Prototype Quadruple Pendulum Update – Part 1 Norna Robertson and Calum Torrie University of Glasgow for the GEO 600 suspension team LSC Meeting, Hanford,

Slides:



Advertisements
Similar presentations
Damping and Tuning of Violin Modes in Monolithic Silica Suspensions Stefan Goßler for the GEO 600 Team.
Advertisements

T1 task- update Mike Plissi. 2 Collaboration Groups actively involved INFN-VIRGO MAT IGR-Glasgow Groups that have expressed interest INFN-AURIGA CNRS-LKB.
G R LIGO Laboratory1 Advanced LIGO Research and Development David Shoemaker LHO LSC 11 November 2003.
Low Mechanical Dissipation in Fused Silica S. D. Penn, G. M. Harry, A. M. Gretarsson, S. E. Kittleberger, P. R. Saulson, J. J. Schiller, J. R. Smith, S.
LIGO-G D Suspensions Update: the View from Caltech Phil Willems LIGO/Caltech Livingston LSC Meeting March 17-20, 2003.
Overview of ACIGA high performance vibration isolator Jean-Charles Dumas Eu-Jeen Chin Chunnong Zhao Li Ju David Blair.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
1 LIGO-G v3 Transmission Monitoring Telescope and Suspension – TMS Eric Gustafson aLIGO NSF Review LIGO Livingston Observatory April 25-27, 2011.
Review of HAM Suspension Designs for Advanced LIGO Norna A Robertson HAM Isolation Requirements Review Caltech, July 11th 2005.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
LIGO-G D Suspensions Design for Advanced LIGO Phil Willems NSF Review, Oct , 2002 MIT.
Active Seismic Isolation Systems for Enhanced and Advanced LIGO Jeffrey S. Kissel 1 for the LSC 1 Louisiana State University The mechanical system for.
LSC Meeting August ‘04 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, Hanford Dave Ottaway for the LASTI team August.
LIGO-G R 1 LIGO Laboratory R&D for the period Fall 2007 to Fall 2008 Presented at the MIT MOU Review August 2007.
Advanced LIGO UK G K 1 Blade transmissibility by FEA Justin Greenhalgh, Rutherford Appleton Lab LSC, March 2004 LIGO-G K.
LIGO-G D 1 25-May-02 Advanced LIGO Suspension Model in Mathematica Gravitational Wave Advanced Detector Workshop Elba - May 2002 Mark Barton.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
EMDM Monolithic suspension development Activity plan Piero Rapagnani Detector meeting
Substrate mechanical loss studies Sheila Rowan (Stanford University) for: LIGO Laboratory (Caltech, MIT, LLO, LHO) LSC Partners (University of Glasgow,
LIGO-G LIGO Scientific Collaboration1 VIBRATION REDUCTION IN ISC PERISCOPE Peter Fritschel, Ken Mason, Richard Mittleman, Robert Schofield, Akiteru.
SUSPENSION DESIGN FOR ADVANCED LIGO: Update on GEO Activities Norna A Robertson University of Glasgow for the GEO 600 suspension team LSC Meeting, Louisiana,
Conceptual Design for Advanced LIGO Suspensions Norna A Robertson University of Glasgow and Stanford University for the GEO suspension team +contribution.
Design study for ET 3rd generation Gravitational Wave Interferometer Work Package 2 Suspension, Thermal noise and Cryogenics Piero Rapagnani
Update on Advanced LIGO suspension design and technology development towards the quad noise prototype Caroline A. Cantley for Advanced LIGO Suspension.
T1 task- update Mike Plissi. 2 Motivation  Thermo-elastic noise is higher than the ‘intrinsic’ noise in crystalline materials  There are several sources.
Advanced LIGO Suspension Status Caroline A. Cantley Advanced LIGO Suspension Team / University of Glasgow for the GEO600 Group LSC Meeting, LLO March 2004.
LIGO-G R The LIGO Advanced System Test Interferometer Mike Zucker, David Shoemaker, Ken Mason LLO LSC 16 March 2001.
LIGO-G D ETM STRUCTURAL DESIGN SUMMARY FEA OF PROPOSED ETM STRUCTURE ANSYS Workbench (ANSYS University Advanced) version 9.0 LIGO-G Z.
G Consideration of HAM SAS for Advanced LIGO David Shoemaker LIGO Excomm 30 April 07.
SUSPENSION DESIGN FOR ADVANCED LIGO: Update on GEO Activities Norna A Robertson University of Glasgow for the GEO 600 suspension team LSC Meeting, Hanford.
Simulation for KAGRA cryogenic payload: vibration via heat links and thermal noise Univ. Tokyo, D1 Takanori Sekiguchi.
Advanced LIGO UK G K 1 Some recent work on blade performance Caroline Cantley, Justin Greenhalgh, Mike Plissi, Norna Robertson, Calum Torrie,
Update on Suspension Activities for Advanced LIGO Caroline A. Cantley University of Glasgow for the GEO600 Group LSC Meeting, Livingston, March 2003 (Technical.
LIGO-G Z Thermal noise in sapphire - summary and plans Work carried out at: Stanford University University of Glasgow Caltech MIT.
LCGT Technical Review Suspension Point Interferometer for Parasitic Noise Reduction and an Additional IFO S.Miyoki (ICRR, Univ. of TOKYO)
Monolithic suspension assembly procedure (DRAFT) Status 27 th May 2009 LIGO-T v2.
Update on Activities in Suspensions for Advanced LIGO Norna A Robertson University of Glasgow and Stanford University LSC meeting, Hanford, Aug 20 th 2002.
Understanding Cabling Noise in LIGO Chihyu Chen Lafayette College Mentors: Mark Barton Norna Robertson Helpful Researcher:Calum Torrie Co-SURF:Julian Freed-Brown.
LSC Meeting March ‘05 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) Program Update: LSC Meeting, LLO Dave Ottaway for the LASTI team March 2006 LIGO-G Z.
Thermal Noise performance of advanced gravitational wave detector suspensions Alan Cumming, on behalf of the University of Glasgow Suspension Team 5 th.
Linear Dynamic Model for Advanced LIGO Isolation System Wensheng Hua, Brain Lantz, Dan Debra, Jonathan How, Corwin Hardham, Sam Richman, Rana Adhikari,
LIGO- G050xxx -00-D Advanced LIGO SUS Installation into BSC Chambers: Mechanical Fixtures Dennis Coyne (with input from many) G May 4 th 2005.
Low frequency anti-vibration system of LCGT Vibration Isolation Group R. Takahashi (ICRR), K. Yamamoto (ICRR), T. Uchiyama (ICRR), T. Sekiguchi (ICRR),
Modeling of the AdvLIGO Quad Pendulum Controls Prototype
Advanced LIGO UK 1 LIGO-G Z Development issues for the UK Advanced LIGO project Caroline Cantley Glasgow University for the UK Advanced LIGO Team.
LSC Meeting March ‘07 1 LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI) LASTI Progress and Plans LSC Meeting, LLO Dave Ottaway/Richard Mittleman March.
LIGO-G R Inverted pendulum studies for seismic attenuation Ilaria Taurasi University of Sannio at Benevento, Italy September 20, 2005 Supervisor.
Lasti ISI Update March 2007 On behalf of the SEI Team LIGO-G Z.
LIGO-G Z Silicon as a low thermal noise test mass material S. Rowan, R. Route, M.M. Fejer, R.L. Byer Stanford University P. Sneddon, D. Crooks,
LIGO-G Z LIGO’s Thermal Noise Interferometer Progress and Status Eric D. Black, Kenneth G. Libbrecht, and Shanti Rao (Caltech) Seiji Kawamura.
ALIGO 0.45 Gpc 2014 iLIGO 35 Mpc 2007 Future Range to Neutron Star Coalescence Better Seismic Isolation Increased Laser Power and Signal Recycling Reduced.
LSC Meeting Baton Rouge, LA, V.Boschi for the HAM-SAS team Ben Abbott, Valerio Boschi, Dennis Coyne, Michael Forte, Jay Heefner, Yu-mei Huang,
Modelling and Testing of Cryogenic Suspensions Giles Hammond Institute for Gravitational Research SUPA University of Glasgow on behalf of the KAGRA suspensions.
E. Majorana (INFN – Rome) ELiTES 3 rd General Meeting Hongo Campus – Tokyo – 9-10 Feb., 2015 Cryogenic platform with vertical suspension: a practical approach.
ALIGO Monolithic stage Giles Hammond, University of Glasgow for the Advanced LIGO Suspensions Team aLIGO/aVirgo Workshop Pisa, Italy 23 rd -24 th February.
Overview of monolithic suspension work for Advanced LIGO Mariëlle van Veggel, Mark Barton, Tim Bodiya, Alan Cumming, Liam Cunningham, Giles Hammond, Gregg.
Status of the cryogenic payload system for baseline KAGRA Rahul Kumar 1, K. Craig 2, K. Yamamoto 2, H. Tanaka 2, T. Miyamoto 2,T. Kajita 2, T. Suzuki 1,
Mechanical loss measurement for KAGRA sapphire suspension system Takafumi Ushiba Department of Physics, The University of Tokyo The first international.
LIGO LAB R&D PROGRAM TECHNICAL REVIEW, OCT 02
LIGO ADVANCED SYSTEMS TEST INTERFEROMETER (LASTI)
HLTS Kickoff Presentation Derek Bridges Bobby Moore July 7, 2011
Current and future ground-based gravitational-wave detectors
LV Meeting – 22 September 2009 Brett Shapiro G v1
Advanced LIGO Quad Prototype Janeen Romie LSC, March 2004
Lasti Update July 25, 2007 LIGO-G Z
Cryogenic Test Masses for LIGO Upgrades
The Superattenuator upgrades and the SAFE Project
Characterisation of the aLIGO monolithic suspensions
Measurements of Q in Suprasil 311SV
Fixed Support Design & Testing
Presentation transcript:

Prototype Quadruple Pendulum Update – Part 1 Norna Robertson and Calum Torrie University of Glasgow for the GEO 600 suspension team LSC Meeting, Hanford, 14 August 2001 Sus/Isol Working Group Session LIGO-G Z

Baseline Design for Adv. LIGO suspensions Fused silica ribbons suspending 40 kg sapphire mirror – lowest mass in quadruple pendulum Quadruple pendulum incorporating 3 stages of enhanced vertical isolation using blades local control sensors/actuators or eddy current damping on top mass overall length ~ 2 m all locally controlled freqs. in range ~ Hz global control above 0.01 Hz, split between 3 controllers on 3 lowest stages, acting against quad. reaction pendulum

Mechanical Design – first steps Design of prototype all-metal quadruple pendulum and reaction pendulum and Bosch support frame carried out in Glasgow (Torrie et al): masses (top to bottom) 15, 15, 16, 30 kg. Penultimate mass aluminium with central hole and lowest mass aluminium with steel insets, to mimic silica and sapphire respectively (with same dimensions). Upper masses designed to incorporate blades. Autocad diagrams produced, and parts procured. Some preassembly carried out in Glasgow, excluding blades (due to late delivery). Parts sent to MIT late June Calum Torrie and Norna Robertson spent ~1 month at MIT June/July

Mechanical Design of Quadruple Suspension – Autocad Diagrams

Autocad Diagrams contd.

Autocad diagrams contd.

Autocad Diagrams contd.

Bosch Frame

Top Blades

Top and Second Mass Top mass before its blades were loaded Second mass after its blades were loaded

Methods of Wire Attachments steel clamp for blade barrels with grooves- part of second mass penultimate mass

Penultimate and Final Masses

Top Mass with Local Controls

General Views

Assembly on Vacuum Platform

The Happy Parent

Lessons Learned So Far Design of upper masses incorporating blades requires modifying to strengthen Method of putting grooves in clamps, and of tightening clamps, requires care Method of adjusting tilt in masses with blades: top mass adjustment worked well, extend to next mass Experience in assembling masses, preparing wire lengths with jigs, installing blades, adjusting, disassembling etc. important Bosch frame structure works well for prototyping Handling these sizes of masses non trivial – moving to larger masses will involve specialist lifting and handling equipment

Thanks Many people contributed to the assembly of the quads at various times: Dan Mason, Ken Mason, Richard Mittleman, Michael Perreur-Lloyd, Janeen Romie, Virginio Sannibale, Phil Willems …….. and invaluable technical assistance from Myron MacInnis and Fred Miller

Future Work mode frequencies active damping - impulse responses transfer functions eddy current damping global control feedback design, engineering issues for next prototype