1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Philip Burrows CLIC MDI Meeting 6/11/091 Design issues for IP intra-train feedback Philip Burrows John Adams Institute Oxford University.
Philip Burrows ALCPG Workshop, SLAC: BDIR Working Group 08/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 December 2003 run results Philip Burrows.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Philip Burrows LCABD Meeting, RHUL 12/04/07 WP7: Beam feedback and control systems Philip Burrows John Adams Institute Oxford University.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
P.N. Burrows ATF2 Project Meeting, KEK, 18/12/061 Philip Burrows John Adams Institute Oxford University LCABD ATF / ATF2 ESA Miscellaneous FONT.
Some simulation results on FF/FB system for ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 25, 2008.
P.N. Burrows GDE/MDI Vancouver 19/7/06 (T-488) Philip Burrows John Adams Institute Oxford University EM Background Tests of Feedback BPM.
P.N. Burrows BDS/MDI, LCWS08 Chicago, 17/11/081 Beam-based feedback for LC ILC luminosity goal 10**34 / cm**2 / s 3000 or 6000 bunches, spacing ns.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
Philip Burrows Third Mini Workshop on Nano Project, KEK 30/5/05 Philip Burrows Queen Mary, University of London Overview of Intra-train Beam Feedback Program.
N. BlaskovicFONT Meeting1 ATF February-March 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
FONT IP intra-train feedback prototype status
Philip Burrows LCUK Meeting, Oxford 29/01/04 Feedback on Nanosecond Timescales (FONT): FONT2 run results Dec 03/Jan 04 Philip Burrows Queen Mary, University.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
Development of beam-based intra-train feedback systems Glenn B. Christian Post-doctoral Research Assistant on Feedback on Nanosecond Timescales (FONT)
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Philip Burrows ECFA LC Workshop, Warsaw, 10 June Philip Burrows John Adams Institute Oxford University G. Christian, C. Clarke, B. Constance, H.
Feedback On Nano-second Timescales: An IP Feedback System for the Future Linear Collider Requirement for a fast IP beam-based feedback system Simulation.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
3/25/2006 KEK LCPAC Marc Ross - SLAC 1 Results of Beam Instrumentation Studies at ATF 1.Nanometer resolution Beam Position Monitors 2.High resolution readout.
P.N. Burrows ECFA/GDE Meeting, BDIR session, Valencia, 9/11/06 Philip Burrows John Adams Institute Oxford University FONT4 tests at KEK/ATF EM background.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Philip Burrows ATF 15/03/05 FONT Group Progress + Plans 2005 Philip Burrows, Christine Clarke, Glenn Christian, Hamid Dabiri Khah, Stephen Molloy, Glen.
Philip Burrows ALCPG11, Eugene 21/03/111 Performance of FONT at ATF2 Philip Burrows John Adams Institute Oxford University.
1 FONT IP Feedback System Implications of increase of L* Philip Burrows John Adams Institute Oxford University.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
Design of the ATF2 FB/FF Systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group Final EUROTeV Scientific Workshop Uppsala, 25-27th.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
Design and Simulation of Intra-train Feedback Systems at ATF2: Current Status and Future Plans Javier Resta Lopez (JAI, Oxford University) for the FONT.
Philip Burrows 2 nd Nano Workshop, KEK 11/12/04 Plans for FONT3 and Future Feedback Experiments Philip Burrows Queen Mary, University of London ILC system.
N. BlaskovicFONT Meeting1 ATF October 2014 shift plan N. Blaskovic.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 DR -> IP Beam Transport Simulations with Intra-Train Feedback Glen White, SLAC Jan 19 th 2006.
Design of ATF2 feedback/feed-forward systems Javier Resta Lopez (JAI, Oxford University) for the FONT project group LC-ABD meeting Birmingham, 17-18th.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
G.R.White: F.O.N. T. From Ground Motion studies by A.Seryi et al. (SLAC) ‘Fast’ motion (> few Hz) dominated by cultural noise Concern for structures.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Overview of progress at FONT Neven Blaskovic TMD technologies CASE student John Adams Institute Oxford University.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Talitha Bromwich, Glenn Christian, Colin Perry, Rebecca Ramjiawan John Adams Institute,
Philip Burrows X-band 2010 Daresbury 2/12/101 Advanced beam feedback systems Philip Burrows John Adams Institute Oxford University.
D. BettATF Operations Meeting - 15 June IP C. Perry G. Christian Y. Kim D. Bett N. Blaskovic Kraljevic.
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
Dither Luminosity feedback versus Fast IP feedback
In collaboration with P. N. Burrows, A. Latina and D. Schulte
Transverse Beam Jitter Propagation in Multi-bunch Operation at ATF2
Progress towards nanometre beam stabilisation at ATF2
Progress towards nanometre level beam stabilisation
Feed forward orbit corrections for the CLIC RTML
Presentation transcript:

1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University

2 IP intra-train feedback system - concept Last line of defence against relative beam misalignment Measure vertical position of outgoing beam and hence beam-beam kick angle Use fast amplifier and kicker to correct vertical position of beam incoming to IR FONT – Feedback On Nanosecond Timescales (Oxford, RHUL, Valencia, CERN, DESY, KEK, SLAC)

3 FONT beam tests NLCTA ATF(2005) ATF(2008) Beam energy GeV Electrons/bunch **10 Bunches/train Bunch spacing ns Train length17756 ~300 ns Train repetition rate Hz

4 FONT beam tests NLCTA ATF(2005) ATF(2008) Beam energy GeV Electrons/bunch **10 Bunches/train Bunch spacing ns Train length17756 ~300 ns Train repetition rate Hz CLIC-like

5 CLIC-relevant: all-analogue systems NLCTA (SLAC): 65 MeV beam, 170ns train, 87ps bunch spacing FONT1 (2001-2): First demonstration of closed-loop FB: latency 67ns 10/1 beam position correction FONT2 (2003-4): Improved demonstration of FB: latency 54ns real time charge normalisation with logarithmic amplifiers beam flattener to straighten train profile solid-state amplifier ATF (KEK): 1.3 GeV beam, 56ns train, 2.8ns bunch spacing FONT3 (2004-5): Ultra-fast demonstration of FB: latency 23 ns 3 stripline BPMs high-power solid-state amplifier FONT prototype history: CLIC

6 FONT beam tests NLCTA ATF(2005) ATF(2008) Beam energy GeV Electrons/bunch **10 Bunches/train Bunch spacing ns Train length17756 ~300 ns Train repetition rate Hz

7 FONT beam tests NLCTA ATF(2005) ATF(2008) Beam energy GeV Electrons/bunch **10 Bunches/train Bunch spacing ns Train length17756 ~300 ns Train repetition rate Hz ILC-like

8 KickerBPM 1 Digital feedback Analogue BPM processor Drive amplifier BPM 2 BPM 3 e- ILC prototype: FONT4 at ATF

9 FONT ILC prototype status Bunch-by-bunch feedback for intra-train operation Stripline BPM resolution in single-pass mode: goal ~ 1um  < 0.5 um achieved (world record?)

10 BPM processor resolution 3 BPM processors (5,7,10) on BPM P2 8-hour shift:  mexpectation from  mADC noise alone:  m  m  m  m Beam position jitter 3- 4  m

11 FONT ILC prototype status Bunch-by-bunch feedback for intra-train operation Stripline BPM resolution in single-pass mode: goal ~ 1um  < 0.5 um achieved (world record?) Latency: goal ~ 150ns (shortest possible ILC bunch spacing)  133ns achieved (including cables)

Latency Latency 133ns

Latency estimate 13

14 FONT ILC prototype status Bunch-by-bunch feedback for intra-train operation Stripline BPM resolution in single-pass mode: goal ~ 1um  < 0.5 um achieved (world record?) Latency: goal ~ 150ns (shortest possible ILC bunch spacing)  130ns achieved (including cables) Dynamic range: goal nm (250 GeV ILC beam energy)  nm achieved

6 Kick strength Kick: urad

16 FONT ILC prototype status Bunch-by-bunch feedback for intra-train operation Stripline BPM resolution in single-pass mode: goal ~ 1um  < 0.5 um achieved (world record?)CLIC Latency: goal ~ 150ns (shortest possible ILC bunch spacing)  130ns achieved (including cables) Dynamic range: goal nm (250 GeV ILC beam energy)  nm achievedCLIC

FB performance With banana correction

FB performance Incoming position scan

FB jitter reduction (good beam) Bunch 1 Bunch um  0.4 um Factor of 5 jitter reduction

FB jitter reduction (good beam) Bunch 1 Bunch 2 Bunch um  0.4 um  0.8 um

FB jitter reduction (bad beam) Bunch 1 Bunch 2 Bunch 3 13 um  5 um  3 um

22 FONT ILC prototype status Prototype system designed to meet ILC specifications for IP intra-train FB Extensively tested with beam Performs well  2 nm beam 250 GeV

23 FONT5 system When ATF beamline was reconfigured for ATF2 we installed 2 kickers and 3 stripline BPMs in upstream section Dedicated position + angle FB system Emphasis is on quality of beam correction, with y, y’ system, in terms of reduction of train jitter Typically use 2-bunch train so as to maximise bunch 1 – bunch 2 correlation

24 FONT5 location at ATF2 ATF2 extraction line 24

25 FONT5 setup QD10XQF11XQD12XQD14XQF13XQF15XK1K2 P2P3P1 To dump FB board DAQ P2  K1 (‘position’) P3  K2 (‘angle’) P3  K1 P2  K2 25

FONT5 Hardware Analogue Front-end BPM processor FPGA-based digital processor Kicker drive amplifier Strip-line BPM with mover system Strip-line kicker

27 Gain matrix G (K1 - P2)G (K1 - P3) G (K2 - P2)G (K2 - P3)

Feedback Performance (example)

29 bunch 12 FB off FB off Jitter P P Feedback Performance (example)

30 bunch 12 FB offon FB offon Jitter P P Feedback Performance (example)

31 bunch 12 FB offon FB offon Pred. Jitter P correl 98% 0.67 P correl 97% 0.83 Feedback Performance (example)

32 Tests (Dec 2011 – April 2012) Instrumentation of downstream stripline BPMs as witnesses Brief study of variation of ATF2 optics (1 shift)

33 Additional witness BPMs QD10XQF11XQD12XQD14XQF13XQF15XK1K2 P2P3P1 To dump FB board DAQ 33 MFB1FF ‘borrow’ these BPMs for our shifts

07/12 FB Run 23 (nom. optics)

13/12 FB Run 3 (nom. optics)

13/12 FB Run7 (QS,QK off)

14/12 FB Run 6 (QK off)

38 Tests (Dec 2011 – April 2012) Instrumentation of downstream stripline BPMs as witnesses Brief study of variation of ATF2 optics (1 shift) Study of LO phase jitter on FB performance (2 shifts) Tests of new firmware including LO phase compensation (2 shifts) – study ongoing

39 Tests (June – Oct 2012) Preparations for beam stability in IP region with 2-bunch beam: 1.Readout of IPBPMs with 2-bunch beam + test of IP kicker (4 shifts) 2. Upstream FONT FB: record beam in IPBPMs (4 shifts)  report in Friday session on ATF2 goal 2 3. Feed-forward from upstream FONT BPMs  IP kicker: record beam in IPBPMs 4. IP FB using IPBPM signal and IP kicker