Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.

Slides:



Advertisements
Similar presentations
Water Source Heat Pump Systems
Advertisements

Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
The DB In-Line Pumpout Unit Easy-to-use control panel with one switch to run the unit. 15 AMP reset fuse. 115 AC External water pump and tank drain have.
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Xe leak status C. Garabatos. Leak story The maximum allowable leak rate corresponds to a loss of 10% of the total volume in one year – 0.3 l/h for the.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
19 May 09P. Tropea1 Fluorocarbon systems –SS1 hydraulics completed, now under commissioning –SS2 connections and sensors installation done –Pixels ready.
WA104 Cryogenics Design Status David Montanari / Johan Bremer May 21, 2015 Rev. 1.
TS4 preparatory meeting TS4 – weeks Underground access possible in week 51 – as from Monday morning 9:30 –Ulli and Philippe will start.
winter shutdown preparatory meeting A.Tauro /12/11ALICE winter shutdown schedule - A.Tauro 1.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
CLAUDIO BORTOLIN SPD Cooling Status INFN – PD / CERN.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
Launch Chameleon Plus P - More Preventive features and safety L - More Longer Lasting and robust U - More User friendly operation S - More Service friendly.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
winter shutdown planning A.Tauro
winter shutdown planning A.Tauro
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
CMS consolidation activities of detector cooling system Detector cooling project P. Tropea.
ALICE 5 o’clock meeting Wk 49. INDICO You’ll find this meeting here: – The full shutdown planning.
ALICE TC Meeting – CV Detcool1 LHC stop 31 May, 1-2 June – CV/DETCOOL Interventions Cavern interventions: 31 9:15: Sampling with RP.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Building 180 NORMATEF TEST FACILITY Demineralized cooling water station upgrade R. Bozzi / EN-CV.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
1.8 K cycle and specificities CC: - 3D wheels - Bearings (300K) HX: - Very Low Pressure “Mixed” Compression P ratio ≈ 80 HX Stainless Steel Plate Axial-centrifugal.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
TS3 preparatory meeting A.Tauro. General information LHC-TS3: from Mon 9 6am, to Fri 13 5pm LHC beam stops on Mon morning at 6:00.
TC meeting P2 planning wks 3&4 A.Tauro
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
Demineralised water cooling system
Stato del sistema di raffreddamento del rivelatore SPD di ALICE
ALICE 5 o’clock meeting Wk 51.
Unit 37: Fluid containment Dr
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
R1 Fundamentals of Refrigeration
Filter drilling status
Rosario Turrisi INFN Padova
Performance of an Automated Water Based Cooling System for CBM MuCh
Tracker cooling loop “check out” draft for discussion
ALICE 5 o’clock meeting Wk
Mathieu, Gabriel, Max, Spyros, Guillaume
ITS Cooling: Xmas Plan Claudio Bortolin.
ALICE 5 o’clock meeting Wk
Unit 37: Fluid containment Dr
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
SB Packing Automatic Downpuller Power Unit
R1 Fundamentals of Refrigeration
November technical stop activities:
Presentation transcript:

Claudio Bortolin

Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to detect the presence of the hole Cleaning: – rilsan pipe connected to a rotary vane vacuum pump – magnet tip on twisted ss cable – cleaning machine to force counter-flow wise a cleaning fluid

 Drilling:  the drill rotates the tool inside the pipe  pressure drop (~20-30 mbar) on a manometer with specific trend when hole is done  Cleaning: 1. suction of drilling remains with small pipe inside the stainless steel pipe (down to the filter) and vacuum pump 2. ‘’walk’’ with magnet inside the pipe  the steel of the filter is slightly magnetic 3. counter-flow with C 6 F 14 for 1.5 bar 4. pipe drying with Ar 1.5 bar 5. repeat more times (5 cycles total) 6. last counter-flow with fluid lasts 12 h

Particles collected before… …and after cleaning!

 It never worked properly (max result: 6 HSs ON beginning of 2008)  vacuum cleaning + 3 magnet sweeps + vacuum cleaning + counterflow  last counterflow left running overnight  flow: from 0.27 to 0.46 g/s  Drilling: Wed 15 Feb morning  Cleaning: 5 cycles (overnight counter-flow between cycle 3 and 4)  Results: Flow=2.0 g/s at 4,5 bar (was: 0,27 g/s at 6,3 bar) Modules on= 100% (was: 0%)

06/12/2015Claudio Bortolin - CERN9 This isn’t a fake panel, the values are real!!

 The filter was drilled last Monday morning.  We expect to restart loop/sector this afternoon: waiting for SEM results  Other sectors will be drilled according to the results of sector 7  Drilling schedule to be decided soon (Technical stops time table) Sector 7  Cleaning is ongoing

pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water valve: replaced (it was leaking) safety valve on the tank: replaced alarm security test: done upload new program PLC (ramp of p regulator SSD): done temperature sensors loop 17 & 18: replaced          F i n i s h e d

pump replaced dehydrator cartridge replaced inlet mechanic 1um filter replaced chilled water valve replaced (leak on the top) one of compressor was replaced some safety valves were recalibrated and installed (10 bar pump valve and 8,5 bar in the inlet manifold, 3,5 bar tank valves): done 10 safety valves on the loops (return side) replaced test security alarm: to be done BPRs installation: Postponed to 2013         

Dec JanFebMar Wk Mo 5 After 17: After 17: Tu We Th After 17:00 DSO Fr AUG 48V (EL)Lift Sa After 17:00 Su Xmas Day NY Day 21/2/12 ALICE winter shutdown schedule - A.Tauro UX25 access restrictions Access restrictions: Removal/installation of shielding (restriction includes RB24 triplets) PX24 blocks: no access CR5 and UX25 PX24 beams (35t): no access CR1-5, Expo, and UX-25 All other blocks: no access to UX-25 (or 1-2 teams max, not on A-side) TRD insertion: no access to MNF and L3 AUG test (Arrêt Urgence General – General Emergency Stop) – no access UX25 DSO test (Department Safety Officer) – no access UX25 No access SX2 during manipulation of blocks in SX2 (except ACR and WRs) Close L3 Open L3 Legend No access (except transport) Access possible No access 13