Tour
ADAM-4572 Ethernet To Modbus Solution Ethernet to Modbus Data Gateway
SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Cleanroom refurbishment in SM18 Upgrade for the SPL high gradient resonators 26/11/2010J. Chambrillon - CERN BE/RF1.
Pump is Blue part (right) - timer is black (left side) New Electrical Outlet This Photo shows where the Re-Cir pump is installed on the Output line on.
PUMP TESTING BY KAUSTUBH V GITAPATHI DIRECTOR VI AUTOMATION (P) LTD, PUNE.
9-cell Nb cavity seminar Dec.01, 2009 Facilities for 9-cell Nb cavities.
Domina PLUS B WORKING DIAGRAMS TROUBLESHOOTING INTERNAL VIEWS WIRING DIAGRAMS INSTALLATION 03 PREVIOUS MODEL.
Experts in Chem-Feed and Water Treatment An Overview of Possibilities Dulcometer Disinfection Controller ( DDC )
Component Environmental Test Chamber Jeff Hughes 1, Peter Adam 1, Thong Vo 2 and Phong Ngo 2 1. Department of Mechanical and Material Engineering, 2. Department.
Revolution Centrifugal Pump
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December.
20/10/ PHOS Cooling status (1-20 Oct) Brief 28 Sep start cool down. Steps was: +5, -3, -10, -15, -20, -25, -30°C (by liquid).
TOC & HPR Data Acquisition SM18 Raul Valera Teruel Rev
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
WHIRLPOOL STEAM WASHER Presented by: Rick Kuemin, MSA Training Director Brought to you by:
© ABB University - 1 Revision C E x t e n d e d A u t o m a t i o n S y s t e m x A Chapter 16 Alarm and Events Course T314.
Roof Top Unit Overview (MAGNUM) Visit us at Revision- 12/17/2015.
CUE – Make Any Pump an E-Pump
Cryolab Deployment Raul Valera Teruel Pablo Fernández López 2015/11/10.
Magnum Chiller Plant Manager
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
Raul Valera Teruel Pablo Fernandez Lopez 2015/09/29.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Multiple Module Vacuum Oven Productivity Enhancement System.
ESP SYSTEMS INNOVATIVE BOTTLE PROCESSING Cristian Clerici Product Manager Washing & Automation Solutions.
GTK GAS COOLING SYSTEM Marco Statera, Vittore Carassiti, Ferruccio Petrucci, Luca Landi, Stefano Chiozzi, Manuel Bolognesi NA62 - GTK working group meeting.
Free cooling on RTAF Chiller
Knit Dyeing Machines.
IMPLEMENTATION LOCATION VARIABLE AXIS LUBE VARIABLE SPINDLE LUBE PARAMETERS ELECTRICAL SERVICE MINIMAL LUBE SYSTEM.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
18 MW TURBINE CONTROL PANEL
Alice TOF Production Readiness Review Gas Control Systems.
BioTector COD TOC TN analyzer
The BioTector B7000i TOC analyzer with integrated oxygen concentrator
Gaseous N2 -196⁰C Vacuum Liquid N2 -196⁰C Radiation shields Outer wall
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Heat to air update August 9th, 2017.
Cleanroom Upgrade in SM18 Optical Inspection bench
DISCUSSION Flashback Diagram flow Dream world Main points
Gas System Commissioning
LCLS-II 2K Cold Box Controls Design Review
Testing.
Mathieu, Gabriel, Max, Spyros, Guillaume
1. Check reaction 2. Check water 3. Check heater 4. Check gas
352MHz Klystron Control for the 3MeV Linac test stand
ATLAS Thermosiphon Electrical Distribution and Run Modes
BY KAUSTUBH V GITAPATHI DIRECTOR VI AUTOMATION (P) LTD, PUNE
Sharing a Printer Between Windows Computers First of all Install the printer on the computer that will be sharing it.
Which Parts Get Affected Due to a Bad Radiator
Module 1: System Overview
The BioTector B3500ul TOC analyzer Process Tests
Roof Top Unit Overview (MAGNUM)
Loop Water Controller Overview
IMP Cryomodule Assembly and Alignment
INSTITUTE OF HIGH ENERGY PHYSICS
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

TOC & HPR Data Acquisition SM18 Raul Valera Teruel Rev

Parts of presentation Total Organic Carbon (TOC) system. – Ethernet connection & PLC installation. High Pressure Rinse (HPR) system. – Ethernet connection. – Access to laptop and PLC. – List of parameters. LabVIEW application. – Modbus. – OPC server.

TOC - Overview Control Room TOC

TOC – PLC & Ethernet Installation TN PLC

HPR - Overview Control Room TOC HPR

HPR – Ethernet Installation TN

HPR – Network Schema CERN TN

HPR – List of parameters Actual StatusActual Inner Purge TimeActual Set Dry RPM Cabinet Unload Door Lock Fail Auto Recovery RunningRotation Enabled Wand Lift Vertical Drive Not Ready Actual N2 Heater Temp Actual Outer Purge Time Actual Set Dry CyclesHeater Interlock FailWindows Closed Rotation Reverse Enabled Wand Lift Vertical MC Not Ready Actual FlowActual Dry TimeActual Lift StatusHeater OffAutomation Paused Rotation Table Home Running Recipe Not Found Actual ReistivityActual Set Top Of CavityActual Lift Percent Heater High Temperature Keyswitch OverrideTemp Control EnabledHigh Pressure Pump EMO Actual RPM Actual Set Bottom Of Cavity Cabinet Load Doors Open Incoming DIW Low Flow Wand Moving Incoming DIW Sample Enabled High Pressure Pump Fault Actual Rinse Cycles Actual Set Top Of Bellows Cabinet Unload Doors Open Incoming DIW High Flow Wand Overtavel Bypass Running Outgoing DIW Sample Enabled High Pressure Pump Stage 1 Fail Actual Dry Cycels Actual Set Bottom Of Bellows Cabinet Access Open Incoming DIW Low Resistivity Wand At Down PositionHPP EnabledHigh Pressure Pump Stage 2 Fail Actual Waste Water pH Actual Set Number Of Bellows Cabinet Computer Access Open Outgoing Waste Water Low pH Wand Ready Manual Mode Running High Pressure Pump Stage 3 Fail Actual Pump Speed Actual Set Nozzle Length Cabinet Plenum Full Outgoing Waste Water High pH Main Power Fail Valve Override Running High Pressure Pump Leak Detected Actual Pump StatusActual Set Rinse SpeedCabinet Exhaust Fail Rotation Table Home Fail Wand Lift Pause ButtonPower Present High Pressure Pump Compartment Door Open Actual TimeActual Set Rinse RPMCabinet CDA Fail Rotation Table Low RPM Wand Lift Vertical Negative Overtravel Alarm SilencedHigh Pressure Pump CDA Fail Actual Rinse TimeActual Set FrequencyCabinet N2 Fail Rotation Table High RPM Wand Lift Vertical Positive Overtravel Alarm Present Actual Set Dry Speed Actual Set Rinse Cylces Cabinet Load Door Lock Fail Power OffPLC Not CommunicatingReady To Start

LabVIEW application Main application for HPR and TOC systems. Modbus connection. *Possibility to create an OPC server. LabVIEW V3 V4 V5 TOC HPR LabVIEW TOC HPR OPC SERVER V3 V4 V5 LabVIEW

Thank you for your attention! If you have any question, please feel free to ask me!