Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.

Slides:



Advertisements
Similar presentations
Software change management
Advertisements

Configuration management
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Coherent Web Sustaining Engineering Plan 1. The Coherent Web team will: Utilize two-week development “sprints” to plan and track implementation activities.
Smart Connect – Supplier Portal Training Module 2 – Creation of Service Confirmation.
Request Material Information Use Case Item as created in Optiva. Supplier information request(s) can happen at any time. The same process works for Optiva.
1 The IIPC Web Curator Tool: Steve Knight The National Library of New Zealand Philip Beresford and Arun Persad The British Library An Open Source Solution.
SE 555 Software Requirements & Specification Requirements Management.
1 Info 1409 Systems Analysis & Design Module Lecture 5 - Feasibility HND Year /9 De Montfort University.
1 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Tipologie di Audit e loro caratteristiche Riunione sottogruppo GCP-GIQAR 21 Marzo 2006 Francesca Bucchi.
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
Configuration Management
Development plan and quality plan for your Project
Software Configuration Management
Management of Change Control. Overview Changes – Good or bad? Forced or voluntary? The Importance of Change Control Major Changes to both legacy company.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Web Development Process Description
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
Software Configuration Management
What is SMEcollaborate Primarily developed for Small and Medium Companies who wish to collaborate together. It is a:- A resource center for collaborating.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
 To explain the importance of software configuration management (CM)  To describe key CM activities namely CM planning, change management, version management.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Save a Tree: Use an eForm Automating IT Change Request Management Processes (Concurrency IT Department)
Configuration Management (CM)
CERN Draft 0.3 – after meeting July 29th, 2011IMWG - Workflow sub working group - draft after meeting.
Software Quality Assurance
Scott Butson District Technology Manager. Provide professional to all district staff Professional development has been provided on a regular basis to.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
CERN Draft 0.2 July 26th, 2011IMWG - Workflow sub working group - draft Proposal.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Stoneworks Software Corp. Presents Delegate for Windchill® An Executive Overview.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Handling ALARMs for Critical Services Maria Girone, IT-ES Maite Barroso IT-PES, Maria Dimou, IT-ES WLCG MB, 19 February 2013.
Project Management Project Integration Management Minder Chen, Ph.D. CSU Channel Islands
Requirements Engineering Requirements Management Lecture-25.
Team Ramrod. Identify and Define The Problem Identify The Problem Low enrollment in the ICT programs. There seems to be a lack of interest in ICT related.
ATLAS M&O A: Collaborative Tools S. Goldfarb (5 June 2013)
Equipment Management Folder / MTF Travellers. Product Data Management A huge amount of product and engineering data stored in CERN databases – Design.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
JRA1 Meeting – 09/02/ Software Configuration Management and Integration EGEE is proposed as a project funded by the European Union under contract.
ILC EDMS Selection Committee Progress Report Tom Markiewicz SLAC 29 November 2005.
CONTRACT CONTROL. IPM Global – Why IPM Exists We believe Project Management Software should be easy to use. We believe Software should be flexible, and.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Scenario use cases Szymon Mueller PSNC. Agenda 1.General description of experiment use case. 2.Detailed description of use cases: 1.Preparation for observation.
State of Georgia RCA Process Narrative Review Training Session Aug. 09’
Configuration Control (Aliases: change control, change management )
Dave Barney, CERN. Tracking Tools: Introduction  Main Purpose: to keep track of all incidents & interventions at point 5  Interlocks – reasons & follow-up.
BUDGET 4Distribution of budget per phases of the project; 4Itemization of budget; 4Division of budget per source of contribution; 4Division of budget between:
Software Project Configuration Management
DataGrid Quality Assurance
Indico: Event Management
Change Control Module P5 LEARNING OBJECTIVES: LEARNING OUTCOMES
Nonconformance Tracking
Project Information Management Jiwei Ma
Software Requirements Review PMO - Provide COR Information to Vendors
Smart Connect – Supplier Portal Training
Progress on Standardization
iLab Reseachers Training
Contract Management Software 100% Cloud-Based ContraxAware provides you with a deep set of easy to use contract management features.
Presentation transcript:

Management Tools K. Pommès

Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases. The project organization needs tools for : Project Milestone follow-up Workpackage management Documents/Drawings management Equipment management Configuration management & Change Control

Management Tools - The Project Planning Design Purchasing Production Installation & Effective Communication Channels Web Portal Meeting Management Tool Audiovisual Systems Web Lecture Archival Mailing list Scientific Notes Workflows Collaborative documentation tool

Management Tools are “ indispensable ” to permit engineering communication throughout the project which shall : Implement common language and common rules (Quality Assurance Plan) insure coherence, data control and integrity In particular we have to ensure that all further technical changes are controlled with the appropriated mechanisms. The process must be defined in consistent way for reviewing, approving, implementing and reporting technical The Engineering Change Request (ECR) is required if the proposed change will : Have an impact upon ATLAS detector overall performance interfere with other systems result in significant cost and/or schedule changes has an impact on safety. Management Tools - Configuration Control

ECR Preparation in EDMS Control Internal/ General ECR ? Approval ECR Approved Quality Manager, System Project Leader Technical Coordination Requester ECR Rejected Internal : PLGeneral : TC ECR Process Creation phase Approval phase Notification phase Evaluation phase 1- ECR is created via a Document Management system (name, deadline, description of changes,..) 2- Data entered are stored in a database entry 3- is sent automatically to the PL in charge of the affected item 4- PL examines the proposed change / accept or reject the proposal 5- The ECR is considered to be valid : Proposed changes are reviewed and consolidated 6- is sent to all involved individuals 7- The ECR is extended with the list of activities which has to be proceeded 8- For internal change the ECR is approved at the System Level / for external change - at the Co- ordination Level 9- The Approval Group concludes with giving its opinion approving or rejecting the order 10- After approval the completed ECR is used as an ECD to inform all individuals in charge about the change implementation

Management Tools used by ATLAS Planning Design Purchasing Production Installation Project Milestone follow-up : (Microsoft Project) Workpackage management : (Project Progress Tracking) Documents/Drawings management (EDMS/CDD, CAD) Equipment Management (GLANCE) Change Control (EDMS + Web) Expediture Tracking (CET) & Web Portal Meeting Management Tool Audiovisual Systems Web Lecture Archival Mailing list Scientific Notes Workflows Collaborative documentation tool (developed with Dreamweaver) (Indico) (Meeting Facilities, Vidyo) (Lecture Archives) (eGroups) (CDS) (TWiki)

Management Tools – entry ? The Principal Web Page is the entry to retrieve all the information concerning the project : links allows the user to direct them to the different Web sites and General Information